KLMK Group Inc. has been awarded the Project Management contract for the Emergency Department and Cardiology Expansion Project at Slidell Memorial Hospital in Slidell, La.
Slidell Memorial, an 182-bed acute care community hospital, is expanding their current facility. The renovation will include a 56,000-sf Emergency Room/Cardiology Expansion.
The new facility will allow for shorter wait times, faster assessments, quicker discharges and more inpatient private beds. In addition, it will allow Slidell to prepare for future community growth while adding new technologies, equipment and physicians.
“After issuing a Request for Proposal (RFP) and an extensive national search, KLMK Group provided the most comprehensive strategy and healthcare experience to assist in managing the construction of our expansion. We are confident that the expertise that KLMK brings to the project will ensure that Slidell Memorial achieves our goal of improving the quality of life in our community,” says Barry Winters, Director Materials Management at Slidell Memorial Hospital.
KLMK has been retained to provide program management services, from the design and preconstruction phase through transition, related to the renovation of the existing facility. “We value our relationship with Slidell Memorial and are excited about the opportunity to assist their team in expanding the services they deliver to the surrounding community,” stated Bill McMahon, KLMK President and COO.
Construction on the new facility is scheduled to begin in March 2012 and be completed by June 2013. BD+C
Related Stories
| Nov 18, 2014
5 big trends changing the world of academic medicine
Things are changing in healthcare. Within academic medicine alone, there is a global shortage of healthcare professionals, a changing policy landscape within the U..S., and new view and techniques in both pedagogy and practice, writes Perkins+Will’s Pat Bosch.
| Nov 14, 2014
Haskell acquires FreemanWhite, strengthens healthcare design-build business
The combination expands Haskell’s geographic presence by adding FreemanWhite’s offices in Chicago, Charlotte, Nashville, and San Diego. FreemanWhite will retain its name and brand.
| Oct 30, 2014
CannonDesign releases guide for specifying flooring in healthcare settings
The new report, "Flooring Applications in Healthcare Settings," compares and contrasts different flooring types in the context of parameters such as health and safety impact, design and operational issues, environmental considerations, economics, and product options.
| Oct 30, 2014
Perkins Eastman and Lee, Burkhart, Liu to merge practices
The merger will significantly build upon the established practices—particularly healthcare—of both firms and diversify their combined expertise, particularly on the West Coast.
| Oct 21, 2014
Passive House concept gains momentum in apartment design
Passive House, an ultra-efficient building standard that originated in Germany, has been used for single-family homes since its inception in 1990. Only recently has the concept made its way into the U.S. commercial buildings market.
| Oct 21, 2014
Hartford Hospital plans $150 million expansion for Bone and Joint Institute
The bright-white structures will feature a curvilinear form, mimicking bones and ligament.
| Oct 13, 2014
Debunking the 5 myths of health data and sustainable design
The path to more extensive use of health data in green building is blocked by certain myths that have to be debunked before such data can be successfully incorporated into the project delivery process.
| Oct 8, 2014
Massive ‘healthcare village’ in Nevada touted as world’s largest healthcare project
The $1.2 billion Union Village project is expected to create 12,000 permanent jobs when completed by 2024.
| Sep 29, 2014
10 common deficiencies in aging healthcare facilities
VOA's Douglas King pinpoints the top issues that arise during healthcare facilities assessments, including missing fire/smoke dampers, out-of-place fire alarms, and poorly constructed doorways.
| Sep 23, 2014
Cedars-Sinai looks to streamline trauma care with first-of-its-kind OR360 simulation space
The breakthrough simulation center features moveable walls and a modular ceiling grid that allow doctors and military personnel to easily reconfigure the shape and size of the space.