flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Kawneer dedicates new floodwall at its Bloomsburg facility

Kawneer dedicates new floodwall at its Bloomsburg facility

Funded by Pennsylvania H2O Grant and Alcoa, New Wall Will Protect Facility and Surrounding Area from Future Damage, Saving Resources and Offering Stability


By Kawneer | March 27, 2013

Kawneer Company, Inc., an Alcoa business and the leading manufacturer of architectural aluminum products and systems for commercial construction, dedicated a new floodwall at their Bloomsburg, Pennsylvania facility, heralding greater levels of safety and stability for employees and customers.

The floodwall, designed to protect the facility and surrounding area from potential storm damage, was funded through a partnership between the town of Bloomsburg, the Commonwealth of Pennsylvania Department of Community & Economic Development, local and state government and Alcoa. More than 280 guests, including Pennsylvania State Senator John Gordner, Pennsylvania State Representative Dave Millard, Bloomsburg Mayor Dan Knorr, Columbia County Commissioners, local business owners and Kawneer customers and employees, attended the dedication ceremony.

“Bloomsburg is an invaluable flagship location for Kawneer North America. One in every three doors you walk through in the U.S. are Kawneer doors, and, more often than not, those doors were manufactured here in Bloomsburg,” said Diana Perreiah, President, Kawneer North America and Vice President, Alcoa Building and Construction Systems, “This floodwall is the result of strong community partnerships and mutual investment. Thank you to all parties involved for helping us provide our employees a safer, more stable place to work and ensuring our customers continue to receive the Kawneer products and services they depend on.”

In September 2011, Tropical Storm Lee brought heavy rainfall and historic flooding to Pennsylvania, resulting in extensive damage to the Bloomsburg community and Kawneer’s Bloomsburg facility, which employs approximately 395 people. Kawneer and Alcoa immediately responded, developing a recovery plan and offering financial support to the community through the Alcoa Foundation. Employees worked diligently to address the challenges presented by the flood, assessing options and instituting processes to address order fulfillment while actively participating in rebuilding their community.

“It took a lot of hard work, resources and time to make this floodwall and recovery happen. I would be remiss if I didn’t thank our Bloomsburg employees and our loyal customers for their patience, diligence and commitment to one another, our company and to the Bloomsburg community which helped us build a safer and more stable facility,” said Glen Morrison, President, Alcoa Building and Construction Systems.

To learn more about Kawneer, please visit www.kawneer.com.

About Kawneer
With more than 100 years of innovation and experience, Kawneer North America is headquartered in Norcross, GA, and is the leading manufacturer of architectural aluminum products and systems for the commercial construction industry. Kawneer is a part of Alcoa’s global Building and Construction Systems (BCS) business unit. In 2010 Traco, a leading manufacturer of windows for more than 65 years, joined Alcoa BCS as a division of Kawneer. Alcoa BCS manufactures and markets architectural systems and products in North America, Europe and Asia. Alcoa is the world’s leading producer of primary and fabricated aluminum as well as the world’s largest miner of bauxite and refiner of alumina, and has been active in all major aspects of the industry for the past 125 years. For more information on Kawneer or its products, please visit www.kawneer.com.

Related Stories

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Feb 1, 2012

Replacement windows eliminate weak link in the building envelope

Replacement or retrofit can help keep energy costs from going out the window.

| Jan 31, 2012

28th Annual Reconstruction Awards: Modern day reconstruction plays out

A savvy Building Team reconstructs a Boston landmark into a multiuse masterpiece for Suffolk University. 

| Jan 3, 2012

New Chicago hospital prepared for pandemic, CBR terror threat

At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters. 

| Jan 3, 2012

BIM: not just for new buildings

Ohio State University Medical Center is converting 55 Medical Center buildings from AutoCAD to BIM to improve quality and speed of decision making related to facility use, renovations, maintenance, and more. 

| Jan 3, 2012

New SJI Rule on Steel Joists

A new rule from the Steel Joist Institute clarifies when local reinforcement of joists is required for chord loads away from panel points. SJI members offer guidance about how and when to specify loads.

| Jan 3, 2012

Rental Renaissance, The Rebirth of the Apartment Market

Across much of the U.S., apartment rents are rising, vacancy rates are falling. In just about every major urban area, new multifamily rental projects and major renovations are coming online. It may be too soon to pronounce the rental market fully recovered, but the trend is promising.

| Dec 20, 2011

BCA’s Best Practices in New Construction available online

This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.

| Dec 16, 2011

Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University

The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration. 

| Dec 10, 2011

Energy performance starts at the building envelope

Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.

boombox1 - default
boombox2 -
native1 -

More In Category

Codes and Standards

Updated document details methods of testing fenestration for exterior walls

The Fenestration and Glazing Industry Alliance (FGIA) updated a document serving a recommended practice for determining test methodology for laboratory and field testing of exterior wall systems. The document pertains to products covered by an AAMA standard such as curtain walls, storefronts, window walls, and sloped glazing. AAMA 501-24, Methods of Test for Exterior Walls was last updated in 2015. 




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021