flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Ware Malcomb finds itself in the mix for multiple diverse projects

Architects

Ware Malcomb finds itself in the mix for multiple diverse projects

Its latest completion is an office/factory/warehouse combo for one of Marvin Window’s brands.


By John Caulfield, Senior Editor | January 5, 2021
Lobby of TruStile's new headquarters in Denver

The door manufacturer TruStile is moving into a new headquarters in Denver designed by Ware Malcomb, one of several projects the firm has completed over the past six or seven months. Image: Inside Out Studios

Despite a coronavirus pandemic that has delayed or postponed projects across typologies and markets, the design firm Ware Malcomb has managed to buck that trend with design work for new buildings and spaces that serve some of the country’s hardest-hit sectors, like retail and offices, as well as some, like industrial, that have prospered during the health crisis.

Since last spring, Ware Malcomb’s completed projects have included:

•In December, the relocation of Key Food Stores Co-op’s corporate offices from Staten Island, N.Y., to 38,000 sf of Class A office space in Old Bridge, N.J. The new digs, on two floors, includes a reception area, conference rooms, a fitness center, and wellness room. The space also features an executive suite, and a test kitchen. Aside from providing interior architecture and design services, Ware Malcomb’s in-house branding studio designed environmental graphics into the workspace and amenity areas.  Unity Construction Services was the project’s GC; CBRE was its broker and project manager.

•New office space for Airspace Technologies, the air transport shipping firm, located within the two-building, 235,000-sf Atlas at Carlsbad (Calif.) campus that Ware Malcomb helped to transform in 2017. Airspace Technologies is leasing 23,000 sf that are divided into three department “neighborhoods”: Design, Engineering, and Administrative. A centrally located reception, boardroom, and break area serves as a hub for employees. Ware Malcomb provided interior architecture and design services for this project, which was completed in October. The GC was Good & Roberts; the CM Hughes Marino; and the furniture supplier Cultura.

•Last summer, the 7,500-sf Vallejo First 5 Center opened as a learning and play space for children five years old or younger from low-income families. The space, inside the Vallejo (Calif.) Shopping Mall, has as its focal point a large indoor playground featuring a fantasy theme of bugs and the outdoors. Ware Malcomb provided the interior design architecture and design services, and Underwood Construction was the GC.

Entrance of Pulp Riot's office space

L'Oreal's Pulp Riot brand is now working out of new office space in Encino, Calif. Image: Haley Hill Photography

Workspace in Pulp Riot's new office

•New offices in Encino, Calif., that Ware Malcomb designed for L’Oreal’s Pulp Riot hair coloring product line. The 6,600-sf space encompasses a hair demo salon, conference rooms, open and flex offices, and a photo studio. It also serves as a training facility for stylists who come from around the country. The GC on this project, completed in July, was Pinnacle.

•Loloi Rugs’ newest facility, which opened in Atlanta last May, is a build-to-suit 646,380-sf building that incorporates a distribution center, warehouse, office space, and product showroom. Ware Malcomb designed 10,000 sf of interior office space and the 5,000-sf showroom. The offices, located on the periphery of the floorplate, have large windows and glass walls to maximize natural light exposure for the space. Ware Malcomb’s GC partner was Alston Construction.

Ware Malcomb designed the interior space and showroom for Loloi Rugs' new warehouse in Atlanta. Image: Johnny McLendon Photography

 

BIO-MASS BOILER A FIRST FOR ITS MARKET

Yesterday, Ware Malcomb announced the completion of the new Denver headquarters for TruStile, an industry leader in interior doors whose parent company is Marvin Windows & Doors. The headquarters includes 50,000 sf of office space and 260,000 sf of manufacturing/production space with a large outdoor amenity deck.

Bringing natural light into the building was an important design feature for TruStile's new headquarters. Image: Inside Out Studios

 

Ware Malcomb provided architecture, interior design, and engineering services for this project, which was built by Ryan Companies. The design team, at TruStile’s behest, ensured the layout of the open office and amenity areas were located near windows as much as possible. The production area is also visible from the building’s training room and various points in the office.

TruStile—which had been operating out of four buildings in Denver—has combined its operations into a single structure whose environmental features include a two-story mechanical building at its northern flank housing a bio-mass boiler that converts sawdust produced by the factory into energy for heating and cooling.

This site was constrained by its proximity to a 100-year floodplain. It required a development permit and a letter of map amendment and letter of map revision based on fill, known as a LOMR-F, whose issuance eliminates the federal flood insurance purchase requirement as a condition of federal or federally backed financing. This project also required a large underground detention system that was the first of its kind in Colorado.

ECOMMERCE IS DRIVING NEW PROJECTS

640 Columbia, a new distribution center in Brooklyn, N.Y.

640 Columbia in Brooklyn, N.Y., will provide “last mile”  distribution logistics for ecommerce. Image credit: Neoscape

 

Among the projects that Ware Malcomb currently has under construction is a multistory distribution center, known as 640 Columbia, which the firm developed in collaboration with DH Property Holdings and the GC firm Suffolk Construction.

Located on 4.5 acres in Brooklyn, N.Y., the 370,000-sf facility—which follows an industrial design prototype that Ware Malcomb came up with in 2017 for land-constrained sites—will provide so-called “last mile” logistics for the delivery of online purchases. The facility will include a warehouse, office space, two levels of truck docks, a mezzanine with parking, and dedicated elevator service on the third floor. An attached 77,853-sf parking structure will accommodate up to 184 vehicles for employees.

Since 2017, Ware Malcomb has designed approximately 20 million sf of industrial distribution projects in North America. The Brooklyn facility is scheduled for completion in the fourth quarter of 2021. Its building team includes SMBH Structural Engineering (SE), WB Engineers and Consultants (MEP/FP), and Bohler Engineering (CE).

Related Stories

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

Multifamily Housing | Apr 12, 2024

Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago

New 33-story Class A rental tower, designed by SCB, will offer 343 rental units. 

Student Housing | Apr 12, 2024

Construction begins on Auburn University’s new first-year residence hall

The new first-year residence hall along Auburn University's Haley Concourse.

K-12 Schools | Apr 11, 2024

Eric Dinges named CEO of PBK

Eric Dinges named CEO of PBK Architects, Houston.

Construction Costs | Apr 11, 2024

Construction materials prices increase 0.4% in March 2024

Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.

Healthcare Facilities | Apr 11, 2024

The just cause in behavioral health design: Make it right

NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.

K-12 Schools | Apr 10, 2024

A San Antonio school will provide early childhood education to a traditionally under-resourced region

In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.

University Buildings | Apr 10, 2024

Columbia University to begin construction on New York City’s first all-electric academic research building

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

K-12 Schools | Apr 10, 2024

Surprise, surprise: Students excel in modernized K-12 school buildings

Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction? 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021