flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Life-size Noah’s Ark uses 3.1 million board feet of timber

Religious Facilities

Life-size Noah’s Ark uses 3.1 million board feet of timber

Ark Encounter, the largest timber-framed structure in the world, opened in Kentucky.


By Mike Chamernik, Associate Editor | July 12, 2016

Ark Encounter. Photo and video courtesy Ark Encounter.

A new to-scale replica of Noah's Ark will not need to survive another Great Flood. It is big enough, though, to probably hold two of every animal.

Ark Encounter, a historical museum dedicated to the legendary Bible story, was built to the size specified in scripture: 510 feet long, 86 feet wide, and 94 feet high. It is be the largest timber-framed structure in the world, according to its designers and developers. The Ark, which opened last week in Williamstown, Ky., can hold up to 10,000 people (the plan is to limit the capacity to 3,000, though), and a 1,600-seat restaurant is being set up on the top deck.

The project cost $100 million and took a little more than one year to build. The timber frame construction designed and supplied by Colorado Timberframe. The Ark required 3.1 million board feet of timber, and more than 1.2 million board feet of square timbers were needed for the frame itself.

As much reclaimed timber was used as possible, including a few of the 50-foot Engelmann spruce logs at the Ark’s center. 

“Wood is such a versatile product,” Keenan Tompkins, owner of Colorado Timberframe, said in a statement. “If you look back through history, there are plenty of examples of extremely large structures, some of which are even still standing today. So it’s kind of going back to incorporating and using that, but applying it in a modern context and having it meet the modern engineering standards that we have today.”

Construction crews included 10 workers on site in Williamstown, 25 builders in a workshop in Denver, and 75 Amish craftsmen employed by the project’s contractor.

The Troyer Group was the project’s architect, and Accoya wood was used for the exterior cladding. 

The Ark is expecting more than one million visitors during its first year.

 

Ark Encounter during construction. Click to enlarge.

Related Stories

| Jul 18, 2014

Engineering firms look to bolster growth through new services, technology [2014 Giants 300 Report]

Following solid revenue growth in 2013, the majority of U.S.-based engineering and engineering/architecture firms expect more of the same this year, according to BD+C’s 2014 Giants 300 report. 

| Jul 18, 2014

Top Engineering/Architecture Firms [2014 Giants 300 Report]

Jacobs, AECOM, Parsons Brinckerhoff top Building Design+Construction's 2014 ranking of the largest engineering/architecture firms in the United States.

| Jul 18, 2014

Top Engineering Firms [2014 Giants 300 Report]

Fluor, Arup, Day & Zimmermann top Building Design+Construction's 2014 ranking of the largest engineering firms in the United States.

| Jul 18, 2014

Top Architecture Firms [2014 Giants 300 Report]

Gensler, Perkins+Will, NBBJ top Building Design+Construction's 2014 ranking of the largest architecture firms in the United States. 

| Jul 18, 2014

2014 Giants 300 Report

Building Design+Construction magazine's annual ranking the nation's largest architecture, engineering, and construction firms in the U.S.

| Jul 7, 2014

7 emerging design trends in brick buildings

From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick. 

| Jul 2, 2014

Emerging trends in commercial flooring

Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.

| Jun 23, 2014

Berlin House of One will accommodate Muslims, Jews, and Christians

The building will rise on the ruins of a 13th-century Christian church that was damaged during WWII and eventually demolished.

| Jun 18, 2014

Arup uses 3D printing to fabricate one-of-a-kind structural steel components

The firm's research shows that 3D printing has the potential to reduce costs, cut waste, and slash the carbon footprint of the construction sector.

| Jun 17, 2014

Nation's largest Thai Buddhist temple opens near Boston

The $60 million facility built in honor of King Rama IX of Thailand is the largest Thai Buddhist temple outside of Thailand.

boombox1 - default
boombox2 -
native1 -

More In Category

Giants 400

Top 40 Religious Facility Construction Firms for 2023

Crossland Construction, Haskell, Big-D Construction, Whiting-Turner, and JE Dunn Construction top BD+C's ranking of the nation's largest religious facility general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report.




Giants 400

Top 115 Architecture Engineering Firms for 2023

Stantec, HDR, Page, HOK, and Arcadis North America top the rankings of the nation's largest architecture engineering (AE) firms for nonresidential building and multifamily housing work, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021