flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The 428: St. Paul's office corner

Reconstruction Awards

The 428: St. Paul's office corner

A long-forgotten five-and-dime store becomes a  speculative office property in Minnesota’s capital.


By David Barista, Editorial Director | December 5, 2019
Brick on the south and west elevations was replaced with glazing to bring in sunlight

Brick on the south and west elevations was replaced with glazing to bring in sunlight.

Abandoned and derelict for more than three decades, St. Paul, Minn.’s Woolworth’s Building has been revived as a modern office and co-working space in the city’s Lowertown district. The 428 is St. Paul’s first speculative office development in a half-decade, and is designed to attract tech and marketing companies with wellness-focused, amenity-rich spaces.

Though structurally sound, the 70-year-old five-and-dime store had other problems. The HVAC systems needed to be completely replaced. The second floor had no windows. The roof was compromised. The canopy on the south and west façades was disintegrating.

In lieu of a simple facelift, the project team proposed a bold three-part strategy to completely reposition the dated building without exceeding the budget:

The slice: The exterior brick on the south and west façades was replaced with glass curtain wall to maximize views to the outdoors and allow sunlight to enter deep into the tenant spaces in the building’s core.

The bookends: Two new corner elements frame new exterior curtain walls and serve as the circulation cores. They illustrate the flow of movement through the spaces before entering the building and create a design transition between the new modern façade and the classical revival style of its neighbor, the Golden Rule Building.

The cube: A 6,000-sf glass cube on the fifth-floor rooftop distinguishes this office building from its neighbors. It houses co-working space, called Wellworth, and is flanked by patio spaces to the north and south. All tenants can use these patios to take work outside, or lease additional seats from Wellworth to round out tenant spaces below.

 

A rooftop patio encourages tenants to get out of their officesA rooftop patio encourages tenants to get out of their offices and into the fresh air. The 428 earned WELL Gold honors from the International Well Building Institute.

 

The 428 was designed to encourage physical activity of the occupants. The original south stairwell was moved from behind a closed door to the new lobby space, and was articulated with colored precast concrete treads and earth-themed graphic elements—all to entice tenants to take the stairs rather than the elevators. The rooftop patio draws people out of their offices to get some fresh air, and on-site bicycle storage and showers encourage active transit.

These features—along with filtered water at fountains, kitchenettes, and showers, MERV 16 air filters, healthy snacks in vending machines, and daylight-rich interiors—helped the project earn WELL Gold certification from the International Well Building Institute.

As one Reconstruction Awards judge stated: “The team did a good job of revitalizing a desolate corner of town into a new workplace. This is a nice contribution to downtown St. Paul.”

 

BRONZE AWARD WINNER

BUILDING TEAM HDR (submitting firm, architect, interior architect) HFS Properties (owner) Commercial Real Estate Services (developer) Paulson & Clark Engineering (SE) Master Mechanical (ME) Ace Electrical (EE) Solution Blue (CE) McGough (GC) KimbleCo (redevelopment consultant) DETAILS 63,000 sf Total cost $17 million Construction time July 2017 to September 2018 Delivery method Design-bid-build

Related Stories

Reconstruction Awards | Dec 19, 2019

BD+C's 2019 Reconstruction Award Winners

The Museum at the Gateway Arch, the Senate of Canada building, and Google, Spruce Goose are just a few of the projects recognized with 2019 Reconstruction Awards.

Reconstruction Awards | Dec 13, 2019

A manse makeover: The Dahod Family Alumni Center at the Castle

A 1915 castle on BU’s campus is carefully restored for alumni events.

Reconstruction Awards | Dec 13, 2019

Community effort: Rose Collaborative

This post-Katrina project has become a citadel of the arts and education in the Crescent City.

Reconstruction Awards | Dec 12, 2019

New flight pattern: Google, Spruce Goose

The hangar that once housed the Spruce Goose is adapted to meet a tech giant’s workplace needs.

Reconstruction Awards | Dec 10, 2019

Enter the world of deep time: David H. Koch Hall of Fossils

The new enclosed FossiLab gives visitors a glimpse into the exacting work of Smithsonian scientists and preservationists.

Reconstruction Awards | Dec 6, 2019

TWA Hotel at JFK International Airport: Home away from home

A dormant, 1960s-era flight center is converted into a snazzy hotel and conference facility.

Reconstruction Awards | Dec 6, 2019

Columbus Metro Library Hilliard Branch

Senior living clubhouse becomes a modern library in central Ohio.

Reconstruction Awards | Dec 4, 2019

The squeeze is on: The Revolution Hotel

Once a 1950s-era YWCA, The Revolution is now a hip new hotel in The Hub.

Reconstruction Awards | Dec 2, 2019

Hudson Commons: Over the top

A project team converts a 1960s industrial structure into a Class A office gem.

Reconstruction Awards | Nov 26, 2019

Sweetest sounds: Metropolitan Opera House

An early 20th-century opera house now hosts concerts from Disney Acapella to Weezer.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021