The JW Marriott Indianapolis redefined the city’s skyline. With more than 1,000 rooms, the 34-story JW Marriott is both the largest and tallest hotel in Indianapolis. One of the most prestigious hotels in the city, the JW Marriott has hosted celebrities and NFL teams alike.
For the complicated construction of this new hotel, JW Marriott chose to install Viega ProPress systems for domestic water and hot water heating applications on all copper piping systems sizes 2" and down.
Circle Design engineering group worked on the design portion of the building. Alexander Veksler, currently with AVEKS Engineering, Inc. in Indianapolis, engineered the JW Marriott project.
“I was very pleased,” Veksler said. “Overall, the system gives the opportunity to do a lot of things in a faster, more reliable way. You save money and labor. You save on welding. In some places where welding is not desirable, pressing really has the presence. That’s what we like about it.”
Veksler was originally introduced to Viega products through a local sales representative seven years ago. He indicated that the system held together well, even during testing that incorporated several tests at high pressures.
Viega ProPress systems, the original copper press fitting, available in sizes ½" to 4"
The complexity of the plumbing design and the timeframe for the project both presented challenges to the contractor, North Mechanical Contracting but Viega ProPress offered the benefits needed to overcome those challenges.
With nearly 400 different fitting configurations ranging from ½" to 4", Viega ProPress copper fittings can be designed into nearly any project. As the first manufacturer to offer press fitting systems, Viega has a tried and tested history of excellence around the world. Viega ProPress has been revolutionizing the way America joins pipe since 1999. And with more approved applications than any other press fitting system in the industry, whether heating, potable water, natural gas, propane, fire protection or solar, Viega ProPress is the smartest choice for any commercial, institutional or industrial project.
Only Viega offers the patented Viega Smart Connect feature. The Viega Smart Connect feature is the only guaranteed method in the industry to identify unpressed connections, which means you can trust that an installation is secure. The versatile alternative to conventional pipe joining methods, reliable Viega ProPress is backed by an industry-leading warranty.
Veksler knows of other future projects where Viega ProPress has been included in the specs.
With the reliability of flameless Viega ProPress, projects stay on schedule. Secure, consistent connections keep installations moving and provide genuine peace of mind.
“It’s a reliable product,” Veksler said. “We like the development of the product through the years. We like that Viega is coming out with new products. We are looking forward to using it in the future.”
Viega
1.800.976.9819
insidesales@viega.us
www.viega.us
Related Stories
| Jan 3, 2012
AIA's ABI November Index reaches 52.0
The Architecture Billings Index (ABI) reached its first positive mark since August.
| Jan 3, 2012
Callison acquires Barteluce Architects & Associates
This acquisition will grow Callison’s New York team to over 75 architects.
| Jan 3, 2012
VDK Architects merges with Harley Ellis Devereaux
Harley Ellis Devereaux will relocate the employees in its current Berkeley, Calif., office to the new Oakland office location effective January 3, 2012.
| Jan 3, 2012
Weingarten, Callan appointed to BD+C Editorial Board
Building Design+Construction has named two new members to its editorial board. Both are past recipients of BD+C’s “40 Under 40” honor.
| Jan 3, 2012
New Chicago hospital prepared for pandemic, CBR terror threat
At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters.
| Jan 3, 2012
BIM: not just for new buildings
Ohio State University Medical Center is converting 55 Medical Center buildings from AutoCAD to BIM to improve quality and speed of decision making related to facility use, renovations, maintenance, and more.
| Jan 3, 2012
New SJI Rule on Steel Joists
A new rule from the Steel Joist Institute clarifies when local reinforcement of joists is required for chord loads away from panel points. SJI members offer guidance about how and when to specify loads.
| Jan 3, 2012
AIA Course: New Developments in Concrete Construction
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Jan 3, 2012
The Value of Historic Paint Investigations
An expert conservator provides a three-step approach to determining a historic building’s “period of significance”—and how to restore its painted surfaces to the correct patterns and colors.
| Jan 3, 2012
28th Annual Reconstruction Awards: Bringing Hope to Cancer Patients
A gothic-style structure is reconstructed into comfortable, modern patient residence facility for the American Cancer Society.