flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

SOM’s Salt Lake City skyscraper uses innovative structural system to suspend itself over a neighboring building

High-rise Construction

SOM’s Salt Lake City skyscraper uses innovative structural system to suspend itself over a neighboring building

The hat truss-supported office tower was topped off in January, rising 25 stories above the Salt Lake City streets.


By BD+C Editors | March 28, 2016

Rendering © Skidmore, Owings & Merrill LLP

Located in the heart of downtown Salt Lake City, 111 Main is the freshest face on the Crossroads of the West’s skyline. The building, whose roof hat truss structure was just topped off in January, transferred its loads from a temporary shoring support system to the permanent structural system during a 12-hour period.

The building’s architect and structural engineer, Skidmore Owings & Merrill, had to find a solution to a complex problem brought on by the building site's location: how to suspend a portion of the building over an adjacent structure.

111 Main is on a contiguous parcel with the new Salt Lake County Center for the Arts’ George S. and Dolores Doré Eccles Theater, which overlaps on the lower four stories and basement level of the tower footprint. To accommodate the Eccles Theater under the southern portion of 111 Main’s tower, a structural system was required that did not extend columns below the fifth level of the tower on the south side.

SOM designed the penthouse roof level of the 387-foot-tall building to be comprised of a balanced two-way steel hat truss system that supports the office tower’s 18 perimeter columns in an integrated load-balanced structure. The central reinforced concrete core walls provide the only connection of the tower to its foundation and resist all gravity loads, as well as wind and seismic vertical and lateral loads. In fact, 111 Main was designed and built to withstand a 2,500-year earthquake event.

 

Photo: City Creek Reserve, Inc.; Rendering: SOM 

 

Conventional long-span, composite-steel floor framing construction connects the central core walls to the perimeter steel frame and suspended columns, providing open office spaces free of interior columns and a completely column-free lobby at the tower’s base.

111 Main is looking to achieve LEED Gold certification by using less energy and water and reducing greenhouse gas emissions. Building operation is targeted to operate 15% below Utah’s energy codes and will utilize fully automated, under-floor energy conserving HVAC systems with 16-inch raised floors.

The aforementioned lobby will consist of 35-foot-tall clear glass and span 5,876 sf. Overall, there will be approximately 440,000 sf available to rent.

Because of the unique hat truss structural system that allows for a column-free floor design throughout, the use of floor-to-ceiling glass offices stands out even more. One of the more unique amenities is the building lobby’s connection to the Eccles Theater Grand Lobby, the building that 111 Main hovers over and fits with like a Tetris piece.

A combination of five low-rise elevators, four high-rise elevators, and one freight elevator will be used to get people where they need to go within the structure. 111 Main will feature state-of-the-art fiber infrastructure, redundant data feeds, and electricity sourced from two substations.

Joining SOM on the Building Team is Oakland Construction (GC) and City Creek Reserve (Developer).

The anticipated completion date for 111 Main is August 2016.

Related Stories

High-rise Construction | Jan 18, 2019

‘Paramount’ will become Nashville’s tallest tower

Goettsch Partners is the project’s architect.

High-rise Construction | Jan 14, 2019

AS+GG-designed tower will be the tallest in China

The tower is at the center of the Shimao Longgang Master Plan.

High-rise Construction | Jan 10, 2019

Indoor-outdoor amenities open leasing value at a San Francisco skyscraper

The amenities that set this 605-foot-tall building apart are its 50,000 sf of outdoor and open spaces that include 14 skydecks and large terraces on its 12th and 28th floors.

High-rise Construction | Dec 13, 2018

Record number of 'supertall' towers were completed in 2018

Citic Tower in Beijing and Vincom Landmark 81 in Ho Chi Minh City are among 18 "supertall" skyscrapers completed this year—a record number, according to the Council on Tall Buildings and Urban Habitat. 

High-rise Construction | Aug 27, 2018

The world’s tallest buildings with dampers

The CTBUH created the list as part of a recent study.

High-rise Construction | Aug 8, 2018

Bjarke Ingels Group’s new Shenzhen tower includes a folded building envelope

The new skyscraper is the home of Shenzhen Energy Company.

Multifamily Housing | Aug 7, 2018

Even after redevelopment, the iconic 'Chicago Tribune' sign will remain at 435 N. Michigan Ave.

The newspaper and the building's new owners reached a settlement.

Lighting | Aug 1, 2018

Willis Tower upgrades antenna lighting

The new lights will save Willis Tower more than 70% in antenna-lighting energy costs.

High-rise Construction | Jul 31, 2018

A 350-foot waterfall splashes down from a skyscraper in China

The tower is located in Guiyang’s central business district.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021