flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Old Sears store will become one of the largest orthopaedics outpatient facilities in the Northeast

Projects

Old Sears store will become one of the largest orthopaedics outpatient facilities in the Northeast

University of Rochester Orthopaedics & Physical Performance Center scheduled to be completed in 2023.
 


By Peter Fabris, Contributing Editor | March 15, 2022
University of Rochester Orthopedics & Physical Performance Center exterior
The University of Rochester Orthopedics & Physical Performance Center is a former Sears.

A former Sears store in Rochester, N.Y., will be transformed into one of the largest orthopaedics outpatient facilities in the Northeast.
 
The new University of Rochester Orthopaedics & Physical Performance Center will arise in retail space at the Marketplace Mall in Henrietta, N.Y. The development reflects two trends: the surge in e-commerce resulting in more vacant retail spaces, and a growing demand for more robust healthcare infrastructure across the country. The project team includes Architect of record SLAM (The S/L/A/M Collaborative) and design architect Perkins & Will.

Orthopedic outpatient care
The outpatient clinical service building will consist of 140 exam rooms for orthopedic care.

"As healthcare facilities across the U.S. look to decentralize their services, the adaptive reuse of underutilized retail space represents a huge opportunity for institutions, like the University of Rochester Medical Center (URMC), to expand their outpatient reach by moving to the mall." said Scott Hansche, AIA, principal-in-charge at SLAM, in a news release.
 
The $227 million, 350,000 sf facility will include a 210,000 sf renovated space and a 140,000 sf new outpatient clinical services building that will house 140 exam rooms for orthopaedic care.
 
The design brings daylight into the existing Sears footprint through a series of skylights and an internal courtyard that also functions as rehabilitation space. The building’s sinuous facade design represents the idea of movement, echoing the orthopaedic care provided within its walls.
 
The new facility will address a growing need to expand infrastructure into underserved regions, helping to address healthcare equity gaps. One of the goals was to create a feeling of familiarity and accessibility for patients.

Expand Infrastructure
The new facility is meant to expand infrastructure in the area.


 “Repurposing a traditional community anchor, such as a mall, helps upend perceptions of healthcare facilities as centralized urban complexes,” said Robert Goodwin, FAIA, design director of Perkins & Will's New York studio. “We are integrating healthcare into the existing fabric of the community rather than asking patients to travel to a facility that might be hard to reach.” Accessibility was amplified through a series of decentralized entry points and the addition of a dedicated bus stop outside of the outpatient facility.
 
Repurposing an existing site meant that there was reduced need for permitting and no new roads were required. The renovated 200,000 sf section includes a surgical platform with three operating rooms, a three-room procedure suite, advanced imaging, clinical research, education, administration, physical therapy, and a human performance and injury prevention center.
 
The first phase, relocating the orthopaedic administrative offices to an adjacent renovated lease space, was completed and occupied in fall 2021. The second phase, the conversion of the former Sears store to an outpatient surgical center, will be complete by fall 2022. A third phase, construction of a rehab and sports performance center is expected to open next spring, and a four-story, 144-bed clinic space is scheduled for completion in fall 2023.

Admin offices phase 1
The project has three phases, and the first was already completed.

Owner and/or developer: Wilmorite
Design architect: Perkins & Will's New York studio
Architect of record: SLAM (The S/L/A/M Collaborative)
Local Associate Architect: Dwyer Architectural
MEP/IT Engineer : ME Engineering
Structural Engineer: Jensen BRV
General contractor/construction manager: Le Chase
Civil Engineer and Landscape Architect: Bergmann Associates
 

Related Stories

MFPRO+ News | Jul 22, 2024

6 multifamily WAFX 2024 Prize winners

Over 30 projects tackling global challenges such as climate change, public health, and social inequality have been named winners of the World Architecture Festival’s WAFX Awards.

Mass Timber | Jun 10, 2024

5 hidden benefits of mass timber design

Mass timber is a materials and design approach that holds immense potential to transform the future of the commercial building industry, as well as our environment. 

Urban Planning | May 28, 2024

‘Flowing’ design emphasizes interaction at Bellevue, Wash., development

The three-tower 1,030,000-sf office and retail development designed by Graphite Design Group in collaboration with Compton Design Office for Vulcan Real Estate is attracting some of the world’s largest names in tech and hospitality. 

Adaptive Reuse | Apr 29, 2024

6 characteristics of a successful adaptive reuse conversion

In the continuous battle against housing shortages and the surplus of vacant buildings, developers are turning their attention to the viability of adaptive reuse for their properties.

Sports and Recreational Facilities | Apr 2, 2024

How university rec centers are evolving to support wellbeing

In a LinkedIn Live, Recreation & Wellbeing’s Sadat Khan and Abby Diehl joined HOK architect Emily Ostertag to discuss the growing trend to design and program rec centers to support mental wellbeing and holistic health.

Affordable Housing | Jan 16, 2024

Construction kicks off on $237.9 million affordable housing project in Brooklyn, N.Y.

Construction recently began on an affordable housing project to create 328 units for low-income and formerly homeless populations in Brooklyn, N.Y.

Healthcare Facilities | Jan 7, 2024

Two new projects could be economic catalysts for a central New Jersey city

A Cancer Center and Innovation district are under construction and expected to start opening in 2025 in New Brunswick.

Biophilic Design | Oct 4, 2023

Transforming the entry experience with biophilic design

Vessel Architecture & Design's Cassandra Wallace, AIA, NCARB, explores how incorporating biophilic design elements and dynamic lighting can transform a seemingly cavernous entry space into a warm and inviting focal point.

Affordable Housing | Sep 25, 2023

3 affordable housing projects that serve as social catalysts

Trish Donnally, Associate Principal, Perkins Eastman, shares insights from three transformative affordable housing projects.

Adaptive Reuse | Sep 13, 2023

Houston's first innovation district is established using adaptive reuse

Gensler's Vince Flickinger shares the firm's adaptive reuse of a Houston, Texas, department store-turned innovation hub.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021