flexiblefullpage -
billboard - default
interstitial1 - interstitial
Currently Reading

Better design with a “brain break”

Better design with a “brain break”

During the design process, there aren’t necessarily opportunities to implement “brain breaks,” brief moments to take a purposeful pause from the task at hand and refocus before returning to work.


By Scott Mueller, AIA, ACHA and Cathleen Lange, AIA, supported by Jennifer Aliber, FAIA, FACHA, Katie Chambers, AIA, John Malnati, AIA, Kira Rosenbaum, AIA and Andre P. Kamili, AIA | Shepley Bulfinch | July 26, 2022
Design Process
Courtesy Pexels.

During the design process, there aren’t necessarily opportunities to implement “brain breaks,” brief moments to take a purposeful pause from the task at hand and refocus before returning to work. We are typically required to swiftly understand our clients’ goals and bring design to life on a timely schedule. In March 2020, that changed as our healthcare projects hit pause while the industry adapted to unprecedented quantities of infectious patients and examined how to alter their space for accommodations. With over one billion dollars in projects at Yale New Haven Health’s (YNHH) Saint Raphael Campus (SRC) halted, YNHH asked Shepley Bulfinch to complete a study highlighting lessons learned from the unexpected break. The outcome taught us all how we could improve facility design and planning outcomes and strengthen the safety of the caregiving environment. 

For the study, YNHH asked Shepley Bulfinch, to discuss and document how lessons learned during the pandemic could change the design of  three projects—a neuro-focused bed tower, an Emergency Department expansion and renovation, and a Heart and Vascular Center and Radiology and Biomedical Imaging expansion and renovation—for the better. The goal was to examine critical questions that emerged: Were the three projects in design resilient enough to adapt to unpredictable situations? How could we apply lessons learned during the pandemic to build better spaces? Are we making the right decisions for the campus?

Throughout the study, Shepley Bulfinch and YNHH reviewed pandemic experiences to inform design ideas and connected with subject matter experts to better understand potential future crises and patient types. The team then sought to understand the likelihood of each scenario and took a measured approach to recommendations. Discussions were organized into seven Task Groups, including YNHH participants as well as representatives from BR+A Consulting Engineers, Turner Construction Company, and Shepley Bulfinch. 

Workshop notes
Workshop notes. Courtesy Shepley Bulfinch.

Key recommendations that emerged through intense collaboration with Task Groups and experts included: 

  • Utilize improved room standardization to create more flexibility in bed units. Creating adaptable spaces allows a med-surg room to be quickly transformed into an ICU, or a conference center to be used for triage. 
  • Optimize infrastructure capabilities to quickly adapt to “pandemic mode” needs. This can include quantity and placement of an Airborne Infectious Isolation (AII) Rooms in patient units, Prep/Recovery areas and in the ED. Adjusting key department locations to better serve patients, such as moving outpatient services out of the hospital can improve the sense of comfort for outpatients and add capacity to the acute care environment.

Design is, and must be, very schedule focused for success, so how can we build opportunities for “brain breaks” without major disruptions to the schedule? The duration of the brain break depends on the project and the client: it doesn’t need to last nine months, but a week- or day-long workshop, or parallel track peer review could provide unmatched benefits. Because of this “brain break,” future projects at YNHH’s SRC will be armed with resilient design and better prepared to face the unknown. It’s our job to highlight the value these breaks provide and work with our clients to understand how these moments can be integrated into the project approach. To ensure we provide efficient recommendations, our team is constantly researching articles, trends, and talking to in-house experts with decades of healthcare experience.

Proposed Anteroom Solutions
Proposed Anteroom Solutions. Courtesy Shepley Bulfinch.

Our pandemic study succeeded due to the commitment from each member of the project team to build a stronger project. It taught us the value of taking a pause to reflect on our work to ensure that the projects we deliver for our clients are thoroughly vetted and optimized for the patients and staff that they serve.  Our design team reached these recommendations, among others, through collaboration with the client, our consultants, and subject-matter experts. Approaching design for the unknown is no different than how we have been approaching the pandemic: working together to provide quality and safe care.

SRC Campus
Rendering, Yale New Haven Health | Saint Raphael Campus. Courtesy Shepley Bulfinch.

 

More from Author

Shepley Bulfinch | Aug 8, 2022

The technology balancing act

As our world reopens from COVID isolation, we are entering back into undefined territory – a form of hybrid existence.

Shepley Bulfinch | Jul 11, 2022

Student life design impacts campus wellness

As interior designers, we have the opportunity and responsibility to help students achieve deeper levels of engagement in their learning, social involvement, and personal growth on college campuses.

Shepley Bulfinch | Jun 8, 2022

Welcome to the hybrid library

Libraries have grown to become the intellectual and social hubs of campus, where, prior to March 2020, students, researchers, and faculty gathered to collaborate and connect.

Shepley Bulfinch | Jul 14, 2020

Is there a way to test for Covid-19 without PPE?

We developed a unique design concept: a testing booth that allows healthcare workers to administer tests without using PPE or being exposed.

Shepley Bulfinch | Aug 3, 2017

Today’s university lab building by the numbers

A three-month study of science facilities conducted by Shepley Bulfinch reveals key findings related to space allocation, size, and cost. 

boombox1 - default
boombox2 -
native1 -

More In Category


Warehouses

Construction completed on Canada’s first multi-story distribution center

Construction was recently completed on Canada’s first major multi-story industrial project, a distribution center in Burnaby, British Columbia. The project provides infrastructure for last-mile delivery in a world where consumers have come to expect next-day and same-day delivery, according to Ware Malcomb, the project's architect of record.


Healthcare Facilities

UC Davis Health opens new eye institute building for eye care, research, and training

UC Davis Health recently marked the opening of the new Ernest E. Tschannen Eye Institute Building and the expansion of the Ambulatory Care Center (ACC). Located in Sacramento, Calif., the Eye Center provides eye care, vision research, and training for specialists and investigators. With the new building, the Eye Center’s vision scientists can increase capacity for clinical trials by 50%.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

 



Magazine Subscription
Subscribe

Get our Newsletters

Each day, our editors assemble the latest breaking industry news, hottest trends, and most relevant research, delivered to your inbox.

Subscribe

Follow BD+C: