Ultimate underlayment

Aug. 11, 2010

Floor underlayment can be poured up to 60 days before the building's permanent windows and doors are installed. Designed for use in buildings with light-gauge steel frame construction, Levelrock CSD Early Exposure can be applied over corrugated steel decks, giving Building Teams an economical means of designing mid-rise buildings up to 10 stories high. The hybrid cementitious underlayment features compressive strengths from 3,500 to 5,000 psi and can withstand the rigors of trade traffic.

USG Corp.

Input No. 206 at BDCnetwork.com/quickResponse

Sign up for Building Design+Construction Newsletters