flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Enter the world of deep time: David H. Koch Hall of Fossils

Reconstruction Awards

Enter the world of deep time: David H. Koch Hall of Fossils

The new enclosed FossiLab gives visitors a glimpse into the exacting work of Smithsonian scientists and preservationists.


By Robert Cassidy, Executive Editor | December 10, 2019
Smithsonian Koch Hall

Photo: Smithsonian Institution

The nearly four-year restoration of the David H. Koch Hall of Fossils and installation of the new Deep Time exhibit at the Smithsonian National Museum of Natural History—from building design and construction, to specimen conservation and installation, to exhibit design and fabrication, and finally to commissioning—took place even as the 1910 Beaux Arts gallery remained open to eight million annual visitors.

The project team, led by design firm EwingCole, uncovered and restored the magnificent skylight above the hall. The designers used a glazing system based on aerogel nanotechnology to act as insulator and filter against UV light and heat, bringing daylight into the gallery for the first time in two decades and protecting the 65-million-year-old specimens below.

The hall’s ornate plasterwork, which had been lost for generations, was recreated by skilled craft workers using ancient methods. Templates for the new moldings were cast from original building fabric in a sibling gallery, Sant Ocean Hall.

The new enclosed FossiLab gives visitors a glimpse into the exacting work of Smithsonian scientists and preservationists, while mitigating high levels of noise and dust pollution from adjacent galleries.

 

HONORABLE MENTION

BUILDING TEAM EwingCole (submitting firm, architect, SE, MEP) Smithsonian Institution—Smithsonian Facilities/Office of Planning, Design and Construction (owner) Reich + Petch (exhibit designer) Grunley Construction (GC) DETAILS 32,000 sf Total cost $125 million Construction time August 2015 to June 2019 Delivery method Design-bid-build

Related Stories

Reconstruction Awards | Nov 16, 2015

Lumberyard turned into Chicago charter school

While the existing structures were in poor condition, the Building Team preserved and restored 75% of the spaces and incorporated historic elements in the final design of the Intrinsic School on Chicago's Northwest side.

Reconstruction Awards | Nov 12, 2015

Columbia Grammar and Preparatory School grows with the times

The 251-year-old NYC school was a design-build project that overcame issues like tight space and zoning appeals during its redevelopment.

Reconstruction Awards | Nov 10, 2015

Restoration of the Whitney Building provides hope for Detroit

Four years ago, Whitney Partners purchased the 253,000-sf Whitney for $3.3 million. Their mission was to turn the 19-story structure into a mixed-use hotel, rental apartment, and retail center that would serve as a reminder of more prosperous times in Detroit’s past.

Reconstruction Awards | Nov 9, 2015

University of Chicago uses space economically with Saieh Hall

The five-story, 100,000-sf seminary was converted into a modern education facility that would be fully integrated into the university’s Hyde Park campus. The project demonstrated the university’s commitment to finding a balance between new construction and adaptive reuse of historically significant buildings.

Reconstruction Awards | Nov 9, 2015

King of kings: Classic brooklyn movie theater stages a return engagement

The theater, which withstood vacancy, neglect and vandalism, has been redeveloped with a goal: balance preservation with the creation of a modern performance space.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021