flexiblefullpage -
interstitial1 - interstitial
Currently Reading

Campus builder: Everett University Center at Washington State University

Building Team Awards

Campus builder: Everett University Center at Washington State University

Silver Award: WSU kicks off its new branch campus with a high-tech innovation center designed to engage students, businesses, and the community.


By David Barista, Editorial Director | May 21, 2018

The atrium is adorned with a striking cantilevered Douglas Fir staircase as a nod to the storied history of the Pacific Northwest timber industry and a statement of modern engineering. Benjamin Benschneider Photography.

As the anchor building of a new branch campus for Washington State University, the 95,000-sf Everett University Center plays a crucial role in providing STEM-based baccalaureate and graduate programs to the North Puget Sound region. Previously, this area had been underserved by higher education opportunities for low- and middle-income families. The facility is the inaugural building of a master-planned campus.

The EUC is designed to engage students, local businesses, and the community. The four-story atrium serves as an interior street and is fronted by key student support elements with multiple “storefronts” for student services, a tiered lecture hall, classroom, and the Capstone Studio, an upper-division lab providing students and industry partners a place for invention and innovation. Large bifold doors in the lab spaces open to a paved outdoor workspace for lab work, demonstrations, and community participation.

 

 

The atrium is adorned with a striking cantilevered Douglas Fir staircase as a nod to the storied history of the Pacific Northwest timber industry and a statement of modern engineering. The wood stair structure is made of 5/8-inch-thick lamella, custom bent and glued to create sinuous full-length spans for the stringers spanning up to 44 feet.

Green features in this LEED Gold-registered building are on display throughout. The photovoltaic panels are showcased along the roofline on the southern façade. Supported by a cantilevered steel subframe, the PVs extend 10 feet beyond the face of the building, as a modern interpretation of a cornice. A dashboard in the lobby displays real-time PV productivity and the building’s energy consumption.

The atrium is naturally cooled and ventilated with mechanically operable windows and louvers. During winter months, heat energy is harvested from the building’s data center and reused in the atrium’s hydronic radiant floor. Rainwater is captured in a below-grade cistern and repurposed for toilet flushing and irrigation.

 

 

Building Team — Submitting firm, architect SRG Partnership Owner Washington State University Structural engineer KPFF Consulting Engineers MEP engineer McKinstry General contractor Hoffman Construction

General Information — Size 95,000 sf Construction cost $64.6 million Construction time July 2015 to May 2017 Delivery method Design-build

 

Return to the 2018 Building Team Awards Landing Page

Related Stories

| Aug 29, 2022

Montana becomes first U.S. state to approve 3D printing in construction

Montana is the first U.S. state to give broad regulatory approval for 3D printing in building construction.

Architects | Apr 22, 2022

Top 10 green building projects for 2022

The American Institute of Architects' Committee on the Environment (COTE) has announced its COTE Top Ten Awards for significant achievements in advancing climate action.

Concrete Technology | Apr 19, 2022

SGH’s Applied Science & Research Center achieves ISO 17025 accreditation for concrete testing procedures

Simpson Gumpertz & Heger’s (SGH) Applied Science & Research Center recently received ISO/IEC17025 accreditation from the American Association for Laboratory Accreditation (A2LA) for several concrete testing methods.

2021 Building Team Awards | Jan 14, 2022

First public-private partnership project in Veterans Administration history saves $34 million in costs

LEO A DALY and McCarthy Building Companies head the project team for the Omaha VA Ambulatory Care Center in BD+C’s 2021 Building Team Awards.

Building Team Awards | Dec 8, 2021

A performing arts center celebrates a legendary rocker and his birthplace

Buddy Holly Hall in Texas receives BD+C’s Silver Building Team Award.

Building Team Awards | Dec 7, 2021

A rapid response to a health emergency

Baptist Hospital of Miami’s 233-bed Hope Tower receives BD+C’s Bronze Building Team Award

Building Team Awards | Dec 3, 2021

Putting science on display, thanks to a design-build approach

UC Riverside’s Plant Growth Environments Facility receives BD+C’s Bronze Building Team Award.

Building Team Awards | Dec 2, 2021

An academic ‘precinct’ brings arts and sciences together

Wofford College’s Chandler Center for Environmental Studies receives BD+C’s Silver Building Team Award.

Building Team Awards | Dec 1, 2021

Denver sets the bar for water reclamation and reuse

A new administration building for the city’s water utility company scores Platinum in BD+C’s 2021 Building Team Awards.

2021 Building Team Awards | Nov 17, 2021

Caltech's new neuroscience building unites scientists, engineers to master the human brain

The Tianqiao and Chrissy Chen Institute for Neuroscience at the California Institute of Technology in Pasadena wins a Gold Award in BD+C's 2021 Building Team Awards.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021