flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Tutor Perini Corp. to Implement Textura Prequalification Management Companywide

Tutor Perini Corp. to Implement Textura Prequalification Management Companywide

Rollout across the Tutor Perini organization will enhance the subcontractor prequalification experience and enable a standardized process in support of the contractor default insurance program.


By Posted by Raissa Rocha, Associate Editor | January 29, 2013

Tutor Perini Corp., a civil and building construction company, has begun a companywide adoption of Textura Corp.'s Prequalification Management (Textura–PQM) system. Tutor Perini is utilizing Textura—PQM to collect all prequalification data and attachments.  A standardized prequalification form and process will facilitate subcontractor prequalification and deliver significant efficiencies and improved risk management.

Bill Sparks, Tutor Perini's Executive Vice President, Treasurer, and Corporate Secretary, said, "In today's marketplace and as a requirement of our insurance program there is an increased emphasis on the selection and management of our subcontracting process. We have established uniform corporate guidelines for the administration of this program. We selected Textura's Prequalification Management system to be the backbone of our subcontractor prequalification process.  PQM will allow us to maintain an on-going qualified status with our thousands of subcontractors in markets across the United States."

Textura's flexible PQM tool will create a shared process for all business units while still allowing local offices to customize requirements to unique conditions in local markets.  The business units will continue to make all subcontractor selection decisions – but PQM will allow them to spend more time reviewing qualifications and less time gathering data.

"We are extremely pleased to add Tutor Perini Corp. to our fast-growing PQM client base," said Patrick Allin, Chairman and CEO of Textura.  "They are a top 10 GC with operations and a strong reputation throughout the U.S. and around the world.  The rigorous selection process they went through to pick PQM ensures a good fit with their prequalification program. Tutor Perini will benefit from an automated, robust prequalification process. Our clients are using PQM to help them achieve more effective prequalification programs." 

Tutor Perini selected Textura—PQM after a detailed analysis of the available prequalification solutions on the market, including existing bid management systems and ERP packages which have a prequalification module. 

Roger Donley, Tutor Perini's Corporate Director Risk Management, said, "Tutor Perini's requirements for a prequalification system were fairly simple: 1) Minimize labor and resource requirements within the business units; 2) Create a consistent process and workflow that can be utilized by all business units; and 3) The product should be an online service that allows for secured and centralized access to data by all involved."

Textura—PQM will provide for easier, more efficient data collection and improved access to subcontractor prequalification information across the Tutor Perini organization. It helps mitigate risk by providing a collaborative solution that facilitates electronic submission, review, and updating of all prequalification documents. +

Related Stories

Construction Costs | Feb 27, 2024

Experts see construction material prices stabilizing in 2024

Gordian’s Q1 2024 Quarterly Construction Cost Insights Report brings good news: Although there are some materials whose prices have continued to show volatility, costs at a macro level are returning to a level of stability, suggesting predictable historical price escalation factors. 

Construction Costs | Feb 22, 2024

K-12 school construction costs for 2024

Data from Gordian breaks down the average cost per square foot for four different types of K-12 school buildings (elementary schools, junior high schools, high schools, and vocational schools) across 10 U.S. cities.

MFPRO+ Special Reports | Feb 22, 2024

Crystal Lagoons: A deep dive into real estate's most extreme guest amenity

These year-round, manmade, crystal clear blue lagoons offer a groundbreaking technology with immense potential to redefine the concept of water amenities. However, navigating regulatory challenges and ensuring long-term sustainability are crucial to success with Crystal Lagoons.

Architects | Feb 21, 2024

Architecture Billings Index remains in 'declining billings' state in January 2024

Architecture firm billings remained soft entering into 2024, with an AIA/Deltek Architecture Billings Index (ABI) score of 46.2 in January. Any score below 50.0 indicates decreasing business conditions.

AEC Tech | Feb 20, 2024

AI for construction: What kind of tool can artificial intelligence become for AEC teams?

Avoiding the hype and gathering good data are half the battle toward making artificial intelligence tools useful for performing design, operational, and jobsite tasks.

Building Tech | Feb 20, 2024

Construction method featuring LEGO-like bricks wins global innovation award

A new construction method featuring LEGO-like bricks made from a renewable composite material took first place for building innovations at the 2024 JEC Composites Innovation Awards in Paris, France.

AEC Tech | Feb 20, 2024

ABC releases technology guide for AI in construction

Associated Builders and Contractors has released an artificial intelligence (AI) technology guide for the U.S. construction industry. AI in Construction — What Does It Mean for Our Contractors? outlines definitions, construction use cases, and considerations for the implementation of AI in construction.  

Codes and Standards | Feb 20, 2024

AISC, AIA release second part of design assist guidelines for the structural steel industry

The American Institute of Steel Construction and AIA Contract Documents have released the second part of a document intended to provide guidance for three common collaboration strategies.

Student Housing | Feb 19, 2024

UC Law San Francisco’s newest building provides student housing at below-market rental rates

Located in San Francisco’s Tenderloin and Civic Center neighborhoods, UC Law SF’s newest building helps address the city’s housing crisis by providing student housing at below-market rental rates. The $282 million, 365,000-sf facility at 198 McAllister Street enables students to live on campus while also helping to regenerate the neighborhood.

MFPRO+ News | Feb 15, 2024

UL Solutions launches indoor environmental quality verification designation for building construction projects

UL Solutions recently launched UL Verified Healthy Building Mark for New Construction, an indoor environmental quality verification designation for building construction projects.

boombox1 - default
boombox2 -
native1 -

More In Category


Contractors

AGC releases decarbonization playbook to help assess, track, reduce GHG emissions

The Associated General Contractors of America released a new, first-of-its-kind, decarbonization playbook designed to help firms assess, track, and reduce greenhouse gas emissions on projects. The AGC Playbook on Decarbonization and Carbon Reporting in the Construction Industry is part of the association’s efforts to make sure construction firms play a leading role in crafting carbon-reduction measures for the industry.


Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021