Fire Rated Glass contributes to open lab environment at JSNN

Openness and transparency were high priorities in the design of the Joint School of Nanoscience & Nanoengineering within the Gateway University Research Park in Greensboro, N.C. Because the facility’s nanobioelectronics clean room houses potentially explosive materials, it needed to be able to contain flames, heat, and smoke in the event of a fire. SPONSORED CONTENT 

May 27, 2014 |
Bill O'Keeffe

1 hour fire resistive wall meeting ASTM E-119 requirements with SuperLite II-XL 60 in GPX Framing. Architect: HDR. Glazing Contractor: Charlotte Glass

Openness and transparency were high priorities in the design of the Joint School of Nanoscience & Nanoengineering (JSNN) within the Gateway University Research Park in Greensboro, N.C. The 105,000 square-foot interdisciplinary research facility is a collaboration of North Carolina A&T State University and The University of North Carolina at Greensboro. 

Because the $64 million facility’s state-of-the-art nanobioelectronics clean room houses potentially explosive materials, it needed to be able to contain flames, heat and smoke in the event of a fire. 

So architects from HDR chose to use fire rated glass and frames on the perimeter of the clean room.

SAFTI FIRST provided SuperLite II-XL 60 in GPX Frames for the 60 minute walls. SuperLite II-XL is tested to ASTM E-119/NFPA 251/UL 263, effectively containing flames, heat and smoke inside the room and preventing it from spreading to other rooms or into the corridor.  This enables building occupants to safely exit through the corridors.

Having transparent, fire rated walls also helps first responders see inside the room and visually assess the situation. Since the rating of the frame must match the rating of the glass, GPX Framing also tested to ASTM E-119/NFPA 251/UL 263 was used for the wall. Supplied with a clear anodized finish, the GPX Framing system matches the same hard-edged sightlines of extruded aluminum used in the non-rated systems.

Architects also favor the GPX Framing system for its clean appearance and uniform sightlines without any unsightly exposed fasteners. Used together, the SuperLite II-XL and GPX Framing system combines seamless and elegant wall-to-wall and floor-to-ceiling transparency and built-in maximum fire protection that works 24 hours a day, 7 days a week without relying on any mechanical or outside triggers.

In addition to meeting the design intent and the code requirements, the SuperLite II-XL 60 and GPX Framing system also provides noise abatement benefits with its high STC ratings and helps reduce energy costs by maximizing shared artificial lighting between spaces.

Read other recent project case studies. 

Editor's Note: This is sponsored content. The text and image were provided by the sponsor company.

Bill O'Keeffe | Clear on Technical Glass
SAFTI FIRST Fire Rated Glazing Solutions

About the Author: Bill O’Keeffe is the President and CEO of SAFTI FIRST Fire Rated Glazing Solutions, a leading USA-manufacturer of advanced fire rated glass and framing systems.  An industry veteran and innovator with over 45 years of experience in architectural glazing, he was first to introduce and manufacture clear, fire resistive glazing products in the US.  He is also a safety advocate who exposed the dangers of traditional wired glass, which lead to code changes and fire rated glass products that are safe, affordable and clear alternatives to traditional wired glass.  Today, Bill continues to develop building products that enable architects to create beautiful, safe and energy-efficient spaces with advanced glazing systems.

Related Blogs

Fire protective glazing used in a door vision panel in 60-90 minute exit stairway

The 2012 and 2015 IBC limits the size of ceramics and fire protective glazing used in the door vision panel in 60-90 minute exit stairway or passageways to 100 sq. in. regardless if the building is fully sprinklered. The only way to exceed the 100 sq. in. vision panel limitation is by using fire resistive glazing that meets ASTM E-119. 

July 19, 2017 | Fire-Rated Products | Clear on Technical Glass

As shocking as the Grenfell Tower fire was, it is not an isolated incident.

June 13, 2017 | Fire-Rated Products | Clear on Technical Glass

The ASTM E-119 test is the most stringent and most difficult test to pass for all fire rated glazing assemb...

GPX Hurricane with FL Product Approval was used in the new VA Medical Center in Orlando, FL.  Architect: RLF Architects.  Glazier: Harmon Inc. Photo Credit:  SAFTI FIRST

March 22, 2017 | Fire-Rated Products | Clear on Technical Glass

It may look like a regular window, but these advanced fire resistive glazing systems are recognized in the...

January 03, 2017 | Glass and Glazing | Clear on Technical Glass

Our mission is to produce appealing architectural products that protect people while providing our customer...

November 10, 2016 | Fire-Rated Products | Clear on Technical Glass

SuperLite II-XLM is a fire resistive multi-laminate glass product that meets ASTM E-119/UL 263/NFPA 251 and...

Photo: Messe Düsseldorf/ctillmann

October 14, 2016 | Glass and Glazing | Clear on Technical Glass

With 9 exhibition halls showcasing over 1,235 exhibitors from 52 countries and with over 40,000 visitors fr...

August 25, 2016 | Fire-Rated Products | Clear on Technical Glass

Choosing the correct and code approved fire rated glazing product can be confusing, this FAQ can help.

On New York City’s bulletin on lot line requirements – and how it applies everywhere else

1 hour curtain wall adjacent to a parking area in a private office in Valley Stream, NY. Products used: SuperLite II-XL 60 with PPG Starphire Low-Iron insulated with Low-E in GPX Curtain Wall Framing; Architect: RPF; Glazier: AMG Contracting

May 06, 2016 | Fire-Rated Products | Clear on Technical Glass

Determining when fire rated requirements apply, the type of fire rated glazing allowed, how much fire rated...

March 31, 2016 | Glass and Glazing | Clear on Technical Glass

Code limitations do not match manufacturer’s tested listings

Overlay Init