flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Acoustical ceiling clouds soar above GE Customer Experience Center

Sponsored Content Ceilings

Acoustical ceiling clouds soar above GE Customer Experience Center

They provide dynamic aesthetic along with desired sound absorption


By Armstrong Ceiling & Wall Solutions | May 14, 2018

Formations acoustical ceiling clouds from Armstrong Ceiling Solutions provide a dynamic aesthetic along with desired sound absorption at the GE Customer Experience Center (CEC).

The Customer Experience Center (CEC) at the GE Advanced Manufacturing Works in Greenville, SC not only showcases the history, progression, and manufacturing advancements of the GE brand, but also hosts a multitude of corporate events. As a result, the design team at MCA Architecture in Greenville looked to create a multi-functional open space that was both dynamic and energetic.

To meet the design intention, the team selected Formations acoustical clouds from Armstrong® Ceiling Solutions. Available in 19 shapes and sizes, Formations cloud systems consist of 2’x 2’ ceiling panels with factory-finished, pre-cut corners, and a kit containing all the pre-cut-to-length, ready-to-assemble suspension system and perimeter trim components required to create the cloud.

The kits include StrongBack carrying channel which eliminates 40% of the cables, minimizing visible hangar wires. As a result, kits assemble and install up to 50% faster than stick-built clouds.  In total, 53 circular clouds ranging in diameter from 6 feet to 14 feet were installed in the CEC.

 

In total, 53 Formations circular acoustical ceiling clouds ranging in diameter from 6 feet to 14 feet were installed in the CEC.

 

Met Design, Schedule, Budget Requirements

According to project architect, Michael Kissam, the Formations ceiling system was selected for several reasons. “First,” he says, “we were looking for a ceiling treatment that was not static or overbearing but evoked a sense of movement, dynamism, and progression. 

“Second, we were under an extremely aggressive schedule that had to be completed in nine months from design start to customer occupancy. The Formations cloud kits provided a unique advantage because the clouds could be fabricated on ground level and raised to their finish elevations at the last possible moment. This installation sequence allowed for the necessary overhead utility work to be completed while mitigating the ceiling grid and tile damage that is a reoccurring problem for typical project close-outs.

“Last, we needed a cost effective ceiling system that could meet the design intent, construction schedule, and budget,” he adds. “The Formations cloud kits delivered on all fronts.”

 

Aesthetics, Acoustics Key Considerations

Kissam notes that the project aesthetic was an important consideration as well because the space is a showcase for GE and its worldwide customers. “The finished product and function of the Formations acoustical clouds exceeded our design intention and, more importantly, the customer’s expectations,” he states.

He also reports that because the CEC is designed to accommodate a variety of different functions, the acoustics of the space had to be multifarious. “The majority of the surfaces are glass walls and ceramic tile flooring, so the ceiling system was our only opportunity to control the acoustics,” he explains.  “By layering and overlapping the clouds, the ceiling system created a baffling effect that proved to be highly effective.”

 

For additional information on Armstrong Formations Acoustical Clouds, visit armstrongceilings.com/formations.

Related Stories

| Aug 23, 2011

Acoustical design education model

Pass this exam and earn 1.0 AIA/CES Discovery learning units. You must go to www.BDCnetwork.com/EnhancedAcousticalDesign to take this exam.

| Aug 19, 2011

Enhanced acoustical design

Ambient noise levels in some facility types are trending up and becoming a barrier to clear communication between building occupants.

| Jun 1, 2011

Low-energy fans help combat disease in Rwandan clinic

Isis fans from Big Ass Fan Co. help kill airborne pathogens in Rwanda’s Butaro Health Clinic by passing air over UV lights.

| Nov 3, 2010

Sailing center sets course for energy efficiency, sustainability

The Milwaukee (Wis.) Community Sailing Center’s new facility on Lake Michigan counts a geothermal heating and cooling system among its sustainable features. The facility was designed for the nonprofit instructional sailing organization with energy efficiency and low operating costs in mind.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 12, 2010

Gartner Auditorium, Cleveland Museum of Art

27th Annual Reconstruction Awards—Silver Award. Gartner Auditorium was originally designed by Marcel Breuer and completed, in 1971, as part of his Education Wing at the Cleveland Museum of Art. Despite that lofty provenance, the Gartner was never a perfect music venue.

| Aug 11, 2010

New data shows low construction prices may soon be coming to an end

New federal data released recently shows sharp increases in the prices of key construction materials like diesel, copper and brass mill shapes likely foreshadow future increases in construction costs, the Associated General Contractors of America said. The new November producer price index (PPI) report from the Bureau of Labor Statistics provide the strongest indication yet that construction prices are heading up, the association noted.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021