flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Novel construction approach speeds K-12 school projects

Great Solutions

Novel construction approach speeds K-12 school projects

The Folia system uses pre-engineered components to deliver school buildings at 20% less cost. 


By John Caulfield, Senior Editor | August 23, 2016

The two-story, 44,000-sf Central Middle School in San Carlos, Calif., is the first school to be constructed using Folia, a K-12 concept that leans on pre-engineering to provide greater design flexibility and customization, as well as quicker delivery (in under a year) and lower overall costs than traditional building methods. The concept is the brainchild of Quattrocchi Kwok Architects, Blach Construction, and structural engineer Gregory P. Luth and Associates. The firms have been refining the system for five years. Image: Tomasz Biernacki, Pechara Studio.

The San Carlos (Calif.) School District was in the midst of implementing its master plan when it awarded Quattrocchi Kwok Architects (QKA) and Blach Construction a $30 million contract to build a new 44,000-sf, two-story classroom building at Central Middle School, and remodel the existing building.

That project became the testing ground for Folia, an economical method for school construction that QKA, Blach, and structural engineer Gregory P. Luth and Associates had been working on since 2011. 

Building K-12 schools in California poses two problems: it takes forever and it costs a fortune. The San Carlos School District needed to accommodate a student population that’s projected to grow to nearly 4,000 students by 2020, from 3,400 today. Given the high cost of real estate in northern California’s Bay Area, the district chose to optimize its existing properties to address its capacity needs.

Folia, which derives from the Greek word meaning “nest,” provides an alternative to traditional steel-framed classroom construction. Unlike modular construction, the Folia system offers design flexibility for any campus or classroom configuration.

A key to Folia is customized pre-engineering within standardized parameters, says Steve Kwok, a AIA, Partner with QKA. For example, all braced frames are 10 feet wide. The width of the foundation is the same for all school models. Blach produces the building’s braced frames and 10x30-foot exterior steel wall panels in its shop and delivers them to the job site.

Kwok estimates that a Folia school costs about $400 per sf, compared to $500-plus for a traditionally built school. As important, the Building Team took 10 months to complete Central Middle School, which Kwok says is much faster than conventional building methods.

A Folia school is designed to exceed California’s Green Building Code and Energy Code standards. In June, The Division of the State Architect pre-checked a Folia two-story
L-shaped prototype with 12 classrooms. A DSA pre-check shaves months off the design and construction time.

 

Read about more innovations from BD+C's 2016 Great Solutions Report

Related Stories

Great Solutions | Oct 17, 2017

Loop NYC would reclaim 24 miles of park space from Manhattan’s street grid

A new proposal leverages driverless cars to free up almost all of Manhattan’s Park Avenue and Broadway for pedestrian paths.

Great Solutions | Sep 14, 2017

Hydraulic underground boardwalk and gangway system reunites the public with the coastline in Istanbul

The bespoke system is part of a master plan by Dror and Gensler that creates the world’s first underground cruise operation.

Great Solutions | Aug 14, 2017

Transmogrifying ‘E ink,’ energy-harvesting paint remove the ‘fiction’ from ‘science fiction’

These materials can turn an ordinary wall into dynamic real estate.

Great Solutions | Jul 12, 2017

The writing on the wall: Maker spaces encourage students to take an active role

Maker spaces, dry-erase walls, and flexible furniture highlight Kinkaid’s new Learning Center.

Great Solutions | Jun 6, 2017

Good vibrations: Portable tuned mass damper provides lightweight, cost-effective way to reduce structural vibrations

Developed by a team at Virginia Tech, the PTMD has been shown to reduce vibrations by as much as 75%.

Great Solutions | May 5, 2017

No nails necessary: Framing system comes together with steel zip ties and screws

Clemson University’s School of Architecture develops a patent-pending construction method that is gaining attention for its potential use in rapid, low-tech sustainable housing.

Great Solutions | Apr 6, 2017

Phone booths for the 21st century

Spotting a phone booth on a public street may not become any less rare, but they may soon become fixtures in the modern office.

Great Solutions | Mar 8, 2017

Pop-out balcony is a breath of fresh air for stuffy hotel rooms and apartments

In less than one minute, Bloomframe transforms from an insulated picture window to an open balcony.

Great Solutions | Feb 3, 2017

Drone-based hospitality concept looks to make nomads of us all

Driftscape could take the resort industry to places no hotel has ventured before.

AEC Tech | Sep 6, 2016

Innovation intervention: How AEC firms are driving growth through R&D programs

AEC firms are taking a page from the tech industry, by infusing a deep commitment to innovation and disruption into their cultural DNA.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021