Modo, the first modular apartment building in Washington, D.C. has begun construction. In a period of only eight days 44 custom designed modular boxes shipped from Pennsylvania were lifted into place by crane to create 16 of Modo’s 17 three-bedroom apartments.
The modules arrived onsite 80% finished. Each three-bedroom Modo apartment features built-in custom closets, shelving, desks meant to facilitate remote working, and a spacious living room with a pre-installed jumbo flat-screen TV.
“We were looking for more efficient and environmentally-friendly alternatives to typical construction types,” said Grant Epstein, President of Community Three, the project’s developer, in a release. “Modular construction can reduce construction time by almost one-third, while generating far less onsite construction waste. Construction components typically exposed to the elements – such as windows and wood framing – are built with higher quality because they are assembled indoors. As a result, these modular units offer superior insulation, weather barriers, sound attenuation, and indoor finishes compared with those constructed traditionally.”
The community is designed to appeal to the twenty-somethings of Generation Z, with enough bedrooms to accommodate multiple roommates. An automated entry system will allow tenants to use a smartphone app to access both the building and their apartments.
In addition to the apartments, a concrete-and-steel podium, under construction since April, will house the building’s lobby and a 3,000-sf street-level retail space that can provide over 100 outdoor cafe seats. The lobby will be furnished with a seating area for relaxing, eating, and remote working. A green roof deck with seating and grilling areas will also be included, along with a single penthouse apartment with a private outdoor terrace that is being built on the roof level.
Urban Pace will begin pre-leasing the apartments in March, 2021. Community Three is partnering with Washington, DC-based Rooney Properties on the project. The team worked with the Modular Mobilization Coalition to select Philadelphia-based VBC Construction as modular contractor. VBC in turn partnered with Scranton, PA-based Simplex Homes as the modular fabricator. The manufacturing team worked closely with DC-based project architect Eric Colbert & Associates to ensure seamless integration of market focus and construction methodology.
Related Stories
| Mar 19, 2012
Mixed-use project redefines Midtown District in Plantation, Fla.
Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC.
| Mar 6, 2012
Country’s first Green House home for veterans completed
Residences at VA Danville to provide community-centered housing for military veterans.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 15, 2012
NAHB sees gradual improvement in multifamily sales for boomers
However, since the conditions of the current overall housing market are limiting their ability to sell their existing homes, this market is not recovering as quickly as might have been expected.
| Feb 10, 2012
Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency
Energy-efficiency program to improve 13 senior residential care facilities and save nearly $18 million.
| Feb 8, 2012
Nauset completes addition and renovation for Winchester senior living community
Theater, library, fitness center, and bistro enhance facility.
| Jan 3, 2012
Rental Renaissance, The Rebirth of the Apartment Market
Across much of the U.S., apartment rents are rising, vacancy rates are falling. In just about every major urban area, new multifamily rental projects and major renovations are coming online. It may be too soon to pronounce the rental market fully recovered, but the trend is promising.
| Dec 27, 2011
Ground broken for adaptive reuse project
Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.
| Dec 12, 2011
Mojo Stumer takes top honors at AIA Long Island Design Awards
Firm's TriBeCa Loft wins "Archi" for interior design.
| Dec 5, 2011
Gables Residential brings mixed-use building to Houston's Tanglewood area
The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.