flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Shakespeare goes green in Massachusetts

Shakespeare goes green in Massachusetts


August 11, 2010
This article first appeared in the 200711 issue of BD+C.

Automatic daylight sensors, translucent clerestory windows, and a climate control system are a few of the sustainable features of the new Shakespeare & Company Center in Lenox, Mass. Designed by Great Barrington, Mass.-based Clark & Green, the project involves transforming a major portion of an existing 54,000-sf fieldhouse into a 31,200-sf theater. When completed in April 2008, the facility will include three interconnected zones: a rehearsal area comprised of three studios; a two-story technical development area housing consolidated scene, prop, and costume shops; and a performance venue that includes a flexible studio theater with multiple seating configurations for 155 theatergoers.

boombox1 - default
boombox2 -
native1 -
halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021