Design intended to foster connection and collaboration across brands.


By Peter Fabris, Contributing Editor | March 9, 2022
Reception Hub
At the Reception Hub, the spatial design encourages the intersection of environments and activities. Courtesy Adrian Wilson.

Verizon Media, a division of Verizon Communications, Inc., embarked on a project to create a space to house multiple digital brands in Manhattan. The 21,700 sf space at 770 Broadway contains two broadcast studios and control rooms used by Verizon Media’s ecosystem of digital brands such as Yahoo, TechCrunch, HuffPost, RYOT, and MAKERS.

Verizon Media Design
The design purposely breaks down the hierarchy of individual spaces, allowing for movement through the hallways and breakout rooms and providing an array of accessible workspaces.

This workplace and broadcast production studio project, headed by Perkins+Will, coincided with the formation of Verizon Media. The chief design aim was to create a signature facility that could foster connection and collaboration across brands.

In addition, Kostow Greenwood Architects, the broadcast production studio architect, highlighted the broadcast production activity and spaces for both staff and visitors. This was particularly challenging, Kostow Greenwood says, because of the inherent nature of broadcast production spaces that require acoustic and visual isolation to maximize productivity in the workspace. The solution included a visible connection between broadcast control rooms and the reception hub area.

Studio
New broadcast hardware, LED lighting and controls advanced the production capabilities for current and future programming, while a new, custom set maximized the possible shooting angles by utilizing all four corners of the room. 

Design Studio

The project team had to be nimble throughout the design process, as the client continued to consolidate staff and productions to a single location as work progressed. This influenced scope and costs, and required the project to respond to broader restacking efforts and facility planning. Also complicating the effort, during the design phase the client negotiated with the building landlord to rededicate building elevators and lobby entrances.

More than half of the floor needed to be functional as a workplace throughout construction. That included support spaces for pantry and food catering. In addition, select broadcast spaces had to continue operations and production as construction progressed.
 
The design broke down the hierarchy of individual spaces, allowing for movement through hallways and breakout rooms and providing a mix of accessible workspace types. The new reception hub serves as both a gateway for visitors and lounge-like workstation for staff meetings, off camera interviews, and editing.
 
Each control room has a dedicated audio booth providing multiple positions with visual connectivity to the control room, reception hub and beyond. Studio A was upgraded for Yahoo Finance, which expanded to full-time production while relocating from another Verizon Media property. New broadcast hardware, LED lighting, and controls enhanced production capabilities for current and future programming, while a new, custom set maximized the possible shooting angles from all four corners of the room.
 
Studio B was outfitted for flexible programming by varying brands. This studio received new broadcast hardware, LED lighting, and controls to advance technical capabilities. An existing truss grid was expanded to optimize shooting angles at multiple corners. 

Broadcast Suite Entry
The entry into the Broadcast Suite highlights activity in the Master Control Room, while providing immediate access to the main workflow circulation.

 

Owner: Verizon Media
Design architect: Kostow Greenwood Architects
Architect of record: Perkins+Will
MEP engineer: Syska Hennessy Group
General contractor/construction manager: L&K Partners, Inc.

Tags

Related Stories

| Jul 11, 2014

First look: Jeanne Gang reinterprets San Francisco Bay windows in new skyscraper scheme

Chicago architect Jeanne Gang has designed a 40-story residential building in San Francisco that is inspired by the city's omnipresent bay windows.

| Jul 11, 2014

Are these LEGO-like blocks the future of construction?

Kite Bricks proposes a more efficient way of building with its newly developed Smart Bricks system.

| Jun 11, 2014

David Adjaye’s housing project in Sugar Hill nears completion

A new development in New York's historic Sugar Hill district nears completion, designed to be an icon for the neighborhood's rich history.

| Apr 8, 2014

Fire resistive curtain wall helps The Kensington meet property line requirements

The majority of fire rated glazing applications occur inside a building to allow occupants to exit the building safely or provide an area of refuge during a fire. But what happens when the threat of fire comes from the outside? This was the case for The Kensington, a mixed-use residential building in Boston.

| Mar 25, 2014

Sydney breaks ground on its version of the High Line elevated park [slideshow]

The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.

| Jan 28, 2014

2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs

Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry. 

| Jan 21, 2014

2013: The year of the super-tall skyscraper

Last year was the second-busiest ever in terms of 200-meter-plus building completions, with 73 towers, according to a report by the Council on Tall Buildings and Urban Habitat.

| Sep 23, 2013

Six-acre Essex Crossing development set to transform vacant New York property

A six-acre parcel on the Lower East Side of New York City, vacant since tenements were torn down in 1967, will be the site of the new Essex Crossing mixed-use development. The product of a compromise between Mayor Michael Bloomberg and various interested community groups, the complex will include ~1,000 apartments.

| May 1, 2013

World’s tallest children’s hospital pushes BIM to the extreme

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.

| Apr 22, 2013

Top 10 green building projects for 2013 [slideshow]

The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021