Formwork Solutions: The Loop at Mattapan Station

Sponsored Content

Formwork Solutions: The Loop at Mattapan Station

Safety and Efficiency Increase Site Productivity


By PERI Formwork Systems, Inc. | March 12, 2022
Crew Walk Across SKYDECK Slab Formwork at Mattapan Station

PERI SKYDECK aluminum panels allowed crews to install shoring and strip it for post-tension slabs quickly and safely.

PERI Drives Efficiency for Construction of New City Residences

The Loop at Mattapan Station in Boston, Massachusetts, is a mixed-use redevelopment project adjacent to the Mattapan MBTA Red Line Station. The $57-milion project includes a new building with 135 residential units, 10,000 square feet of commercial retail space, and 50 new surface parking spots. The development also includes a second building comprised of nine homeownership units. 

The transit-oriented property will provide affordable and market-rate housing, a variety of transportation options, and direct access to the Neponset River Greenway in the Mattapan community. Residents of the complex will have access to a wider variety of transportation options and recreational opportunities. 

The start of construction for the building was delayed due to impacts of the COVID-19 pandemic, and crews needed a high-production slab formwork system backed by engineering and logistics support to make up for lost time when construction began in the spring of 2021.

 

Safe & Efficient

Marguerite Concrete had experience with PERI Formwork Solutions and knew that PERI delivered greater efficiency, ease of use, and increased safety on a work site.  

The project team originally intended to use plywood decking and wood beams but switched to PERI’s SKYDECK aluminum panels – a faster and lighter product – to allow them to quickly and safely install shoring and strip it for post-tension slabs. 

“There wasn’t much of a learning curve when we transitioned from the traditional truss and plywood system to the PERI SKYDECK system,” said Jason Gouveia, superintendent with Marguerite Concrete. “The carpenters found it much easier and a lighter system to use. Production was increased exponentially.”

Crews selected PERI’s SKYDECK slab formwork system with dropheads for the first level structural slab and the second level post-tension slab. Workers cycled the panels and beams of the 20,000 square feet of SKYDECK to the subsequent pours while props, dropheads, and cover strips remained in place as reshores. 

PERI SKYDECK slab formwork accelerates working operations with systematic assembly and lightweight components. The small prop requirements ensure freedom of movement under the slab formwork and simplify the horizontal transportation of materials. SKYDECK features early striking with the drophead system, reducing on-site material requirements.

In combination with SKYDECK, MULTIFLEX was used around thicker areas and columns so less equipment would be needed, delivering a safer and more cost-competitive solution for those tight sections. 

PERI SKYDECK, MULTIFLEX, and PD5 formed the Mattapan Station
In combination with SKYDECK, PERI MULTIFLEX was used around thicker areas and columns, delivering a safer and more cost-competitive solution for tight sections.

PERI’s MULTIFLEX main and cross beams and their position and spacing can be freely selected, providing the maximum flexibility. The MULTIFLEX system is an ideal solution for complicated ground plans and forming operations in confined spaces. It can be used in conjunction with other systems to deliver optimal solutions for the unique details of every project. 

For the connecting overpass, the crew used 5,000 square feet of PD 5 shoring to support heights up to 20 feet. PD 5 allowed crews to set up taller shoring areas by hand with a lightweight system. 

Crew Install SKYDECK Slab Formwork at Mattapan Station
PERI PD 5 allowed crews to quickly set up taller shoring areas by hand with a lightweight system that features simple, safe handling and a sophisticated frame design.

PERI PD 5 shoring system assembles quickly and features simple, safe handling because of low component weight and sophisticated frame design. PD 5 is cost-effective and simple, making it suitable for slab formwork and beams across all segments.

The project is expected to be complete in Spring 2022. 

 

Contact:

PERI logo

PERI Formwork Systems, Inc. 
410.712.7225
formwork@peri-usa.com
http://www.peri-usa.com/

boombox1 - default
boombox2 -
native1 -
halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021