Two loads you must understand before requesting an estimate

Sponsored content
July 30, 2015 |
Jenny Arrowood
Two loads you must understand before requesting an estimate

Mezzanine in a Bilbao metro station, Spain. Photo: Javierme/Wikimedia Commons.

The SBS Mezzanine inputs act as a tool to pass along complete and necessary information to your estimator. Having this information ensures that you receive your pricing back in a timely manner! We all want that.

Jenny Arrowood, Sales Engineer at Star Buildings, discusses the two loads to understand for mezzanine loads.

The most influential factors in your mezzanine pricing are member spans, mezzanine loads, and required clearances. The more restrictive the clearances are, the greater the impact on your mezzanine framing. Knowing the maximum available or required clearances above and below your mezzanine will get you the most accurate design and cost effective pricing.

Another factor in mezzanine pricing is the loading required. The higher the loads are, the greater the impact to the cost of the mezzanine. There are two primary types of loads: dead and live.

Dead loads

Dead loads are the self-weight of the mezzanine structure, i.e. the weight of the mezzanine joists, beams, decking material and floor systems, etc.

Dead loads can largely vary depending on the deck material. For example, the typical dead load for a plywood deck is about 1 psf for every ¼” of thickness. Meaning for a 1” plywood deck, the dead load would be about 4 psf. In contrast, a normal weight concrete deck is about 12 psf for every 1” of thickness. For a 4” concrete deck, you will have a 48 psf dead load.

Live loads

Live loads are a result of the expected mezzanine use and consider the weight of people, furniture, mechanical units, or anything else that will be supported by the mezzanine.

The building code has a minimum load that is required for every mezzanine use. For example, the code minimum for a light-storage mezzanine is 125 psf. For an office with no hallways, the minimum is 50 psf. That’s a 75 psf difference!

Another type of live load required on mezzanines is called a partition load. The partition load accounts for any walls, or partitions, that will be supported by the mezzanine. A minimum of 15 psf partition load is required per the building code unless the mezzanine live load is 80 psf or greater and partitions will not be installed.

For more, continue reading on the Star Buildings blog.

Jenny Arrowood | Metal Building Trends

As a Sales Engineer at Star Building Systems, Jenny Arrowood serves as the estimating contact for the North Western United States and Canada. After receiving her degree in Architectural Engineering from the University of Oklahoma in 2012, Jenny joined Star as a Design Engineer before moving to Estimating in 2013. In October 2014, Jenny passed the Professional Engineering Exam in Nevada with only two years of work experience. In her free time, Jenny enjoys spending time with her husband, John, and their dog, Buddy, as well as leading a local adult kickball team.

Related Blogs

January 15, 2018 | Metal Building Trends

The combination of design flexibility and high value-to-cost enable design professionals to provide their c...

December 28, 2017 | Metal Building Trends

The latest code cycle requires higher insulation values and an air barrier in the thermal envelope.

December 20, 2017 | Metal Building Trends

Metal building systems have great longevity… if properly maintained.

October 18, 2017 | Metals | Metal Building Trends

Star metal building systems have once again demonstrated their durability in extreme weather events.

August 24, 2017 | Building Materials | Metal Building Trends

No matter what structural material you build with, be it steel, concrete, or wood, water is the enemy.  ...

June 20, 2017 | Building Team | Metal Building Trends

Getting a project through plan review can be an unusually long process, anywhere from six months to two yea...

May 22, 2017 | Metals | Metal Building Trends

In many metal building applications, straight columns may have more steel than they need.

May 08, 2017 | Building Team | Metal Building Trends

The most important factor in making sure the where, when, what, and how go smoothly is making sure you pick...

Overlay Init