flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

California medical center breaks ground on behavioral health facility for both adults and children

Healthcare Facilities

California medical center breaks ground on behavioral health facility for both adults and children

Improved patient privacy, more outdoor access are key to HGA’s design for the 207,000-sf Child, Adolescent, and Adult Behavioral Health Services Center. 


By Novid Parsi, Contributing Editor  | March 25, 2023
California medical center breaks ground on behavioral health facility for both adults and children Rendering courtesy HGA
All renderings courtesy HGA

In San Jose, Calif., Santa Clara Valley Medical Center (SCVMC) has broken ground on a new behavioral health facility: the Child, Adolescent, and Adult Behavioral Health Services Center. The facility will open to patients in fall 2025.

Designed by HGA, the center will bring together under one roof Santa Clara County’s behavioral health offerings, including Emergency Psychiatric Services and Urgent Care. The new facility aims to fill a regional service gap as the first Santa Clara County-operated inpatient facility specifically for children and adolescents in need of behavioral health care, and it will have a separate floor for adults.

With the three-story, 207,000-sf behavioral health facility, SCVMC will expand its current adult behavioral health programs to include co-located outpatient and inpatient services for children and adolescents in an age-appropriate treatment environment.

Key spaces include a 77-bed inpatient behavioral health hospital that will serve adults and minors on different floors, separate outpatient urgent care for minors and adults, emergency psychiatric services with separate ambulance entry bays, treatment spaces for minors and adults, and a shared pharmacy. The facility also will have administrative offices, a new 700-car parking structure, and a pedestrian skyway bridge connecting to the existing emergency department.

Throughout the design phase, HGA met with multiple user groups three days per week. HGA researchers studied the impact of improved patient privacy and outdoor access on patient behavior and the need for restraint. The facility’s design prioritizes connections to nature with separate outdoor activity and recreation spaces for each inpatient unit and for Emergency Psychiatric Services.

On the Building Team:
Owner: County of Santa Clara Health System
Design architect: HGA, supported by The Cuningham Group (associate architect and medical planner)
Architect of record: HGA
MEP engineer: Arup
Structural engineer: Arup
General contractor/construction manager: Webcor, SBay Construction, and Thompson Builders

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on Child, Adolescent, and Adult Behavioral Health Services Center, by HGA

Santa Clara Valley Medical Center breaks ground on Child, Adolescent, and Adult Behavioral Health Services Center, by HGA

Tags

Related Stories

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

| Aug 11, 2010

AGC unveils comprehensive plan to revive the construction industry

The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.

| Aug 11, 2010

PCL Construction, HITT Contracting among nation's largest commercial building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Commercial Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Webcor, Hunt Construction lead the way in mixed-use construction, according to BD+C's Giants 300 report

A ranking of the Top 30 Mixed-Use Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Report: Fraud levels fall for construction industry, but companies still losing $6.4 million on average

The global construction, engineering and infrastructure industry saw a significant decline in fraud activity with companies losing an average of $6.4 million over the last three years, according to the latest edition of the Kroll Annual Global Fraud Report, released today at the Association of Corporate Counsel’s 2009 Annual Meeting in Boston. This new figure represents less than half of last year’s amount of $14.2 million.

| Aug 11, 2010

Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms

A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Nonprofit healthcare providers turn to real estate for liquidity and to preserve capital, says Jones Lang LaSalle report

Long considered to be stable investments immune to recession, hospitals and other healthcare facilities are now feeling the effects of a cash-strapped economy as decreased charitable contributions are forcing nonprofit hospitals to pare back and seek new financing sources, according to Jones Lang LaSalle’s 2009 Healthcare Real Estate Financing Outlook.

| Aug 11, 2010

Gafcon announces completion of Coronado animal care facility

Gafcon, a leading California-based construction management and consulting firm, announced today that construction is now complete on a new $1.6 million animal care facility located at 1395 First Street in Coronado, Calif.

boombox1 - default
boombox2 -
native1 -

More In Category

Healthcare Facilities

Advancing Healthcare: Medical Office Buildings at the Forefront of Access and Safety

This article explores the pivotal shift from traditional hospital settings to Medical Office Buildings (MOBs), focusing on how these facilities enhance patient access. Discover the key drivers of this transformation, including technological advancements, demographic trends, and a growing emphasis on integrated, patient-centered care. Learn how MOBs are not only adapting to modern healthcare demands but are also leveraging modern access control and safety innovations.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021