6 lessons in campus planning

For campus planning, focus typically falls on repairing the bricks and mortar without consideration of program priorities. Gensler's Pamela Delphenich offers helpful tips and advice.

September 21, 2015 |
GenslerOn
6 lessons in campus planning

Photo:  David Nicholas/Creative Commons (via GenslerOn)

Campus planning is a complicated business. Although experts have developed methodologies to organize and set priorities, the focus typically falls on repairing the bricks and mortar, without consideration of current or future program priorities. So as campuses across the world bustle with back to school activity this fall, I offer these insights for improving campus planning.

Lesson One: You need to get the lay of the land.

Dwight Eisenhower once said, “Whenever I run into a problem I can’t solve, I always make it bigger. I can never solve it by trying to make it smaller, but if I make it big enough, I can begin to see the outline of a solution.”

No matter how long you have been at an institution, there are things that you don’t know. Start with a campus-wide building condition assessment and set priorities with an analysis of:

  • Physical condition
  • Architectural or historic significance
  • Adaptability for repurposing
  • Site redevelopment opportunity
  • Current space utilization

Combine this physical analysis with a campus-wide, long-term programmatic overview.

Lesson Two: Be broadly consultative. No top down here!

Space is a campus-wide need. Optimal results follow broad consultation with administrative, academic and student life leadership. Optimizing programmatic synergy and adjacency requires a deep understanding of higher education and the ability to ask the right question to the right people. Only then can you understand their priorities and how their long-term vision intersects with the realities of the institution’s academic real estate portfolio.

Work with the team of academic stakeholders to compare your campus’ inventory of academic space against the faculty’s approach. Analysis of your classroom and lab usage might reveal underuse of inflexible teaching and research spaces that don’t support the faculty’s current and anticipated pedagogical approach, and oversubscription of flexible spaces that can be reconfigured at a moment’s notice.

Lesson Three: Flexibility is critical to the success of the plan.

As important as a comprehensive plan is to your work, understand that it will change over time as priorities shift. Set a flexible planning framework that acknowledges program and physical priorities. As priorities will change depending on your institution’s strategic and academic goals (and even a changing of the guard), be prepared to adjust the capital plan every year. A wise strategic planner once noted, “A strategic plan should be written in pencil and the pencil needs an eraser.”

 

Yale's Sterling Memorial Library. Photo: Sage Ross/Wikimedia Commons

 

Lesson Four: Be prepared for road blocks and surprises.

Your comprehensive framework will help you understand the road ahead and break it into manageable pieces. Changing priorities (and budgets) might require you to move projects around, and sometimes even cut a program short. As you plan projects, break them into self-contained modules, each of which will result in qualitative improvement. This way, if subsequent phases are not completed, your interim accomplishments will still be worth the efforts and investment.

Yale’s Sterling Memorial Library master plan revealed the need for a $100M investment-in 1992. With life safety and preservation of the collection identified as the highest priorities, this project became the first phase of a multi-year plan. After a debt-funded $35M project, the University was able to proceed at a more leisurely pace to design and raise money for subsequent phases. The entire project was implemented over 20 years.

This planning process will likely uncover collateral projects. Consider this example: A new chemistry building will be built to accommodate the most utility-intensive research group on campus. The capital budget must address not just the cost of the new building, but also the extension of utilities to the new building (an enabling project) and the renovation of the space “left behind” (a backfill project).

Lesson Five: You may already have the solution.

Thinking of it as a throw-away, it might be tempting to try to avoid the need for temporary space by phasing construction. In the long-run, swing space is typically more cost effective than phasing or working in an occupied building, even in leased space. But where to find available square footage? And how to minimize throw-away?

Perhaps one of the to-be-built projects in your long-term capital plan can be accelerated, used as temporary swing space, and ultimately deployed for its original programming. This solves your short-term problem and can help offset your building costs or enable cost sharing.

Lesson Six: Communicate. Communicate. Communicate.

With stakeholders involved from both academic and administrative departments, communication will be key. As anyone in communications will tell you, “People don’t read,” so be sure that your communications strategy extends beyond periodic email updates.

The most successful projects are ones in which you communicate what you plan to do and, even more importantly, what you plan not to do. It’s the best way to manage expectations…and minimize disappointment.

As you sharpen your pencils this fall and learn your own lessons, please share them with me.      

About the Author: Pamela Delphenich, FAIA, leads the Education practice area in the Boston office. Before rejoining Gensler after a gap of more than 25 years, she directed campus planning for the Massachusetts Institute of Technology, where she spearheaded MIT 2030, establishing a 20-year vision for campus renewal and growth. Previously, she oversaw all physical design and development at Yale University, and directed Yale’s Framework for Campus Planning which established a roadmap for Yale’s comprehensive renewal program. Contact her at pamela_delphenich@gensler.com.

GenslerOn | Gensler

Published by Gensler, a global design firm with 5,000 practitioners networked across five continents, GenslerOn features insights and opinions of architects and designers on how design innovation makes cities more livable, work smarter, and leisure more engaging. Our contributors write about projects of every scale, from refreshing a retailer’s brand to planning a new urban district, all the while explaining how great design can optimize business performance and human potential. For more blog posts, visit: http://www.gensleron.com.

Related Blogs

Comcast Studio Xfinity

For Comcast Studio Xfinity's new flagship in Washington, D.C., Gensler created an engaging experiential brand program that informed the store's interior design and created a warm, social, and inviting environment. Image © Chris Leonard.

September 17, 2018 | Retail Centers | GenslerRyan Cavanaugh

One way to solve for the future is to disrupt the expected.

August 27, 2018 | Office Building Design | GenslerJanet Pogue McLaurin

The degree of open or enclosed doesn't matter in high-performing work environments. If the space is designe...

The CSU Northridge Sustainability + Recycling Center

The CSU Northridge Sustainability + Recycling Center includes a rooftop photovoltaic system, which offsets the energy required to support the building's administrative functions. Glazed, north-facing overhead windows bring in natural light that enhances the work environment for staff and creates a daylight autonomous environment. The design eliminates the need for artificial light in the building during daylight hours. Ryan Gobuty, Image © Gensler.

August 06, 2018 | Energy | GenslerAnthony Brower

The architecture, engineering, and construction industry will have to make major adjustments in the years a...

A day in the life of an ‘agile worker’

A mix of sit-stand stations and collaboration areas support agile working. Image © Gensler/John Ryan.

July 18, 2018 | Office Building Design | GenslerJane Stull

When our Gensler La Crosse office relocated last year, we leveraged the opportunity to support an agile wor...

teachers in a coLab
June 25, 2018 | Education Facility | GenslerSantiago Rivera

Known as the Teacher coLab, the rejuvenated space takes inspiration from academic incubators in higher educ...

May 25, 2018 | Green | GenslerAlicia Gomez Jimenez

The healthcare community is looking at adopting integrated care systems in which outdoor healing and therap...

Image: Gensler

May 03, 2018 | Architects | GenslerAudrey Handelman

What’s stopping us from creating more Permanent Supportive Housing? 

The shared amenity space at the Tata Innovation Center at Cornell Tech

The shared amenity space at the Tata Innovation Center at Cornell Tech. Image © Max Touhey

April 19, 2018 | Office Building Design | GenslerTom Vecchione And Erin Saven

Here are five ways that amenities can help developers and building owners attract and secure tenants by app...

March 28, 2018 | Healthcare Facilities | GenslerAhmed Zaman

Sound can also be healing. It promotes a culture of quietness and enhances environments, not just for patie...

March 26, 2018 | Architects | GenslerLorraine Morgan, CID, NCIDQ and Evgeniya Chadovich

The City of San Diego is home to the fourth largest homeless population in the U.S.

Overlay Init