Plans are under way for what’s being described as both the largest planned logistics and business park and the largest net zero logistics development in North America. Located in Moreno Valley, Calif., the $25 billion World Logistics Center aims to boost the supply chain capabilities of Southern California.
The facility, which will be constructed over seven years, will serve as a distribution center for destinations across the continent. The development also will include walkable streets, cafes, restaurants, spaces for arts and culture, breweries, and public space.
Owned by real estate developer Highland Fairview, with Stantec as the prime consultant, the World Logistics Center will contain over 40 million sf of facilities across 2,600 acres. The facility will make use of intelligent technologies to increase shipping efficiency, improve use of transportation resources, and reduce carbon emissions. Housing multiple national brands and logistics providers, the center will be able to deliver overnight to 11 Western states and within three days to any destination in the continental U.S.
RELATED: BD+C's 2022 Industrial Sector Giants Rankings:
• Top 95 Industrial Facility Architecture and AE Firms
• Top 90 Industrial Facility Engineering and EA Firms
• Top 110 Industrial Facility Contractors and CM Firms
The net zero development will have over 40 million sf of rooftop space for solar integration. It will leverage both autonomous vehicle (AV) and electric vehicle (EV) technologies, including 1,080 EV charging stations. The developer has been in discussions to acquire zero-emission semi-trucks and possibly AV shuttles for travel within the development. With onsite battery storage and microgrids, the facility is expected not to rely on the external power grid. The center also will prioritize water conservation, with an anticipated savings of 653 million of gallons of water each year.
Stantec’s project team, which will include 300 professionals, will provide civil engineering, industrial buildings architecture, geomatics, water and wastewater design, landscape architecture, urban planning, smart mobility and AV consulting, funding consulting, and energy and innovation design.
Project design is currently under way, with construction slated to start this year and to conclude in 2030.
Related Stories
Codes and Standards | Sep 3, 2024
Atlanta aims to crack down on blighted properties with new tax
A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.
Industrial Facilities | Aug 28, 2024
UK-based tire company plans to build the first carbon-neutral tire factory in the U.S.
ENSO, a U.K.-based company that makes tires for electric vehicles, has announced plans to build the first carbon-neutral tire factory in the U.S. The $500 million ENSO technology campus will be powered entirely by renewable energy. The first-of-its-kind tire factory aims to be carbon neutral without purchased offsets, using carbon-neutral raw materials and building materials.
Industrial Facilities | Jul 24, 2024
Industrial construction slows, but demand remains strong
California and Arizona remain the most sought-after markets for development and operations, says CommercialEdge’s latest report.
Great Solutions | Jul 23, 2024
41 Great Solutions for architects, engineers, and contractors
AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.
Industrial Facilities | Jun 8, 2024
8 ways to cool a factory
Whichever way you look at it—from a workplace wellness point of view or from a competing for talent angle—there are good reasons to explore options for climate control in the factory workplace.
Building Tech | May 21, 2024
In a world first, load-bearing concrete walls built with a 3D printer
A Germany-based construction engineering company says it has constructed the world’s first load-bearing concrete walls built with a 3D printer. Züblin built a new warehouse from a single 3D print for Strabag Baumaschinentechnik International in Stuttgart, Germany using a Putzmeister 3D printer.
Industrial Facilities | May 9, 2024
Another new industrial facility breaks ground in hottest market for this sector
The Brickyards on Ellsworth in Mesa, Ariz., will eventually have eight buildings.
Laboratories | Apr 12, 2024
Life science construction completions will peak this year, then drop off substantially
There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.
Industrial Facilities | Apr 9, 2024
Confessions of a cold storage architect
Designing energy-efficient cold storage facilities that keep food safe and look beautiful takes special knowledge.
Data Centers | Feb 28, 2024
What’s next for data center design in 2024
Nuclear power, direct-to-chip liquid cooling, and data centers as learning destinations are among the emerging design trends in the data center sector, according to Scott Hays, Sector Leader, Sustainable Design, with HED.