A $52 million expansion of FirstLight Health System, in Mora, Minn., was completed this month by Kraus-Anderson Construction, one of the industry’s leading GCs in the healthcare sector. This multi-phased project, which took 25 months, expanded and renovated about 115,000 sf of the System’s Mora Hospital and Clinic campus, about 75 miles from Minneapolis, that was built in 1943 and had been added to five other times previously.
The renovation, designed by DSGW Architects, features a new main entry and commons for waiting and registration, eye clinic, lab, new infusion/chemotherapy and radiology spaces, IT, offices, and a giftshop.
A two-story addition includes a new rehab space with therapy pool, food service kitchen, cafeteria, and inpatient pharmacy. The addition also has new units for births, medical surgeries and ICU, and new barometric and transformative rooms.
Another two-story addition has a new emergency department, community pharmacy, ambulance garage and fitness center. And a separate one-story addition includes clinical exam rooms.
The project delivered new parking areas and courtyard, a relocation of the facility’s helipad, and improved campus access from Minnesota Highway 65.
The M/E engineer on this project was Obermiller Nelson Engineering, based in Fargo, N.D. Duluth, Minn.-based Northern Consulting Engineers was the SE, and Wenck of Maple Plain, Minn., was the CE.
Related Stories
Healthcare Facilities | May 19, 2023
A new behavioral health facility in California targets net zero energy
Shortly before Mental Health Awareness Month in May, development and construction firm Skanska announced the topping out of California’s first behavioral health facility—and the largest in the nation—to target net zero energy. Located in Redwood City, San Mateo County, Calif., the 77,610-sf Cordilleras Health System Replacement Project is slated for completion in late 2024.
3D Printing | May 12, 2023
World’s first 3D-printed medical center completed
3D construction printing reached new heights this week as the world’s first 3D-printed medical center was completed in Thailand.
Sustainability | May 11, 2023
Let's build toward a circular economy
Eric Corey Freed, Director of Sustainability, CannonDesign, discusses the values of well-designed, regenerative buildings.
Digital Twin | May 8, 2023
What AEC professionals should know about digital twins
A growing number of AEC firms and building owners are finding value in implementing digital twins to unify design, construction, and operational data.
Design Innovation Report | Apr 27, 2023
BD+C's 2023 Design Innovation Report
Building Design+Construction’s Design Innovation Report presents projects, spaces, and initiatives—and the AEC professionals behind them—that push the boundaries of building design. This year, we feature four novel projects and one building science innovation.
Sustainability | Apr 20, 2023
13 trends, technologies, and strategies to expect in 2023
Biophilic design, microgrids, and decarbonization—these are three of the trends, technologies, and strategies IMEG’s market and service leaders believe are poised to have a growing impact on the built environment.
Design Innovation Report | Apr 19, 2023
HDR uses artificial intelligence tools to help design a vital health clinic in India
Architects from HDR worked pro bono with iKure, a technology-centric healthcare provider, to build a healthcare clinic in rural India.
Healthcare Facilities | Apr 17, 2023
UC Irvine takes sustainability to new level with all-electric medical center
The University of California at Irvine (UCI) has a track record for sustainability. Its under-construction UCI Medical Center is designed, positioned, and built to preserve the nearby San Joaquin Marsh Reserve, to reduce the facility’s solar gain by 85%, and to be the first medical center in the country to operate on an all-electric central plant.
Healthcare Facilities | Apr 13, 2023
Healthcare construction costs for 2023
Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.
Healthcare Facilities | Apr 13, 2023
Urgent care facilities: Intentional design for mental and behavioral healthcare
The emergency department (ED) is the de-facto front door for behavior health crises, and yet these departments are understaffed, overwhelmed, and ill-equipped to navigate the layered complexities of highly demanding physical and behavioral health needs.