flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

First-of-its-kind Starbucks built in just six days

Sustainability

First-of-its-kind Starbucks built in just six days

The store is set to open in Canada in mid-March.


By David Malone, Associate Editor | March 9, 2021
Starbucks exterior building design rendering

Renderings courtesy Starbucks

A new Starbucks store is set to open in Abbotsford, B.C., that was assembled in six days with near-zero construction waste. The store was designed to reduce the energy needs for heating and cooling compared to standard construction builds.

Nexii Building Solutions, a Vancouver-based green building company, designed, manufactured, and constructed the location, which includes in-store and drive-thru options. The panels for the store’s roof and walls were designed and manufactured offsite and then assembled on-site. Nexii panels create a thermally efficient, airtight envelope, meaning the Starbucks building will require less energy to heat and cool, greatly improving energy efficiency over its building lifecycle, and lowering operating costs.

The project is meant to represent a step forward in Starbucks’ aspirations to operate more efficient stores.

 

Starbucks sustainable building graphic

Related Stories

| Jul 2, 2012

Plumosa School of the Arts earns LEED Gold

Education project dedicated to teaching sustainability in the classroom.

| Jun 22, 2012

USGBC Joins Six Major Organizations at Rio+20 to Launch the Global Initiative on Urban Resilience

Global initiative is designed to spur building and infrastructure development, create new investment opportunities, and foster community action around the world

| Jun 19, 2012

Armstrong Issues Environmental Product Declarations On Nine Popular Ceiling and Steel Suspension Systems

Transparent new documentation allows end users to make more informed decisions when selecting ceilings for projects

| Jun 18, 2012

Tremco Commercial Sealants & Waterproofing Unveils Sustainable Building Solutions Test Facility

State-of-the-art facility provides a controlled testing environment of air and moisture infiltration/exfiltration in air barrier systems and building enclosures

| Jun 15, 2012

InPro’s bio-content becomes Cradle-to-Cradle CertifiedCM Silver

Two main components of G2 Blend formula now C2C Certified Silver.

| Jun 13, 2012

Free webinar on Designing and Building Green Schools scheduled for June 20

USGBC Center for Green Schools and other experts to present practical tips.

| Jun 13, 2012

Steven L. Newman Real Estate Institute to hold energy asset conference for property owners, senior real estate managers

Top-level real estate professionals have been ignored as the industry has pushed to get sustainability measures in place.

| Jun 8, 2012

Living Building Challenge wins the 2012 Buckminster Fuller Challenge

The Living Building Challenge was chosen from a pool of 122 of entries from around the world.

| Jun 8, 2012

Nauset Construction completing sustainable dorm for Brooks School

Student input on green elements provides learning experience.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021