flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$75 million commercial tower and hotel proposed in downtown Atlanta

Hotel Facilities

$75 million commercial tower and hotel proposed in downtown Atlanta

The tower would be built on a site currently occupied by a Hertz Car Rental and parking lot.


By David Malone, Associate Editor | September 26, 2016

Rendering courtesy of Lee & Associates via Curbed Atlanta

A 25-story commercial tower, with the current moniker of International Plaza, has been proposed for downtown Atlanta at the 202 Courtland Street location. Currently, a Hertz Car Rental and surface parking occupies the site.

The new building would help to breakup a corridor of downtown Atlanta that is stippled with parking lots, Curbed Atlanta reports. The tower’s modern architecture and design elements will help the building stand out in what is a somewhat bland section of downtown Atlanta.

The $75 million development, which is being developed privately, is in the most preliminary stages of development, but is already pre-leasing, three full years before the projected opening in 2019. Lee & Associates is in charge of leasing the project.

The tower would include a dual-branded hotel, a Skybar rooftop lounge, restaurants, a health club, retailers, and a coffee shop, according to What Now Atlanta. A loopnet.com listing says the building will offer three levels of commercial space across the 50,000-sf building with walk up street retail with valet parking, an integrated parking deck, and a location that will attract sports, convention, hotel, student, and government business.

As of writing this article, no information about specific tenants is available, however, Lee & Associates claims to already be in talks with a few major brands.

Related Stories

Hotel Facilities | Oct 28, 2021

At the end of Q3 2021, Dallas tops the U.S. hotel construction pipeline

The top 25 U.S. markets account for 33% of all pipeline projects and 37% of all rooms in the U.S. hotel construction pipeline.

Hotel Facilities | Oct 13, 2021

World’s first net zero carbon hotel launches in West London

The hotel is located in Chiswick, West London.

Hotel Facilities | Oct 12, 2021

510-room Hyatt Place Hotel completes in Chelsea

The project broke ground in January 2019.

Hotel Facilities | Sep 27, 2021

New resort will be carved directly into a mountainside

The project is is located in western Saudi Arabia.

Hotel Facilities | Sep 22, 2021

Will hotel developers finally embrace modular construction?

Last May, MiTek, a construction software and building services company that’s part of Warren Buffett’s Berkshire Hathaway conglomerate, formed a partnership with Danny Forster & Architecture to promote modular design and construction.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Hotel Facilities | Aug 26, 2021

Building hotels with modules, with citizenM's Menno Hilberts

In this exclusive interview for HorizonTV, Menno Hilberts, Managing Director of Project Management with hotelier citizenM, explains how the company is employing modular construction to help double its presence in the U.S. 

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Hotel Facilities | Aug 16, 2021

7 Cedars Hotel completes on Washington’s Olympic Peninsula

Rice Fergus Miller Architecture designed the project.

Hotel Facilities | Aug 11, 2021

Jasper Architects wins design competition for hotel in Kuwait

The project is inspired by Kuwait’s desert landscape.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021