flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Douglas County Community and Senior Center, a focal point for all ages

Sponsored Content Senior Living Design

Douglas County Community and Senior Center, a focal point for all ages

The Douglas County Community and Senior Center, completed in July 2014, was built to become the focal point of the community as a whole for all ages


By MBCI | August 5, 2015
Douglas County Community and Senior Center, a focal point for all ages
Douglas County Community and Senior Center, a focal point for all ages

The Douglas County Community and Senior Center offers a variety of recreational activities, programs and events. Their mission is to continue to positively affect the community and enrich life. The community center is somewhere people of all ages and lifestyles are able to gather to promote unity, healthy living, education and community pride.

Problem

In Douglas County, 30 percent of the 46,000 residents are senior citizens; thus the need for a senior community center had been vocalized for decades. In 1995, the Kahle Community Center was built for the lake portion of Douglas County. This left the larger population of Carson Valley without similar services and community activities. Therefore the Douglas County Board of Commissioners determined that the time to act was now, and the Douglas County Community and Senior Center was built. It is one of the largest projects accepted by Douglas County, consisting of nearly 80,000 square feet.

Solution

The Douglas County Community and Senior Center, completed in July 2014, was built to become the focal point of the community as a whole for all ages and continues to create and preserve quality parks and recreation opportunities. The facility was designed by Tate Snyder Kimsey Architecture and offers many amenities including conference and meetings rooms and a gym and fitness center with two full basketball courts, an indoor track, exercise equipment, two racquetball courts and so much more. It is a state of the art building for a commendable community.

Commercial Roofers, Inc. installed MBCI’s Craftsman™ Series and Artisan® Series, both in Galvalume, PBC panels in Slate Gray and flat sheet panels in Galvalume and Slate Gray.

Core Construction, the general contractors on the project, selected PBC metal panels for the roof and exterior walls. The PBC panels were attached to the building structure with exposed fasteners. Photovoltaic (PV) panels were installed on top of the PBC roof panels. A PV system’s efficiency improves when installed on a cool metal roof, as done with the Douglas Center, increasing the energy output of the solar modules.

The Craftsman Series panels were tapered and installed on the roof of the cylinder section of the building. The Craftsman Series is a snap-on batten roof system, available in small, large and high profiles.  Craftsman Series – Small Batten panels were used on this facility because the vertical legs of the panel are only ¾” long, allowing it to curve to the shape of the cylinder.

MBCI’s Artisan Series panels were used as soffit panels on the community center. The simplicity of the Artisan Series panel is its best design feature because its uniform dimensions and smooth look allow the designer to plan modules, eliminating complicated pieces and following wall curvatures. The fastener is concealed behind the flush face, creating a clean appearance.

Lastly, Commercial Roofers, Inc. used MBCI’s 24-gauge flat sheets to make their own trim onsite.

Project Specs 

MBCI Products: PBC, Artisan® Series, Craftsman™ Series - Small Batten, Flat Sheets
Location: Minden, Nevada
Color: Slate Gray and Galvalume
Coverage: 78,000 sq. ft.
Architect: Tate Snyder Kimsey Architecture; Reno, Nevada
Roofing Contractor: Commercial Roofers, Inc. Las Vegas, Nevada
General Contractor: Core Construction Services of Nevada Inc., Reno, Nevada

Related Stories

Adaptive Reuse | Jul 27, 2023

Number of U.S. adaptive reuse projects jumps to 122,000 from 77,000

The number of adaptive reuse projects in the pipeline grew to a record 122,000 in 2023 from 77,000 registered last year, according to RentCafe’s annual Adaptive Reuse Report. Of the 122,000 apartments currently undergoing conversion, 45,000 are the result of office repurposing, representing 37% of the total, followed by hotels (23% of future projects).

Multifamily Housing | Jul 13, 2023

Walkable neighborhoods encourage stronger sense of community

Adults who live in walkable neighborhoods are more likely to interact with their neighbors and have a stronger sense of community than people who live in car-dependent communities, according to a report by the Herbert Wertheim School of Public Health and Human Longevity Science at University of California San Diego.

Multifamily Housing | Jun 29, 2023

5 ways to rethink the future of multifamily development and design

The Gensler Research Institute’s investigation into the residential experience indicates a need for fresh perspectives on residential design and development, challenging norms, and raising the bar.

Urban Planning | Jun 15, 2023

Arizona limits housing projects in Phoenix area over groundwater supply concerns

Arizona will no longer grant certifications for new residential developments in Phoenix, it’s largest city, due to concerns over groundwater supply. The announcement indicates that the Phoenix area, currently the nation’s fastest-growing region in terms of population growth, will not be able to sustain its rapid growth because of limited freshwater resources. 

Multifamily Housing | Jun 15, 2023

Alliance of Pittsburgh building owners slashes carbon emissions by 45%

The Pittsburgh 2030 District, an alliance of property owners in the Pittsburgh area, says that it has reduced carbon emissions by 44.8% below baseline. Begun in 2012 under the guidance of the Green Building Alliance (GBA), the Pittsburgh 2030 District encompasses more than 86 million sf of space within 556 buildings. 

Industry Research | Jun 15, 2023

Exurbs and emerging suburbs having fastest population growth, says Cushman & Wakefield

Recently released county and metro-level population growth data by the U.S. Census Bureau shows that the fastest growing areas are found in exurbs and emerging suburbs. 

Multifamily Housing | May 16, 2023

Legislators aim to make office-to-housing conversions easier

Lawmakers around the country are looking for ways to spur conversions of office space to residential use.cSuch projects come with challenges such as inadequate plumbing, not enough exterior-facing windows, and footprints that don’t easily lend themselves to residential use. These conditions raise the cost for developers.

Senior Living Design | May 8, 2023

Seattle senior living community aims to be world’s first to achieve Living Building Challenge designation

Aegis Living Lake Union in Seattle is the world’s first assisted living community designed to meet the rigorous Living Building Challenge certification. Completed in 2022, the Ankrom Moisan-designed, 70,000 sf-building is fully electrified. All commercial dryers, domestic hot water, and kitchen equipment are powered by electricity in lieu of gas, which reduces the facility’s carbon footprint.

Multifamily Housing | Apr 27, 2023

Watch: Specifying materials in multifamily housing projects

A trio of multifamily housing experts discusses trends in materials in their latest developments. Topics include the need to balance aesthetics and durability, the advantages of textured materials, and the benefits of biophilia.

Contractors | Apr 10, 2023

What makes prefabrication work? Factors every construction project should consider

There are many factors requiring careful consideration when determining whether a project is a good fit for prefabrication. JE Dunn’s Brian Burkett breaks down the most important considerations. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021