flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Smart windows installed at NREL

Smart windows installed at NREL


By By BD+C Staff | September 23, 2011
The self-tinting heat-activated filter allows solar heat into the building when it is desired, such as on a sunny winter day.

The installation of RavenWindow smart window technology was recently completed at the U.S. Department of Energy’s Research Support Facility (RSF) on the campus of the National Renewable Energy Laboratory (NREL).
The self-tinting heat-activated filter allows solar heat into the building when it is desired, such as on a sunny winter day. Then, it blocks the sun when it’s not desired, such as on a hot summer day. Unlike window blinds, when the window is in the tinted state and blocking solar heat from entering the building, the occupants still can see outside and enjoy the view. Because of the energy savings, reduced glare and increased occupant comfort provided by managing the solar heat gain, the window swill also be installed at the RSF expansion wing, to be completed in late 2011.
“We are very pleased to have concluded the first ever installation of RavenWindow technology, and we could not have asked for a better first customer,” said Alex Burney, CEO of RavenBrick LLC.
“By adopting RavenWindow in this prestigious building, DOE and NREL have made a significant contribution to the creation of vital jobs in the clean-tech economy. This is an encouraging example of the merits of public and private sector partnership,” added Burney. BD+C

Related Stories

| Jun 13, 2012

Steven L. Newman Real Estate Institute to hold energy asset conference for property owners, senior real estate managers

Top-level real estate professionals have been ignored as the industry has pushed to get sustainability measures in place.

| Jun 12, 2012

SAC Federal Credit Union selects LEO A DALY to design corporate headquarters

LEO A DALY also provided site selection, programming and master planning services for the project over the past year.

| Jun 12, 2012

BCA Architects transforms Anaheim schools into dynamic learning environments

BCA Architects was selected to update the district's long-range master plan.

| Jun 11, 2012

Hill International selected as CM for Porto Arabia Towers in Qatar

The complex is a mixed-use development featuring both residential and commercial properties.

| Jun 8, 2012

Living Building Challenge wins the 2012 Buckminster Fuller Challenge

The Living Building Challenge was chosen from a pool of 122 of entries from around the world.

| Jun 8, 2012

Nauset Construction completing sustainable dorm for Brooks School

Student input on green elements provides learning experience.

| Jun 8, 2012

Skyline Construction names Millitello president

Millitello is a 31-year veteran who has overseen the construction of campus-size projects.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

Ground broken for Children’s Hospital Colorado South Campus

Children’s Hospital Colorado expects to host nearly 80,000 patient visits at the South Campus during its first year.

| Jun 1, 2012

K-State Olathe Innovation Campus receives LEED Silver

Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.

boombox1 - default
boombox2 -
native1 -

More In Category

AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021