On the surface, hanging drywall doesn’t sound like one of the more dangerous activities a construction professional can engage in on the jobsite. However, thanks to things like chronic schedule overruns and high worker injury rates from the repetitive tasks involved with drywall finishing, one in four drywall workers will develop musculoskeletal issues at some point that can shorten their careers.
Canvas, a construction robotics company, is looking to mitigate the risk of injury for drywall professionals by taking the robot out of the factory and onto the construction site. These drywall robots feature sensors, a lift station, and a mechanical arm to eliminate the need for workers to do the more repetitive elements of drywall work.
Additionally, the Canvas system protects workers from falls by doing all the “high work” and eliminates 99.9 percent of the dust that is produced during the sanding phase of the drywall process. The robot provides high-quality finishes every time and reduces the typical finishing cycle times from seven days down to two, according to Canvas.
The goal of the Canvas system is not to replace human workers, but to provide them with better tools to more efficiently accomplish their jobs.
“We’ve seen firsthand the unparalleled skill and expertise that a union drywall finisher leverages to make gorgeous interiors,” the Canvas website reads. “We believe in creating tools that amplify those skills, and we exist to make them more successful.”
Recently, the Canvas system has been used for new drywall installations at the San Francisco International Airport and the University of California San Francisco campus. Canvas will be announcing partnerships with various general contractors on Dec. 6.
Related Stories
Great Solutions | Aug 23, 2016
Visual energy model database demystifies net-zero design
Diamond Schmitt Architects’ ecoMetrics tool allows its designers to quickly analyze solutions based on models from 44 LEED-certified projects.
Great Solutions | Aug 23, 2016
Reusable infection control barriers ease hospital renovation
Clark Construction Group pilots the Edge Guard system on the Fair Oaks (Va.) Hospital reconstruction project.
Great Solutions | Aug 23, 2016
Novel construction approach speeds K-12 school projects
The Folia system uses pre-engineered components to deliver school buildings at 20% less cost.
Great Solutions | Aug 23, 2016
Mobile emergency room arrives just in time for Alabama hospital
The MED-1 Mobile Hospital Unit serves as a lower-cost solution during construction of new ED.
Great Solutions | Aug 23, 2016
Durable coffeemaker brings a bit of comfort to job sites
The CoffeeBoxx is lightweight rust proof, dust proof, water resistant, and ultra durable.
Great Solutions | Aug 23, 2016
Reclaimed wood paneling adds color to retail and hospitality projects
Colorburst panels are available in four stock options—Robin Egg Blue, Viridian Green, Haute Pink, and Cascade White—as well as custom colors.
Great Solutions | Aug 23, 2016
Biophilic pods beat the shade when it comes to outdoor cooling
The Xylem concept by CallisonRTKL regulates outdoor thermal comfort through shading, air movement, water circulation, and a vegetated roof.
Great Solutions | Aug 23, 2016
Mini-grant R&D program pays off in a big way for AE firm
Created through funding from Little’s LaceUp program, the Center for Building Performance has helped the design firm win 14 new jobs since its inception.
Great Solutions | Aug 23, 2016
At Beyer Blinder Belle everyone’s seeing RED
The firm’s R&D initiative inspires its designers to develop ideas that could positively disrupt the practice.
Great Solutions | Aug 23, 2016
Virtual care facility serves remote patients, may reduce readmissions
Mercy’s new high-tech medical center equips its medical professionals to deliver care at the bedside of patients anywhere.