A new hospital in Ontario will nearly triple the care capacity of its existing facility—becoming the largest hospital in Canada.
In Mississauga, a suburb of Toronto, hospital system Trillium Health Partners (THP) will fully replace its Mississauga Hospital with a new facility that will increase the number of operating rooms from 14 to 23 and include more than 950 beds. At approximately 2.8 million square feet and 24 floors, the new Mississauga Hospital will feature modern hospital facilities and technology and reflect the latest standards in infection prevention and control.
THP’s emergency department, one of the busiest in Canada, will significantly expand to improve patient experience and reduce wait times. The hospital will house advanced diagnostic imaging facilities and a new pharmacy and clinical laboratory. And it will continue to deliver specialized care through regional programs, such as the regional center for advanced cardiac surgery and neurosurgery services, among others.
With design and engineering services by global integrated design firm Stantec, the new Mississauga Hospital will be a critical part of THP’s plan to provide healthcare that serves the growing community for decades to come.
“Critical health infrastructure, like Trillium Health Partners’ Mississauga site, are essential to advance quality healthcare in Ontario and keep our diverse communities healthy,” Suzanne Crysdale, Stantec principal, says in a statement.
Mississauga Hospital marks the second Stantec project for THP. In December, Stantec announced it will provide design and engineering services for a nine-floor, 600,000-square-foot patient tower with over 350 beds.
In recent years, Stantec has designed several major healthcare projects in Ontario, including Cortellucci Vaughan Hospital’s 1.2 million-square-foot facility; Cambridge Memorial Hospital’s patient care wing; Brockville General Hospital’s complex for continuing care, mental health, and rehabilitation; and Centre for Addiction and Mental Health’s redevelopment project.
Related Stories
Healthcare Facilities | Mar 22, 2023
New Jersey’s new surgical tower features state’s first intraoperative MRI system
Hackensack (N.J.) University Medical Center recently opened its 530,000-sf Helena Theurer Pavilion, a nine-story surgical and intensive care tower designed by RSC Architects and Page. The county’s first hospital, Hackensack University Medical Center, a 781-bed nonprofit teaching and research hospital, was founded in 1888.
Project + Process Innovation | Mar 22, 2023
Onsite prefabrication for healthcare construction: It's more than a process, it's a partnership
Prefabrication can help project teams navigate an uncertain market. GBBN's Mickey LeRoy, AIA, ACHA, LEED AP, explains the difference between onsite and offsite prefabrication methods for healthcare construction projects.
Modular Building | Mar 20, 2023
3 ways prefabrication doubles as a sustainability strategy
Corie Baker, AIA, shares three modular Gresham Smith projects that found sustainability benefits from the use of prefabrication.
Building Tech | Mar 14, 2023
Reaping the benefits of offsite construction, with ICC's Ryan Colker
Ryan Colker, VP of Innovation at the International Code Council, discusses how municipal regulations and inspections are keeping up with the expansion of off-site manufacturing for commercial construction. Colker speaks with BD+C's John Caulfield.
Healthcare Facilities | Mar 13, 2023
Next-gen behavioral health facilities use design innovation as part of the treatment
An exponential increase in mental illness incidences triggers new behavioral health facilities whose design is part of the treatment.
Healthcare Facilities | Mar 6, 2023
NBBJ kicks off new design podcast with discussion on behavioral health facilities
During the second week of November, the architecture firm NBBJ launched a podcast series called Uplift, that focuses on the transformative power of design. Its first 30-minute episode homed in on designing for behavioral healthcare facilities, a hot topic given the increasing number of new construction and renovation projects in this subsector.
Sustainability | Mar 2, 2023
The next steps for a sustainable, decarbonized future
For building owners and developers, the push to net zero energy and carbon neutrality is no longer an academic discussion.
University Buildings | Feb 23, 2023
Johns Hopkins shares design for new medical campus building named in honor of Henrietta Lacks
In November, Johns Hopkins University and Johns Hopkins Medicine shared the initial design plans for a campus building project named in honor of Henrietta Lacks, the Baltimore County woman whose cells have advanced medicine around the world. Diagnosed with cervical cancer, Lacks, an African-American mother of five, sought treatment at the Johns Hopkins Hospital in the early 1950s. Named HeLa cells, the cell line that began with Lacks has contributed to numerous medical breakthroughs.
Healthcare Facilities | Feb 21, 2023
Cleveland's Glick Center hospital anchors neighborhood revitalization
The newly opened MetroHealth Glick Center in Cleveland, a replacement acute care hospital for MetroHealth, is the centerpiece of a neighborhood revitalization. The eleven-story structure is located within a ‘hospital-in-a-park’ setting that will provide a bucolic space to the community where public green space is lacking. It will connect patients, visitors, and staff to the emotional and physical benefits of nature.
Multifamily Housing | Feb 16, 2023
Coastal Construction Group establishes an attainable multifamily housing division
Coastal Construction Group, one of the largest privately held construction companies in the Southeast, has announced a new division within their multifamily sector that will focus on the need for attainable housing in South Florida.