flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New York's first-ever public housing for visually-impaired begins upgrade

New York's first-ever public housing for visually-impaired begins upgrade

Many of the residents have lived in the building since it opened in 1980.


By Magnusson Architecture and Planning | June 10, 2014
Magnusson Architecture and Planning (MAP) and Associated Blind Housing Development Fund Corporation (Associated Blind HDFC) broke ground on a $38 million building upgrade at Selis Manor. Selis Manor is the first government-funded residence for the vision-impaired and disabled in New York City. Associated Blind HDFC manages the residence, which opened in 1980. The repairs and capital improvements are its first-ever building upgrades. The phased construction is set to be complete by 2016.
 
The 14-story building is located at 135 West 23rd Street in Manhattan. It has 205 studio, one-, and two-bedroom units. Amenities include a roof terrace, courtyard, bowling alley, fitness center, computer center, library, and auditorium.
 
The speakers at the ceremony were Brian Daniels, associate commissioner of the New York State Office of Children and Family Services: Commission for the Blind; Leroy Latiker III, underwriter-project manager of production and development at U.S. Department of Housing and Urban Development; Tony Saverese, Developer/Managing Agent at Associated Blind HDFC; Joyce Carrico, tenant association representative and resident at Selis Manor; E. Perry Winston, associate at Magnusson Architecture and Planning; and Joe Malewich, board member of Associated Blind HDFC.
 
All of the public spaces will be upgraded and a new entrance will be added. Each of the apartments will have new fixtures and finishes. The separate kitchens will be connected directly to the living areas of the residential units for better flow and circulation. The renovation includes a full MEP systems upgrade that will lower energy usage.
 
“This long-awaited renovation will improve the safety and quality of housing for Selis Manor’s residents,” said Tony Savarese, Developer/Managing Agent at Associated Blind HDFC. “It is always a challenge to renovate an occupied building, and it is even more complicated when the occupants are visually-impaired. We worked closely with MAP on a plan that will ensure the safety of all residents during construction.”
 
Residents are supported by U.S. Department of Housing and Urban Development (HUD)’s Housing Choice Voucher Program, also known as Section 8. Associated Blind HDFC will arrange for temporary living spaces for every tenant on a rotating basis. The phased construction will take place two floors at a time.
 
 

Touchable models

Many of the residents have lived in the building since it opened. During the design phase of the project, MAP created touchable models of the new apartment layouts. The models acted as three-dimensional aides that helped the visually-impaired residents understand the changes by touch. Using the models as a guide, MAP’s architects engaged the residents in the process. They also incorporated the residents’ suggestions into the renovations.
 
 
“MAP has designed all types of housing, ranging from market-rate to affordable, and everything in between,” said Magnus Magnusson, AIA, LEED AP, founding principal of MAP. “So we know how to address the unique needs of particular residents. Selis Manor is over 30 years old, and long overdue for an upgrade. When the renovation is complete, all residents will have high-quality amenities and a superior standard of living – the kind of housing that all New Yorkers need and deserve.”
 
 

Fewer hurdles

MAP’s design eases crowding, increases security, and separates residents and visitors. Currently, the one entrance is shared by 250 residents and the patrons of VISIONS, a not-for-profit that provides services, including meals and classes, for over 500 people each day.  This traffic causes congestion in the common areas of the ground floor. A new residents-only entrance will be protected with an electronic pass system. The other entrance will be for VISIONS patrons.
 
Scored terrazzo flooring will help residents navigate within the building. A path along the floor will guide residents toward elevators and indicate stair landings. A new guardrail along the south façade of the building facing 23rd Street will include Braille inserts describing the history of the residence that lead toward the entrance. MAP consulted with Chris Downey, a San Francisco-based architect who became blind at the age of 45.
 
The architects expect NYSERDA Multi-family Participation Program (MPP) certification for the project. EME Group provided MEP engineering and Nash Associates provided structural engineering. Rockport Mortgage Corp. and Forsyth Street Advisors helped secure financing for the project.
 
 
 
 
 
 

Related Stories

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

Multifamily Housing | Apr 12, 2024

Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago

New 33-story Class A rental tower, designed by SCB, will offer 343 rental units. 

Student Housing | Apr 12, 2024

Construction begins on Auburn University’s new first-year residence hall

The new first-year residence hall along Auburn University's Haley Concourse.

K-12 Schools | Apr 11, 2024

Eric Dinges named CEO of PBK

Eric Dinges named CEO of PBK Architects, Houston.

Construction Costs | Apr 11, 2024

Construction materials prices increase 0.4% in March 2024

Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.

Healthcare Facilities | Apr 11, 2024

The just cause in behavioral health design: Make it right

NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.

K-12 Schools | Apr 10, 2024

A San Antonio school will provide early childhood education to a traditionally under-resourced region

In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.

University Buildings | Apr 10, 2024

Columbia University to begin construction on New York City’s first all-electric academic research building

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

K-12 Schools | Apr 10, 2024

Surprise, surprise: Students excel in modernized K-12 school buildings

Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction? 

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021