flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Promise fulfilled: Park West, Texas A&M University

Building Team Awards

Promise fulfilled: Park West, Texas A&M University

Silver Award: A P3-driven team completes this mega off-campus student housing complex ahead of its fast-track schedule.


By David Barista, Editorial Director | May 21, 2018
Park West Aerial View
Park West Aerial View

Fifteen buildings, 2.2 million sf, 3,406 beds, spread across 47 acres. If the scale of the new Park West student housing development at Texas A&M University does not impress, then the pace of work just might. This massive project, built under a public-private partnership, was completed in just two years, much of it ahead of the original schedule.

The team employed a fast-track design-build delivery method that synchronized design with construction (sequenced east to west on the project site) to compress the overall schedule. Using this approach, combined with prefabrication techniques and Lean construction strategies, the project team determined that it could complete half of the flats buildings—representing 120 units, 216 beds—one year ahead of schedule (fall 2016). The second row of flats (216 beds) was turned over six months early (January 2017). This allowed the client, student housing development and property management firm Servitas, to open a sizable portion of the development early for leasing opportunities to Texas A&M students.

To further support leasing efforts, the project team modeled 1.4 million sf of the Park West development in a virtual environment. This allowed prospective tenants to take VR tours of the units and building amenities before construction was completed. The VR model also assisted with client decision making and advanced coordination among the various subcontractors, including structural, mechanical, electrical, and plumbing.

Located on the west side of campus, adjacent to the football stadium, Park West is designed as a self-contained community, with four shuttle bus stops, a convenience store, coffee shop, and a host of amenities: three pools, a jogging trail, three fitness centers, 50+ study lounges, and pet-friendly living. The centerpiece is a 50,000-sf rooftop lounge and deck, with a football field-sized pool, hot tub, and cabanas.

The team partnered with Texas A&M’s engineering and construction services departments to educate students on the project, by hiring interns, offering on-site learning, and guest speaking in the classroom.

“I had a vision that needed to be completed in a very small window of time to meet the demand Texas A&M University had for its growing student population,” says Rafael Figueroa, CEO, Servitas. “Weitz was the only firm with which I felt comfortable entrusting my company’s reputation, and they executed to perfection.”

 

More than 200 units were completed six months to a year ahead of the original schedule using prefabrication and Lean construction techniques. Jim Joham.

 

Building Team – Submitting firm, general contractor The Weitz Company Owner Servitas Architect PGAL Structural engineer SCA Consulting Engineers Mechanical, plumbing engineer Kilgore Industries Electrical engineer Power Design

General Information — Size 2.2 million sf Construction cost $252 million Construction time August 2015 to July 2017 Delivery method Design-build

 

Return to the 2018 Building Team Awards Landing Page

Related Stories

Building Team Awards | May 27, 2016

Big police academy trains thousands of New York's finest

The Police Training Academy in Queens, N.Y., consists of a 480,000-sf academic/administration building and a 240,000-sf physical training facility, linked by an aerial pedestrian bridge.

Building Team Awards | May 26, 2016

Cimpress office complex built during historically brutal Massachusetts winter

Lean construction techniques were used to build 275 Wyman Street during a winter that brought more than 100 inches of snow to suburban Boston.

Building Team Awards | May 25, 2016

New health center campus provides affordable care for thousands of Northern Californians

The 38,000-sf, two-level John & Susan Sobrato Campus in Palo Alto is expected to serve 25,000 patients a year by the end of the decade.

Building Team Awards | May 24, 2016

Los Angeles bus depot squeezes the most from a tight site

The Building Team for the MTA Division 13 Bus Operations and Maintenance Facility fit 12 acres’ worth of programming in a multi-level structure on a 4.8-acre site.

Building Team Awards | May 23, 2016

'Greenest ballpark' proves a winner for St. Paul Saints

Solar arrays, a public art courtyard, and a picnic-friendly “park within a park" make the 7,210-seat CHS Field the first ballpark to meet Minnesota sustainable building standards.

Building Team Awards | May 20, 2016

Pittsburgh's Tower at PNC Plaza raises the bar on high-rise greenness

The Building Team designed the 800,000-sf tower to use 50% less energy than a comparable building. A 1,200-sf mockup allowed the team to test for efficiency, functionality, and potential impact on the building’s occupants.

Building Team Awards | May 19, 2016

Chinatown library unites and serves two emerging Chicago neighborhoods

The 16,000-sf, pebble-shaped Chinatown Branch Library was built at the intersection of new and old Chinatown neighborhoods. The goal is for the building to unite the communities and serve as a catalyst for the developing area.

Building Team Awards | May 19, 2016

NYC subway station lights the way for 300,000 riders a day

Fulton Center, which handles 85% of the riders coming to Lower Manhattan, is like no other station in the city’s vast underground transit web—and that’s a good thing.

Building Team Awards | May 16, 2016

Upstate New York performing arts center revives once-toxic lakefront site

Early coordination, prefabrication, and judicious value engineering contributed to the accelerated completion of the Onondaga Lakeview Ampitheater, a Upstate New York design-build project.     

Building Team Awards | May 16, 2016

12 building projects that represent the best in AEC team collaboration

A busy, light-filled Manhattan subway station and a pebble-shaped Chicago library are among the winners of the 19th annual Building Team Awards. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021