Abandoned and derelict for more than three decades, St. Paul, Minn.’s Woolworth’s Building has been revived as a modern office and co-working space in the city’s Lowertown district. The 428 is St. Paul’s first speculative office development in a half-decade, and is designed to attract tech and marketing companies with wellness-focused, amenity-rich spaces.
Though structurally sound, the 70-year-old five-and-dime store had other problems. The HVAC systems needed to be completely replaced. The second floor had no windows. The roof was compromised. The canopy on the south and west façades was disintegrating.
In lieu of a simple facelift, the project team proposed a bold three-part strategy to completely reposition the dated building without exceeding the budget:
• The slice: The exterior brick on the south and west façades was replaced with glass curtain wall to maximize views to the outdoors and allow sunlight to enter deep into the tenant spaces in the building’s core.
• The bookends: Two new corner elements frame new exterior curtain walls and serve as the circulation cores. They illustrate the flow of movement through the spaces before entering the building and create a design transition between the new modern façade and the classical revival style of its neighbor, the Golden Rule Building.
• The cube: A 6,000-sf glass cube on the fifth-floor rooftop distinguishes this office building from its neighbors. It houses co-working space, called Wellworth, and is flanked by patio spaces to the north and south. All tenants can use these patios to take work outside, or lease additional seats from Wellworth to round out tenant spaces below.
A rooftop patio encourages tenants to get out of their offices and into the fresh air. The 428 earned WELL Gold honors from the International Well Building Institute.
The 428 was designed to encourage physical activity of the occupants. The original south stairwell was moved from behind a closed door to the new lobby space, and was articulated with colored precast concrete treads and earth-themed graphic elements—all to entice tenants to take the stairs rather than the elevators. The rooftop patio draws people out of their offices to get some fresh air, and on-site bicycle storage and showers encourage active transit.
These features—along with filtered water at fountains, kitchenettes, and showers, MERV 16 air filters, healthy snacks in vending machines, and daylight-rich interiors—helped the project earn WELL Gold certification from the International Well Building Institute.
As one Reconstruction Awards judge stated: “The team did a good job of revitalizing a desolate corner of town into a new workplace. This is a nice contribution to downtown St. Paul.”
BRONZE AWARD WINNER
BUILDING TEAM HDR (submitting firm, architect, interior architect) HFS Properties (owner) Commercial Real Estate Services (developer) Paulson & Clark Engineering (SE) Master Mechanical (ME) Ace Electrical (EE) Solution Blue (CE) McGough (GC) KimbleCo (redevelopment consultant) DETAILS 63,000 sf Total cost $17 million Construction time July 2017 to September 2018 Delivery method Design-bid-build
Related Stories
Reconstruction Awards | Dec 1, 2017
Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub
In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.
Reconstruction Awards | Dec 1, 2017
Gothic revival: The nation’s first residential college is meticulously restored
This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.
Reconstruction Awards | Dec 1, 2017
Rockefeller remake: Iconic New York tower is modernized for its next life
To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.
Reconstruction Awards | Nov 30, 2017
BD+C's 2017 Reconstruction Award Winners
Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.
Reconstruction Awards | Nov 29, 2017
College credit: Historic rehab saves 50% on energy costs
The project team conducted surveys of students, faculty, and staff to get their input.
Reconstruction Awards | Nov 29, 2017
Amazing grace: Renovation turns a church into elegant condos
The windows became The Sanctuary’s chief sales edge.
Reconstruction Awards | Nov 28, 2017
Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan
The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.
Reconstruction Awards | Nov 27, 2017
Higher education: The rebirth of a Washington, D.C., high school
The project team, led by architect Perkins Eastman, restored the original cupola.
Reconstruction Awards | Nov 27, 2017
Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer
The project team had to fix poor renovations made in the ’50s.
Reconstruction Awards | Nov 27, 2017
Patient friendly: The University of Chicago Medicine Center for Care and Discovery adds 203 new beds
Strict infection control and life safety measures were implemented to protect patients on other floors as work proceeded.