flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Mobile emergency room arrives just in time for Alabama hospital

Great Solutions

Mobile emergency room arrives just in time for Alabama hospital

The MED-1 Mobile Hospital Unit serves as a lower-cost solution during construction of new ED.


By John Caulfield, Senior Editor | August 23, 2016

While it’s been building a new 4,500-sf emergency department, Grove Hill (Ala.) Memorial Hospital has continued to offer emergency medical services via MED-1, a mobile hospital unit provided by Carolina HealthCare Systems. The seven-month installation is the longest a MED-1 has been deployed in the field and one of the first where its infrastructure—water, electricity, etc.—has been set up as if the mobile unit were a permanent structure. Photo: Brian Hale courtesy of Robins & Morton.

Grove Hill (Ala.) Memorial Hospital is adding a new $3.75 million, 4,500-sf emergency department that will house nine exam and treatment rooms, a two-bay trauma room, expanded waiting area, and direct access to operating rooms within the hospital.

During several months of construction that started last November, Grove Hill couldn’t shut down its existing ED because it’s the only one serving Clark County. And the hospital’s administration determined that converting unutilized space into a temporary ED would be too costly.

The project’s architect, Paul Fridl of Goodwyn, Mills and Cawood, suggested an economical alternative: a mobile ED. The hospital contacted Carolina HealthCare Systems, whose Carolinas MED-1 unit for more than a decade has provided temporary patient care after natural disasters or when a hospital’s infrastructure breaks down. 

MED-1 travels as two 53-foot tractor trailers. It is completely self-sustaining for the first 72 hours, using generators or local shore power. 

The mobile unit comprises a 1,000-sf patient care component that is equipped and staffed to manage minor to severe emergency medical conditions; six critical-care beds with built-in cardiac monitors; full trauma surgery and anesthesia capabilities; ED acute care beds; and a dental/EENT chair. Other medical equipment—like X-ray, ultrasound, I-stat laboratory, and IV pumps—are available.

Grove Hill would prove to be MED-1’s longest stint: more than seven months. This was also the first time the mobile unit would be set up as a “permanent temporary” ED, says Brian Hale, Senior Project Manager with Robins & Morton, the GC and construction manager on the project.

Robins & Morton built a lighted, fire-sprinkler-equipped vestibule, with fire and smoke detectors, to connect the mobile unit to the existing hospital. It hooked MED-1 up to the hospital’s water supply, and replaced the ramps.

This had never been done before in Alabama, and “there were no applicable codes,” says Hale. It required creative problem-solving to overcome issues like how to wire MED-1 to the local power grid.

 

Read about more innovations from BD+C's 2016 Great Solutions Report

Related Stories

Great Solutions | Aug 23, 2016

GBBN designers take on wellness research

In a new research paper, three healthcare specialists present factors that contribute to a psychological state that is receptive to healing.

Great Solutions | Aug 23, 2016

Visual energy model database demystifies net-zero design

Diamond Schmitt Architects’ ecoMetrics tool allows its designers to quickly analyze solutions based on models from 44 LEED-certified projects.

Great Solutions | Aug 23, 2016

Reusable infection control barriers ease hospital renovation

Clark Construction Group pilots the Edge Guard system on the Fair Oaks (Va.) Hospital reconstruction project.

Great Solutions | Aug 23, 2016

Novel construction approach speeds K-12 school projects

The Folia system uses pre-engineered components to deliver school buildings at 20% less cost. 

Great Solutions | Aug 23, 2016

Durable coffeemaker brings a bit of comfort to job sites

The CoffeeBoxx is lightweight rust proof, dust proof, water resistant, and ultra durable.

Great Solutions | Aug 23, 2016

Reclaimed wood paneling adds color to retail and hospitality projects

Colorburst panels are available in four stock options—Robin Egg Blue, Viridian Green, Haute Pink, and Cascade White—as well as custom colors.

Great Solutions | Aug 23, 2016

Biophilic pods beat the shade when it comes to outdoor cooling

The Xylem concept by CallisonRTKL regulates outdoor thermal comfort through shading, air movement, water circulation, and a vegetated roof.

Great Solutions | Aug 23, 2016

Mini-grant R&D program pays off in a big way for AE firm

Created through funding from Little’s LaceUp program, the Center for Building Performance has helped the design firm win 14 new jobs since its inception.

Great Solutions | Aug 23, 2016

At Beyer Blinder Belle everyone’s seeing RED

The firm’s R&D initiative inspires its designers to develop ideas that could positively disrupt the practice.

Great Solutions | Aug 23, 2016

Virtual care facility serves remote patients, may reduce readmissions

Mercy’s new high-tech medical center equips its medical professionals to deliver care at the bedside of patients anywhere.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021