flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Reconstruction Awards: The Gallery at the Three Arts Club

Reconstruction Awards

Reconstruction Awards: The Gallery at the Three Arts Club

On the exterior of the building, masonry and terra cotta were revitalized, and ugly fire escapes on the south façade were removed.


By BD+C Staff | November 14, 2016

Pepper Construction and Booth Hansen Architecture worked with Chicago Landmarks Commission officials to identify historic elements in the Three Arts Club. Original wood doors and windows were restored. Windows on the upper floors were replaced with fenestration that matched the historic profile of the originals. Photo: © 2015 RH

The Three Arts Club, a 1914 Holabird & Roche building, was once used as a home and club for women involved in music, painting, and drama. A recent repurposing added new spaces and restored historically significant details to convert the 65,000-sf building into  Restoration Hardware’s Chicago Gallery. On the exterior, masonry and terra cotta were revitalized, and ugly fire escapes on the south façade were removed.

Two new spaces were added: a two-story atrium, used as a public dining area; and a rooftop space consisting of additional rooms and open air terraces used to display indoor-outdoor merchandise.

The existing basement proved too small for Restoration Hardware’s needs. To enlarge the basement below the original courtyard, the contractor, Pepper Construction, secured an excavator that could squeeze into the 45x45-foot space and crane-lifted it into place without hitting the building. Three weeks of excavation later and the site was big enough to serve as a functional basement. 

 

PROJECT SUMMARY 

 

Silver Award Winner | Chicago, Ill.

Building Team: Pepper Construction Company (submitting firm, GC); Restoration Hardware (owner); Booth Hansen Architecture (architect); Forefront Structural Engineers Inc. (SE); Block Electric Company (electrical engineer); Norman Mechanical Inc. (plumbing engineer).

Details: 65,000 sf. Construction time: August 2014 to September 2015. Delivery method: CM at risk.

Related Stories

Reconstruction Awards | Nov 11, 2016

Exclusive Chicago club re-emerges as a boutique hotel

Built in 1893 for the World’s Columbian Exposition, the CAA was an exclusive social club founded by leading figures in American sports and commerce.

Reconstruction Awards | Dec 1, 2015

Massive Chicago parking garage gets overdue waterproofing

Millennium Lakeside Garage, the largest underground parking facility in the U.S., hadn’t been waterproofed since the 1970s. The massive project took nearly 2½ years and 33,554 man-hours.

Reconstruction Awards | Nov 30, 2015

Washington Monument restored after 2011 East Coast earthquake

This restoration and repair project, which was completed under budget and eight days early (despite several setbacks), involved re-pointing 2.5 miles of mortar joints, repairing 1,200 linear feet of cracks, and installing 150 sf of Dutchman repairs. Construction took place from November 2011 to May 2014.

Reconstruction Awards | Nov 30, 2015

Denver's 107-year-old seminary campus modernized

The scope of the project included the seminary dorms, library, and chapel, all of which posed their own set of obstacles.

Reconstruction Awards | Nov 24, 2015

Center of I.M. Pei-designed plaza part of Washington redevelopment

The L’Enfant Plaza, a three-story below-grade mall, was renovated to include a new glass atrium pavilion and a 40-foot-long, interactive LED.

Reconstruction Awards | Nov 24, 2015

Manhattan's first freestanding emergency department a result of adaptive reuse

The Lenox Hill Healthplex, a restoration of the Curran O’Toole Building, has glass-block walls and a carefully preserved exterior.

Reconstruction Awards | Nov 19, 2015

Nave restored at Yale’s Sterling Memorial Library

Turner Construction and Helpern Architects revived the 150-foot-long nave, which was embellished with stained glass windows by G. Owen Bonawit, stone carvings by René P. Chambellan, and decorative ironwork by Samuel Yellin.

Reconstruction Awards | Nov 19, 2015

Infinite Chicago redevelopment bridges past to present

The renovation of three historic downtown buildings—the Gibbons and Steger Buildings and Pickwick Stables—includes a multi-level concrete walkway connection.

Reconstruction Awards | Nov 18, 2015

Sun Theater serves the youth of St. Louis

Lawrence Group and property owner TLG Beaux Arts raised $11 million to restore the 26,000-sf theater into a modern performance venue.  

Reconstruction Awards | Nov 17, 2015

Smithsonian Institution’s Arts and Industries Building again an exposition and museum space

After removing decades’ worth of unfortunate additions to expose 17 historic interior spaces for the National Historic Landmark, the Building Team zoned in on the client’s key concern.  

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021