A $52 million expansion of FirstLight Health System, in Mora, Minn., was completed this month by Kraus-Anderson Construction, one of the industry’s leading GCs in the healthcare sector. This multi-phased project, which took 25 months, expanded and renovated about 115,000 sf of the System’s Mora Hospital and Clinic campus, about 75 miles from Minneapolis, that was built in 1943 and had been added to five other times previously.
The renovation, designed by DSGW Architects, features a new main entry and commons for waiting and registration, eye clinic, lab, new infusion/chemotherapy and radiology spaces, IT, offices, and a giftshop.
A two-story addition includes a new rehab space with therapy pool, food service kitchen, cafeteria, and inpatient pharmacy. The addition also has new units for births, medical surgeries and ICU, and new barometric and transformative rooms.
Another two-story addition has a new emergency department, community pharmacy, ambulance garage and fitness center. And a separate one-story addition includes clinical exam rooms.
The project delivered new parking areas and courtyard, a relocation of the facility’s helipad, and improved campus access from Minnesota Highway 65.
The M/E engineer on this project was Obermiller Nelson Engineering, based in Fargo, N.D. Duluth, Minn.-based Northern Consulting Engineers was the SE, and Wenck of Maple Plain, Minn., was the CE.
Related Stories
| Aug 11, 2010
Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report
A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
RSMeans/RCD forecast 14% drop in hospital construction for 2009
RSMeans forecasts a 14% drop in hospital construction in 2009 compared to 2008, with $17.1 billion in registered hospital projects as of June 30, 2009. The Reed Construction Data unit finds renovation of healthcare facilities increasing, from 36% of projects in 2008, to 40% of projects in the pipeline in the first six months of 2009.
| Aug 11, 2010
ASHRAE introduces building energy label prototype
Most of us know the fuel efficiency of our cars, but what about our buildings? ASHRAE is working to change that, moving one step closer today to introducing its building energy labeling program with release of a prototype label at its 2009 Annual Conference in Louisville, Ky.
| Aug 11, 2010
10 tips for mitigating influenza in buildings
Adopting simple, common-sense measures and proper maintenance protocols can help mitigate the spread of influenza in buildings. In addition, there are system upgrades that can be performed to further mitigate risks. Trane Commercial Systems offers 10 tips to consider during the cold and flu season.
| Aug 11, 2010
McCarthy, Skanska among nation's largest healthcare contractors, according to BD+C's Giants 300 report
A ranking of the Top 50 Healthcare Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
AECOM, Arup, Gensler most active in commercial building design, according to BD+C's Giants 300 report
A ranking of the Top 100 Commercial Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Payette completes Penn State Hershey Cancer Institute
Payette, a leading architectural design firm specializing in complex buildings for medical and scientific research, academic teaching, and healthcare, announced today the Penn State Hershey Cancer Institute ribbon-cutting and dedication ceremony was held on June 26, 2009. The new 176,000 square foot Cancer Institute is located on the Penn State Milton S. Hershey Medical Center Campus in University Park, Pa.