flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Milwaukee Public Schools adopt innovative roof drainage system from Atlas to extend life of school buildings

Sponsored Content Roofing

Milwaukee Public Schools adopt innovative roof drainage system from Atlas to extend life of school buildings

Located throughout the city of Milwaukee and neighboring towns, MPS houses thousands of students.


By Atlas | April 12, 2017

When Dennis Fula took over responsibility for the Milwaukee Public School System’s (MPS) roof maintenance more than twenty years ago, many of the school buildings were threatened with closure due to unsafe conditions. Determined to ensure the city’s students had safe roofs over their heads, Dennis partnered with Dan Dalle Nogare and the team at Atlas Roofing Corporation to solve those safety concerns, reduce maintenance costs and extend the life of the historic school buildings.

Located throughout the city of Milwaukee and neighboring towns, MPS houses thousands of students. After years of wear and tear from the harsh Wisconsin winters, the buildings’ roofs were in terrible shape, with some in threat of condemnation. Previously, the maintenance department had used short-term fixes by adding material to leaky roofs, ultimately worsening problems throughout the entire building network. Dennis realized the school system needed a long-term solution to their roofing problems and was able to successfully recommend the implementation of the Atlas Certified Drainage Program (CDP™).

CDP is a comprehensive service for low slope tapered roofs designed to eliminate ponding water on a roof’s surface. The program’s designs help to prevent structural roof collapse, moisture invasion, membrane degradation, loss of thermal resistance, ice formation, vegetation growth and voiding system warranty. The Atlas CDP team worked on site with the MPS maintenance crew to map each roof in the school system and design custom drainage solutions specific to every individual building. While some building materials manufacturers will give a 25-year warranty, CDP ensures positive slope and drainage, which helps extend the life of the roof beyond a typical warranty. With proper maintenance and care, the MPS roofing system can last for 40 years.

 

 

By utilizing the Atlas Roofing Corporation’s Certified Drainage Program, the Milwaukee Public School System team saved on time and labor in addition to extending the life of each roof by at least 10–15 years, and in some cases more than 20. In fact, before implementing the CDP system, each school was only getting 20, 15 or as few as 10 years out of a roofing surface. Now the MPS team expects their roofs to last at least 30 years. According to the team, since implementing this system over 20 years ago, they still have yet to replace a roof with the new CDP system installed.

While maintenance is still required, the number of repairs needed is reduced each year. Before utilizing the CDP, the MPS team would find 200–400 leaks to inspect after rain and now, they are dealing with an average of only 20–30 leaks per building, of which only a fraction are leaks caused by the roof. The MPS team is incredibly proud of the program’s success and of the unprecedented support from Atlas Roofing Corporation. According to the MPS team, “You’d hardly know these roofs are 20 years old… they look good as new.”

To read the full case study, please visit http://www.atlasrwi.com/casestudies/mps/

Tags

Related Stories

Roofing | Jul 17, 2017

EclipseEdge eases installation of raised roof edges, gravel stops, and full coping caps

The EclipseEdge edge metal profile uses a two-part design with a base and a top cover to eliminate steps often required in traditional installations. 

Sponsored | Roofing | Jun 29, 2017

Metal roofs are soaring in popularity in the residential market

The Metal Roofing Alliance estimates that 750,000 metal roofs were installed on U.S. homes in 2015.

Sponsored | Roofing | May 24, 2017

Duro-Last Duro-Bond Roofing System installed on New England warehouse

Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.

Roofing | Mar 29, 2017

Product roundup: 12 cutting-edge roofing solutions

Dynatsy Shingles from IKO, CR G cap sheets from Johns Manville, and GenFlex EPDM Adhesive from GenFlex Roofing Systems are three of the 12 products in BD+C's March Product Roundup.

Sponsored | Roofing | Mar 21, 2017

Duro-Last provides solution for Kentucky elementary school's leaky roof

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. 

Roofing | Feb 8, 2017

Energy code requirements for commercial low-slope roof assemblies [AIA course]

This course highlights commonly adopted energy-code provisions for commercial low-slope roof assembles and examines the process of how such provisions are adopted.

Sponsored | Roofing | Nov 7, 2016

Pioneering Urban Loft Space in Atlanta

To abide by the historical and city guidelines, Larimer/Shannon Group selected a fully adhered UltraPly™ TPO Roofing System from Firestone Building Products with polyiso insulation, high-density cover boards and an UltraPly TPO Walkway Pad.

Shopping Centers | Nov 4, 2016

Expansion of Chadstone Shopping Centre features 7,000 square meter glass roof

2,700 unique glass panels make up the first roof of its kind in Australia.

Sponsored | Roofing | Oct 24, 2016

Metal roofing panels reinvigorate town staple

Designers for the project initially thought patching and repairs would be sufficient for the 35-year-old, 17,000 square foot roof, however upon further inspection it was determined that the building needed a new roof.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021