flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Kawneer curtain walls create the perfect learning environment

Sponsored Content

Kawneer curtain walls create the perfect learning environment


By Kawneer | May 23, 2022
Versoleil SunShade - Outrigger System - for Curtain Wall

With an ever-growing student body, Fayetteville High School in Arkansas decided to expand its capacity while creating a new, improved environment using Kawneer curtain walls to help students fulfill their potential. Three renowned architectural firms came together to design and build an impressive 530,000-square-foot campus capable of housing 3,000 students. It comprises two massive building blocks with a new arena, performing arts center, auditorium, music and athletic spaces, student commons, food service and administrative offices.
Despite being able to accommodate a large student population, the school was planned around the principle of multiple, independent small learning communities (SLCs) with 700 students. Each community has access to various rooms such as flexible multimedia labs, woodworking shops, robotics labs and bleacher-like grand staircases that transform into mini-auditoriums or leisure areas.
Fayetteville High School benefits from an abundance of daylight and delivers innovative learning areas that compel the next generation to envision solutions for today’s and tomorrow’s challenges.


Design highlights

The new school was built upon the foundations of the original building as a tribute to the institution's heritage and to retain its desirable location. The facility also managed to create a new connection to the local landscape by creating a natural link between the building and the outside area. 


Kawneer provides reliability with versatile features

The school’s interior is illuminated by 28,000-square-feet of curtain wall and 14,000-square-feet of storefront glass, delivering an unobstructed, breezy design that provides a healthy environment for students and teachers.
Kawneer’s 1600 Wall System®1 Curtain Wall was installed with four rows of Versoleil® SunShade and Trifab® VersaGlaze® 451T Stick Framing System. 

Curtain Wall

The main entrance was repositioned to create a more inviting, visible entry into the high school, and the open floor plan allows more daylight to come inside, creating a brighter and more inspirational atmosphere throughout the renovated building. Another prominent design feature is the large southward-facing windows overlooking a landscaped student commons area, which create a collegiate campus feel reflective of the school’s ties to the University of Arkansas. Other sustainable features - including the use of recycled building materials and energy-efficient environmental-control systems - contributed to LEED Gold® certification of the building.

350 Medium and 500 Wild Stile Standard Entrances

The architects strategically installed skylights and vertical windows within the deep floor plates, flooding the windowless internal areas with daylight. 


The challenge

The architects faced many challenges throughout the building’s construction. The whole project took four years to be completed and was done while the school was operating. Additionally, the project involved construction, demolitions and renovations, demanding several building techniques and machinery used in many structures around the campus.


The solution

The modernization was completed in a phased approach to minimize disruptions to the school's routine. Most demolitions were carried out during the summer break to keep teachers and students safe. 
Despite being seamlessly integrated with the surroundings, the new school has a distinctive identity that is welcoming and modern at the same time. 

Find out more at Kawneer.com.

 

PROJECT INFORMATION:
Building
: Fayetteville High School
Location: Arkansas
Architects:
Hight Jackson Associates, Rogers, AR
Marlon Blackwell Architects, Fayetteville, AR
DLR Group, Overland Park, KS
General Contractor: Nabholz Construction Corp., Rogers, AR
Glazing Contractor: ACE Glass Construction, Little Rock, AR


PRODUCTS USED:

  • 1600 Wall System®1 Curtain Wall
  • 350 Medium Stile Standard Entrance
  • Trifab® VersaGlaze® 451T Stick Framing System
  • Trifab® VersaGlaze® 451T SS Framing System
  • 1010 Sliding Mall Front
  • Versoleil® SunShade - Outrigger System - for Curtain Wall 

Related Stories

Building Materials | Aug 3, 2022

Shawmut CEO Les Hiscoe on coping with a shaky supply chain in construction

BD+C's John Caulfield interviews Les Hiscoe, CEO of Shawmut Design and Construction, about how his firm keeps projects on schedule and budget in the face of shortages, delays, and price volatility.

Sponsored | | Jun 16, 2022

Five Reasons to Choose an Insulated Composite Backup Wall System

Insulated composite backup panel systems deliver design flexibility without jeopardizing the building envelope with mixing of cladding options.

Sponsored | BD+C University Course | May 10, 2022

Design guide for parapets: Safety, continuity, and the building code

This course covers design considerations for parapets. The modern parapet must provide fire protection, serve as a fall-protective guard, transition and protect the roof/facade interface, conceal rooftop equipment, and contribute to the aesthetic character of the building. 

Sponsored | BD+C University Course | May 5, 2022

Designing with architectural insulated metal wall panels

Insulated metal wall panels (IMPs) offer a sleek, modern, and lightweight envelope system that is highly customizable. This continuing education course explores the characteristics of insulated metal wall panels, including how they can offer a six-in-one design solution. Discussions also include design options, installation processes, code compliance, sustainability, and available warranties.

Walls and Partitions | Nov 29, 2021

ProWood FR Announces Availability of New Fire-Retardant, UL-Listed Wall Assembly

ProWood FR, a brand of UFP Retail Solutions, recently achieved UL Listing on a fire-retardant, pressure-treated wall assembly, ProWood FR UL V343 2-Hour Wall Assembly (UL 263 Listed).

75 Top Building Products | Dec 16, 2019

101 Top Products for 2019

Building Design+Construction readers and editors select their top building products for the past 12 months in the fourth-annual 101 Top Products report.

75 Top Building Products | Dec 16, 2019

Top Interior Building Products for 2019

Arktura's Delta Drop ceiling and CertainTeed's Decoustics Rondolo wood panels are among the 13 new interior products to make Building Design+Construction's 2019 101 Top Products report. 

Design Innovation Report | Jun 25, 2019

2019 Design Innovation Report: Super labs, dream cabins, office boardwalks, façades as art

9 projects that push the limits of architectural design, space planning, and material innovation.

Walls and Partitions | Jun 6, 2019

NanaWall Systems debuts AcoustiFOLD at the AIA Conference

The product is making its AIA debut at the trade show.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021