flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Under40 Leadership Summit draws 71 young leaders to Chicago

Under40 Leadership Summit draws 71 young leaders to Chicago

More than 70 young—that is, under age 40—architects, engineers, and construction professionals descended on Chicago in early October with one thought in mind: to learn how to “create with clarity.”


By By Robert Cassidy | November 11, 2012
Dont touch the ivyits historic! The U40 Leadership Summit participants assemb
Dont touch the ivyits historic! The U40 Leadership Summit participants assembled before the 400-foot centerfield sign at Wrig
This article first appeared in the November 2012 issue of BD+C.

More than 70 young—that is, under age 40—architects, engineers, and construction professionals descended on Chicago in early October with one thought in mind: to learn how to “create with clarity.”

That was the theme of Building Design+Construction’s Second Annual “Under40 Leadership Summit,” held October 3-5 in partnership with AIA Chicago. The program brought together past honorees in BD+C’s “40 Under 40” program with under-40 AEC professionals nominated by their respective firms for networking and interactive leadership development.

The two-and-a-half-day program got started Wednesday afternoon, October 3, with a two-hour tour of Chicago’s architectural heritage along the Chicago River. A docent from the Chicago Architecture Foundation provided an articulate commentary on more than 50 architectural treasures, including works by Harry Weese, Bertrand Goldberg, SOM, and Perkins+Will.

Later that evening, the U40 attendees assembled at the Hotel Monaco, where Autodesk Fellow Tom Wujec, the Summit’s principal facilitator, led them in “The Great Chicago Marshmallow Challenge.” Teams of three or four were given 20 sticks of spaghetti, a yard of tape, a yard of string, and a marshmallow. They had 18 minutes to erect the tallest structure they could, with the stipulation that the marshmallow had to be on top.

Several structures collapsed. Participants were surprised by how much the marshmallow weighed. The winning structure measured 29½ inches in height—about average, according to Wujec, but well short of the record (more than 50 inches). No marshmallows were eaten during the competition (it happens, Wujec says).

Thursday, October 4, was devoted entirely to Wujec’s “Create with Clarity” mobile workshop. Wujec started the group off with what seemed to be a simple exercise: without using words, visualize—through drawing—how to make toast.

Where they came from


The following organizations were represented at the U40 Leadership Summit:

Adrian Smith + Gordon Gill, Argonne National Laboratory, Arquitectonica, BSA LifeStructures, Contract Management Inc. Dewberry, DLR Group, Enclos – Advanced Technology Studio, G3 Construction Group, Gensler, Harley Ellis Devereaux, HDR Architecture, Heery International, Hill International, HKS Architects, HMC Architects, Hoar Program Management, HOK, Johnson Controls, KJWW Engineering Consultants, KLMK Group, Legat Architects, Montalba Architects, Mortenson, Niles Bolton Associates, Norcon Inc., O’Brien Construction, Pepper Construction, Perkins+Will, Playground Ideas, Reichgott Engineering, Rogers Krajnak Architects, roomTEN Design, Ryan Companies US, School of the Art Institute of Chicago, SmithGroupJJR, Solomon Cordwell Buenz, Swinerton Builders, Syska Hennessy Group, Tarlton Corporation, Tilton Kelly + Bell, TLC Engineering for Architecture, University of Illinois at Urbana-Champaign, UrbanWorks, Valerio Dewalt Train Associates, VOA Associates, Walker Parking Consultants, Walter P Moore & Associates, and Wight & Co.

Teams of six to eight then each took on a specific question related to their professional or personal lives. Among the topics: How do we grow our firm? How do we use technology more wisely? How do we balance the demands of work with the needs of our personal lives and families?

The teams then went out into the city—to the North Michigan Avenue “Magnificent Mile,” to the Lake Michigan lakefront, to Millennium Park. Their mission: to find inspiration that would help them present a visual representation of their question—and even a solution.

Upon their return, the teams engaged in extensive development of the oversize posters for their visual presentations, a couple of which also took the form of a skit. Final presentations were made in rapid order,

Wujec then led the entire group in a discussion of the meaning of the visualizations and how to apply the process and concepts learned in their daily work and personal lives.

To the Friendly Confines

Friday, October 5, opened with an early morning bus ride to Wrigley Field, home of the Chicago Cubs, where the group was greeted by Tom Ricketts, the team chairman, Steven J. Jacobsen, SCDP, President of Jacobsen Development Advisors, and Carl Rice, Vice President of Baseball Operations for the Cubs.

Jacobsen, who has been retained by the Cubs to create the business plan and high-level concepts for the renovation of the nearly century-old sports facility, and Rice, who has worked for the Cubs since his high school days, provided an in-depth discussion of the history and evolution of the ballpark, from its days as Weeghman Park (1914) to the installation of lights (1988) and up to current plans for improvements to the electrical and structural systems.

They then led U40 participants on an hour-long tour of the park, from the bowels of the locker room to the heights of the upper deck.

The U40 Leadership Summit ended with a hot dog lunch at the Cubby Bear, a Wrigleyville sports and entertainment landmark.

Participants earned up to 11.0 AIA/CES Discovery learning units for attending all sessions.

Sponsors for the U40 Summit: Andersen Windows and Doors, the Vinyl Institute, SAGE Electrochromics, Georgia-Pacific, the American Institute of Steel Construction, and Sprint. +

Related Stories

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021