Fire Resistive Curtain Wall Helps Hospital Meet Fire and Seismic Requirements

Sponsored Content Fire-Rated Products

Fire Resistive Curtain Wall Helps Hospital Meet Fire and Seismic Requirements

SaftiFirst’s custom curtain wall complied with all the seismic requirements while still blending in seamlessly with building’s design


By SaftiFirst | March 7, 2016

Project Name: San Jose Downtown Health Center in San Jose, CA
Architect:
Ratcliff
General Contractor: Flint Builders
Glazing Contractor: Montez Glass
Products:  SuperLite II-XL 60 insulated with Solarban 70XL in GPX Curtain Wall Framing (exterior); SuperLite II-XL 60 in GPX Architectural Series Walls and GPX Builders Series Temperature Rise Doors (interior) 

California has a long history of experiencing major, catastrophic earthquakes, and is predicted to experience more in the future.  According to the Office of Statewide Health and Planning’s (OSHPD) report on California’s Hospital Seismic Safety Law, a moderately strong earthquake (6.0 to 6.9 magnitude) occurs in the state every two to three years.  Since it is not a question of “if” but rather “when” the next major earthquake will occur, California now has stricter seismic requirements in the building code, with special requirements for critical facilities that need extra protection.

In 1973, the legislature passed the Alfred E. Alquist Hospital Seismic Safety Act, which required acute care hospitals to be designed and constructed to withstand a major earthquake and remain operational immediately after.  However, the 1994 Northridge earthquake (with a 6.7 magnitude) revealed that many hospital buildings performed poorly. This led to the passage of Senate Bill (SB) 1953, which amended the Alquist Act to require hospitals to evaluate their general acute care building for seismic resistance based on the standards set by OSHPD. 

How have some hospitals complied with SB 1953?  In 2008, Santa Clara Country proposed Measure A, which would allocate $50M towards funding a new facility to replace the old San Jose Medical Center that was shut down in 2004 due to rising operational costs and a mandated seismic retrofit, which would have cost hundreds of millions of dollars.  Measure A passed without opposition in 2012, and groundbreaking on the construction of a modern, seismically fit San Jose Downtown Health Center began soon after. 

Ratcliff was chosen as the architect to design the new three-story, 60,000 square foot facility that includes urgent care for adults and children, primary care for pediatric, OB/GYN and family medicine, behavioral health services, laboratory, pharmacy and radiology departments. Their design takes advantage of glazing’s ability to draw natural light from the outdoors to achieve LEED Gold Certification. The abundance of natural light also creates a warm, pleasing atmosphere that promotes healing and reduces anxieties often associated with medical visits. 

Part of the hospital’s exterior curtain wall had to be fire rated for one hour.  To keep the transparent look, the architects specified a one hour fire resistive curtain wall with SuperLite II-XL 60 insulated with Solarban 70XL in GPX Curtain Wall framing to meet the design, energy and fire requirements.  The fire resistive curtain wall was supplied with custom extrusions to match the system depth and finish of the adjacent non-rated curtain wall for a uniform, seamless look. 

To comply with seismic requirements, the engineers at SAFTI FIRST worked with the building team to provide a custom fire resistive curtain wall system that allowed for deflection and story-drift movement specifically designed to work in concert with the adjacent non-rated curtain wall.  This was to ensure that in the event of an earthquake, both systems would work together and remain intact, thus allowing the hospital to remain fully functional.  

Another concern was providing safe paths of egress in case the earthquake triggers a fire in the hospital.  One hour rated egress stairways are on both sides of the building.  To keep the light-filled transparent look throughout the building, the architects used SuperLite II-XL 60 in GPX Architectural Series Framing.  For maximum vision, the architects also used SuperLite II-XL 60 in GPX Builders Series Temperature Rise Door Framing in order to exceed the otherwise 100 sq. in. code limitation imposed on fire protective glass (such as wired glass, ceramics, etc.). in the door vision panels.  This fire resistive door and wall assembly gives one-hour of full protection from smoke, flames and radiant heat, which allows patients and staff to exit safety or provide a safe haven as they await rescue.

The result is a beautiful, modern health center that will bring much needed services to the community for many years to come.  The new San Jose Downtown Health Center is scheduled to open its doors to the public in 2016.

Related Stories

| Jan 10, 2014

What the states should do to prevent more school shootings

To tell the truth, I didn’t want to write about the terrible events of December 14, 2012, when 20 children and six adults were gunned down at Sandy Hook Elementary School in Newtown, Conn. I figured other media would provide ample coverage, and anything we did would look cheap or inappropriate. But two things turned me around.

| Jan 10, 2014

Special Report: K-12 school security in the wake of Sandy Hook

BD+C's exclusive five-part report on K-12 school security offers proven design advice, technology recommendations, and thoughtful commentary on how Building Teams can help school districts prevent, or at least mitigate, a Sandy Hook on their turf.

| Jan 9, 2014

16 recommendations on security technology to take to your K-12 clients

From facial recognition cameras to IP-based door hardware, here are key technology-related considerations you should discuss with your school district clients.

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 5, 2013

Exclusive BD+C survey shows reaction to Sandy Hook tragedy

More than 60% of AEC professionals surveyed by BD+C said their firms experienced heightened interest in security measures from school districts they worked with. 

| Nov 14, 2013

Tyco acquires Westfire Inc.

US Operations of Global Acquisition Strengthen Tyco SimplexGrinnell’s Special Hazards Fire Protection Capabilities for Mining, Telecommunications and Energy Markets

| Oct 27, 2013

SimplexGrinnell Awarded Contract by National Joint Powers Alliance for Streamlined Procurement of Fire and Life-Safety Solutions

Agreement Provides 50,000 Public Entities with Simplified Access to Comprehensive Suite of Products and Services

| Aug 23, 2013

The Exploratorium’s tall order

The newly-opened Exploratorium has brought energy and excitement to the city’s bustling waterfront.  EHDD transformed the historic Pier 15, built in 1915, to a 330,000 square foot indoor and outdoor campus, being touted as the largest net-zero building in the city and potentially the largest net-zero museum in the world.

| Aug 22, 2013

New CO-PLATE makes revenue generation through CO detector replacement easier

With the first round of system-connected carbon monoxide (CO) detectors reaching their end of life, there’s a big opportunity for dealers and installers to increase their revenue streams through CO detector replacements. System Sensor has launched a new CO-PLATE Carbon Monoxide Detector Plate to coincide with this opportunity. 

| Jul 12, 2013

Statue of Liberty Monument bolstered by Vetrotech Saint-Gobain’s fire-rated glass

The Statue of Liberty National Monument reopened to the public featuring two new fire stairwells and an elevator that will allow visitors with reduced mobility to look into the Statue’s interior structure. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021