flexiblefullpage -
billboard - default
interstitial1 - interstitial
Currently Reading

BIM: What do owners want?

billboard - default
interstitial1 - interstitial
BIM and Information Technology

BIM: What do owners want?


By Brian Skripac | CannonDesign | April 17, 2017

I recently had the opportunity to moderate the Spring BIMForum conference (Conference Theme: BIM: What do Owners Want?). The conference hosted almost 500 industry leading architecture, engineering, construction and building owner professionals from across the country including two of our clients from The Ohio State University and University of California at San Diego who each had the opportunity to present. The conference provided a continued evolution from past BIMForum events including the Fall 2012 BIMForum which focused on BIM for Facilities Management. While only a very few owners were approaching the BIM for FM discussion at that time, the conversation has dramatically changed in 2017. As my co-moderator stated in our introductory comments, “we’ve come a long way baby.”

Now more than ever, owners are becoming extremely focused on leveraging BIM to deliver their projects. Moving beyond the simple request to state that projects be designed and/or constructed with BIM, owners are creating project delivery specifications and turnover guidelines that are BIM-centric and outline innovative BIM-enabled processes (like the work we’ve done at the Ohio State University) to successfully deliver their work. This evolution was further reiterated in the conference’s opening remarks with comments about “avoiding the BIM hangover” and “making sure we strive to have BIM done right – just requiring it is not enough. Not only did these statements reflect our need to advance BIM in the AECO community, but they also challenge us to continuously improve while generating results that evolve our processes and focus on creating high-performance projects. This is an exciting opportunity to raise the bar for BIM.

While “BIM, in and of itself, is not the end but rather the means to a number of potentially valuable project delivery outcomes for the Owner” it’s important for all project participants to “think inside other people’s boxes” to better understand how our work can provide value and identify project delivery needs from the outset. Here are three examples of how we can grow stronger in this effort.

 

Define process flow and data needs early

As most owners have multiple systems that share (duplicate) data supporting various tasks, it is critically important we define the process flow and data needs from the outset as the integration of BIM post-occupancy is not about technology, it’s all about the process. Confirming this approach, other presenters at BIMForum spoke about the need to focus on not only what BIM can do, but what value BIM can provide businesses. This idea of “task over technology” allows owners to focus on the delivery of an as-maintained model that can serve as the connective tissue between design-build and facilities management for the lifecycle of the building.

This connective tissue will need to be carefully strategized and defined, as only good geometry and data can generate reliable information to serve as the basis for a useful decision-making process. This is ultimately the basis for the transition of BIM to owners, which comes with the understanding that incomplete or delayed information risks the perceived integrity of the entire system.

 

 

Seek out collaboration

Defining a transition to facility lifecycle management also requires collaboration with industry partners for sharing ideas, risk, goals, successes and failures. We need to be better at acknowledging the business case (it is a business and people must make money to stay in business) and understanding what can be shared and what cannot. Russ Manning of Penn State presented on this idea during the conference and he shared that “making money may not be making money the same way you did in the past. It may be making money by delivering what owners actually need more efficiently.” This was a powerful thought that resonated with the audience. Russ then left everyone with his believe that “owners shouldn’t pay more for BIM, but they should pay differently.

 

Transform your project deliverables

Renée Tietjen from the U.S. Department of Veterans Affairs shared very actionable ideas regarding the development of our project deliverables the AEC community should embrace. Renée challenged us to collaborate and evolve our project delivery processes to not simply design for bidding, but design for construction. She also commented that the VA is working to establish the Design-Intent BIM as the AEs primary design deliverable, which will take precedent over two-dimensional drawings. In addition, she also shared that the non-editable Federated Design-Intent Model (.NWD or equal format) will be the instrument of the contract used for the construction award. These statements were extremely well received by the audience, including myself, and became a talking point throughout the conference.

While these goals are a huge step forward in the industry and the VA’s leadership is greatly appreciated, we as a design and construction community have to hold up our end of these statements. With owners defining BIM project deliverables, simply turning over a model will not be enough value. The next step evolving BIM for the design and construction industry is to strengthen the quality and integrity of BIM deliverables. While not all BIMs are created equal, they can be a “hot mess” or the “devil in disguise” as Cindy Baldwin of VDCO Tech stated during her presentation. The need to improve, measure and control deliverables are key to any project’s success, and the owner’s lifecycle strategy is an area the AEC community will need to address.

Achieving “BIM done right” and looking to provide reliable information for our clients to support their facility lifecycle management strategy is an exciting next step in the evolution of our industry. These ideas and conversations are well matched with many initiatives and goals within CannonDesign’s Virtual Design & Construction team that will ensure we don’t fall into any “BIM hangover” while enabling us to provide a greater partnership and more value to our clients in the achievement of high-performance projects.

More from Author

CannonDesign | Oct 19, 2020

Flexible design helped the University of Kansas Strawberry Hill Behavioral Health Hospital adapt to the coronavirus

The University of Kansas Strawberry Hill Behavioral Health Hospital had been open for just over six months when it was faced with the global coronavirus pandemic.

CannonDesign | Sep 2, 2020

The online learning lab: Investing in resources to improve hybrid learning models

Over the summer, many institutions transformed to adapt the in-person experience and bring campus populations back to campus for the fall. This has been an enormous undertaking.

CannonDesign | Jun 9, 2020

CannonDesign unveils COVID Shield

As the world evolves its response to the COVID-19 pandemic, one clear reality is testing for the virus will be part of our daily lives for the foreseeable future.

CannonDesign | May 6, 2020

5 valuable questions building engineers will be asking after COVID-19

What will be the new normal in the post-COVID-19 world and to what extent will the way we interact with the built environment change?

CannonDesign | Apr 3, 2020

Test facility in a box: Modular, walk-in booth design for coronavirus testing

To address the need for testing in urban areas for those without vehicles, CannonDesign architect Albert Rhee created a walk-in testing booth that is slated for public use.

CannonDesign | Apr 1, 2020

Three reasons you should keep sewing face masks (as long as you follow simple best practices)

Here are three reasons to encourage sewists coast to coast to keep their foot on the pedal.

CannonDesign | Mar 25, 2020

Designing public health laboratories to safeguard researchers during pandemics

As laboratory designers, we want to shed light on a subset of our population critical to protecting us from, and preventing the spread of, severe outbreaks: public health researchers.

CannonDesign | Mar 16, 2020

Effective remote workforce: Key steps and strategies for success

As the potential scope of the COVID-19 outbreak has become more clear in the United States and Canada, public and private organizations from all industries, sectors and geographies are encouraging their teams to work remotely to reduce the spread of the virus.

CannonDesign | Mar 11, 2020

A look at how U.S. hospitals are designed to battle infectious diseases like coronavirus

Some health systems can use telehealth and video visits to asses and triage patients before they arrive at a hospital. 

CannonDesign | Feb 11, 2020

Tailored Environment of CHOC Thompson Autism Center comes from designer's firsthand experience

It will be one of a few clinics fully dedicated to patients with autism.

boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

 


Magazine Subscription
Subscribe

Get our Newsletters

Each day, our editors assemble the latest breaking industry news, hottest trends, and most relevant research, delivered to your inbox.

Subscribe

Follow BD+C: