IECC 2015 and ASHRAE 90.1-2013: Metal building envelope updates you need to know

The latest code cycle requires higher insulation values and an air barrier in the thermal envelope.

Sponsored content
December 28, 2017 |
Bill Beals

The next commercial energy code cycle for most states is the IECC 2015 code and ASHRAE 90.1-2013 alternative path. For some states, the new code has already gone into effect as of January 1, 2017, but the exact timing of implementation depends on each state. Remember that each state is in a code cycle, which lasts two to three years. So, theoretically, your state could switch in the next few months or in a few years. Check the status of your state energy code at energycodes.gov.

Also, before you continue reading about the latest code cycle, you might want to revisit my primer on ensuring commercial code compliance in a post I wrote back in 2014. That blog breaks down a lot of the background information pertinent to understanding the current code landscape, such as the difference between IECC and ASHRAE.

Which States Have Made the Jump

  • Alabama
  • California
  • Illinois
  • Maryland
  • Massachusetts
  • Michigan
  • New Jersey (adopted ASHRAE 90.1-2013)
  • New York
  • Oregon
  • Utah
  • Texas
  • Vermont (state-specific code modeled after IECC 2015)
  • Washington

 Also, the new code cycle will be effective in Georgia January 1, 2018.

An Overview: IECC 2015 and ASHRAE 90.1-2013

First, it’s important to know that I base the most recent code cycle changes on comparisons of the IECC 2012 code and the ASHRAE 90.1-2010 Standard. If your state’s current code is based on the older IECC 2009 and ASHRAE 90.1-2007 Standard, you will see more significant envelope changes. Many states currently at the IECC 2009 code are bypassing IECC 2012 altogether and adopting IECC 2015. This is a large jump, and many metal building contractors will feel the pressure. If you haven’t used Liner Systems (Ls) or Filled Cavity/Long Tab Systems in the past, you will be required to start using them.

The choices are the same for the rest of the envelope. The building designer will have to make the decision to pursue either IECC 2015 or ASHRAE 90.1-2013. Once that decision is made, the entire building envelope, including mechanicals and lighting, must follow the same path.

Liner Systems (Ls) and Long Tab Banded Systems (FC): What’s the Difference?

First, liner systems (Ls) such as OptiLiner® are typically proprietary and, as you probably guessed, must meet ASHRAE’s requirements in order to be defined as a liner system. Long tab banded systems are usually non-proprietary and meet the specifications of a filled cavity (FC) system.

 

Continue reading on the Star Buildings blog…

Bill Beals | Metal Building Trends

Bill Beals, District Manager of Therm-All Insulation, is a 30-year veteran of the metal building industry. Bill is a contributing member of several committees, including the Metal Building Manufacturers Association (MBMA) Energy Committee and the National Insulation Association (NIA) Laminators Committee.

Bill also belongs to the International Code Council (ICC) and is often invited to share his extensive energy code knowledge through presentations at industry conferences, most recently including The 45th Annual Metal Building Contractors and Erectors (MBCEA) Conference. Bill has contributed to many articles and reference guides, and authors Therm-All’s bi-monthly commercial energy codes blog called “The Code Man”.

Related Blogs

January 15, 2018 | Metal Building Trends

The combination of design flexibility and high value-to-cost enable design professionals to provide their c...

December 20, 2017 | Metal Building Trends

Metal building systems have great longevity… if properly maintained.

October 18, 2017 | Metals | Metal Building Trends

Star metal building systems have once again demonstrated their durability in extreme weather events.

August 24, 2017 | Building Materials | Metal Building Trends

No matter what structural material you build with, be it steel, concrete, or wood, water is the enemy.  ...

June 20, 2017 | Building Team | Metal Building Trends

Getting a project through plan review can be an unusually long process, anywhere from six months to two yea...

May 22, 2017 | Metals | Metal Building Trends

In many metal building applications, straight columns may have more steel than they need.

May 08, 2017 | Building Team | Metal Building Trends

The most important factor in making sure the where, when, what, and how go smoothly is making sure you pick...

May 03, 2017 | Metals | Metal Building Trends

There are robust, well-proven ways to protect steel so it can perform up to its potential virtually indefin...

Overlay Init