The future of the ambulatory surgery centers and acuity levels

Offering the one-two punch of cost savings and convenience, ASCs are increasingly becoming the venue of choice for both physicians and patients.

June 26, 2018 |
GS&P Dialogue

Few would argue that the healthcare landscape is rapidly evolving. Today’s healthcare consumer has become far more engaged, not only demanding a greater level of personalization and convenience in their healthcare experience, but also seeking greater transparency in areas such as network coverage and medical costs. These changing patient expectations, coupled with advances in medical technology, have created a paradigm shift in healthcare delivery that is taking emergent care and surgical procedures beyond hospital walls and into outpatient facilities such as freestanding emergency departments (FSEDs) and ambulatory surgery centers (ASCs). Offering the one-two punch of cost savings and convenience, ASCs are increasingly becoming the venue of choice for both physicians and patients because of their ability to perform increasingly complex surgeries thanks to improved anesthetic techniques and less invasive surgical procedures—services that typically come with a much higher price tag when performed in a hospital setting.

Given this market trend, it is quite feasible that ASCs will be receiving a greater number of high-acuity patients in the future. In fact, recent legislation in Florida proposed that ASCs should be able to keep patients for at least 24 hours, and then allow them to stay up to 72 hours in a post-surgical Recovery Care Center (RCC), while Arizona, Connecticut and Illinois have all established licensing standards for RCCs. If this trend continues, it will open the door to an entirely new type of outpatient facility where an ASC can take on more complex and varied types of surgeries.

 

The freestanding emergency department was a foreshadowing of things to come in terms of stand-alone outpatient care. Photo: Baptist Emergency at Town Center, Jacksonville, Florida.The freestanding emergency department was a foreshadowing of things to come in terms of stand-alone outpatient care. Photo: Baptist Emergency at Town Center, Jacksonville, Florida.

 

Sustainability of the Traditional Hospital Model

One foreseeable issue with including Recovery Care Centers in ASCs is the potential impact on the sustainability and health of traditional hospitals. For example, many of the services that could end up shifting from hospitals to ASCs are currently the big revenue generators for hospitals. If this migration occurs, it will take with it a certain portion of lower-acuity med/surg patients, and the hospital will lose that revenue. What remains in this scenario is the traditional hospital would continue to serve acute cases such as intensive, coronary and critical care patients that are typically more expensive to treat, resulting in fewer beds. It also raises the twofold question: What service lines do you continue to offer in a hospital, and can a hospital be sustained by higher-acuity beds? Moreover, could you still maintain the healthcare delivery models that comprise the higher-cost centers of excellence, such as cancer centers and cardiovascular/heart centers, all of which need to continue to be in a centralized hospital to provide coordinated care. These considerations also carry significant implications for the built environment.

 

Patient Safety and Acuity

There are two schools of thought within the healthcare industry when it comes to the subject of acuity levels and patient safety in ASCs. One is that it is an unnecessary risk to treat higher-acuity patients outside of the hospital environment, where if a patient crashes during a procedure, you can immediately transfer them to the OR rather than having to transport them to the hospital. Others argue that because ASCs specialize in the types of surgical procedures they perform that they can concentrate on patient safety, and, just like hospital ORs, the surgeons and nurses follow a specific set of protocols and procedures that consistently lead to positive patient outcomes. In contemplating the future of ASCs through the lens of patient safety and acuity, it brings to mind the 24/7 freestanding emergency department and similar discussions that surrounded this transformative outpatient care model when it was first coming into popularity. Essentially, FSEDs are designed to provide the same level of care as a hospital-based emergency room, and trauma patients, depending on their condition, can either be directly admitted to the facility for up to 24 hours or stabilized and transferred to the nearest hospital OR. In the same way that FSEDs had to establish clear transfer protocols for patients based on risk and acuity levels, I believe it is imperative to patient safety that ASCs establish a strong transfer protocol for the emergent patient.

 

In the same way that FSEDs had to establish clear transfer protocols for patients based on the level of acuity, ASCs with Recovery Care Centers should establish a strong transfer protocol for the emergent patient. Photo: Baptist Emergency at Town Center, Jacksonville, Florida.In the same way that FSEDs had to establish clear transfer protocols for patients based on the level of acuity, ASCs with Recovery Care Centers should establish a strong transfer protocol for the emergent patient. Photo: Baptist Emergency at Town Center, Jacksonville, Florida.

 

Planning for Uncertainty

With uncertainty rapidly becoming the new normal in healthcare, perhaps the best thing we can do is embrace it by planning for it. This means thinking through the space planning, programming and design of ASCs that incorporate 72-hour RCCs. And these planning considerations must be flexible in order to deal with the uncertainty of market conditions. Along with helping clients implement these changes, designers should also work with state regulatory agencies to determine how to implement regulations using previous best practices to build a case for a path forward. In other words, we need to evaluate what has worked in the past and then refine those models to determine the best-case design scenarios.

Planning for uncertainty also raises some key questions. These include: Is there enough need in your market for an RCC? If the answer is yes, then where will the RCC go? Is there enough space on-site? If so, will space need to be reconfigured or built out? How will it impact the overall facility in terms of circulation, serviceability and operational efficiencies? For example, ASCs partnered with RCCs will not only treat lower-acuity patients who are typically in and out of the facility within a day, but will also care for higher-acuity patients who will spend up to three days in recovery care. So, how will this impact operational efficiencies in terms of how staff delivers care across the various spaces? And perhaps the most important and timely question: If you choose to include these RCCs now as opposed to in the future, how do you design for a recovery unit that isn’t regulated? Do you wait, or should you be building for the future?

Ultimately, architects aren’t just planners and designers—we are strategic partners with our clients. It is our responsibility to work closely with them during the life cycle of a project to help them navigate complex areas such as regulatory compliance, and to stay fully informed of industry trends prior to the design of a project. These market trends not only have the potential to impact a client’s operations, but at the end of the day, the way they do business.

 

GS&P Dialogue | GS&P
Gresham, Smith and Partners

Gresham, Smith and Partners' blog, Dialogue, is about starting discussions. We want to get people thinking about issues and trends that are impacting the design services industry and the market sectors GS&P architects, engineers, interior designers, planners, consultants and environmental scientists serve. Great ideas are typically enhanced through conversation and often stifled by singular views and opinion. We hope you'll join in this conversation and help us to create a meaningful Dialogue. Visit http://dialogue.greshamsmith.com.

Related Blogs

September 11, 2018 | Urban Planning | GS&P

Believe it or not, alleys started off as public spaces.

August 23, 2018 | Big Data | GS&PJohnathan Woodside ,P.E., C.E.M., LEED AP (O+M)

As technology advances, Building Energy Modeling (BEM) is becoming an even more powerful tool for making in...

July 09, 2018 | BIM and Information Technology | GS&PRay Wong, AIA, MBA, NCARB, EDAC, LEED GA

Regardless of improved accuracy gains, caregivers may struggle with the idea of a computer logic qualifying...

April 12, 2018 | Transit Facilities | GS&PMary Clayton

In every city with transit, there are some success stories, some challenges and plenty of lessons learned....

March 09, 2018 | Architects | GS&PCorie Baker, AIA, LEED AP BD+C, EDAC

The Fitwel certification system is relatively simple and involves registering a building on a custom scorec...

February 21, 2018 | Airports | GS&PWilson Rayfield ,AIA, NCARB, LEED AP

This is the second post in our series examining why airport operators should bother to upgrade their facili...

At North Shore Medical Center, all state-of-the-art hybrid OR equipment was designed and installed for ceiling-mount suspension and functionality.

November 28, 2017 | Architects | GS&PStephan K. Gartman , RA, LEED AP

To help strike that delicate balance between the human and the high-tech, we must first have an in-depth un...

A GS&P-designed intersection in Tennessee

November 20, 2017 | Urban Planning | GS&PMichael Dorweiler , AICP

While there has been an emphasis on improving safety along corridors, it is equally important to focus on i...

A nurse station in a hospital with integrated artwork
October 10, 2017 | Designers | GS&PCarolyn Fleetwood Blake, LEED, AP, EDAC

With many hospital projects, art can be a construction-phase afterthought.

Terminal Modernization: Why Bother?
September 11, 2017 | Airports | GS&PWilson Rayfield, AIA, NCARB, LEED AP

A terminal modernization program can be a complicated and expensive task that airport operators may be hesi...

Overlay Init