Rank Company 2012 Government Revenue ($)
1 Fluor $3,301,919,000
2 URS Corp. $693,536,105
3 AECOM Technology Corp. $522,390,000
4 Jacobs Engineering Group $422,670,000
5 STV $196,225,000
6 Michael Baker Jr. $109,360,000
7 Science Applications International Corp. $66,429,538
8 Parsons Brinckerhoff $56,438,739
9 Merrick & Co. $54,500,000
10 H&A Architects & Engineers $40,736,471
11 Burns & McDonnell $39,650,000
12 Clark Nexsen $36,047,902
13 Arup $31,337,694
14 Allen & Shariff $28,205,000
15 Dewberry $26,366,107
16 Eaton Energy Solutions $21,042,636
17 Smith Seckman Reid $19,741,666
18 Simpson Gumpertz & Heger $19,300,000
19 Affiliated Engineers $16,707,000
20 Guernsey $13,137,397
21 Barge, Waggoner, Sumner and Cannon $12,200,000
22 Syska Hennessy Group $11,919,278
23 Coffman Engineers $11,189,000
24 RMF Engineering Design $9,625,000
25 Walker Parking Consultants $9,000,000
25 KPFF Consulting Engineers $9,000,000
25 Rolf Jensen & Associates $9,000,000
28 WSP USA $8,500,000
29 BRPH $8,230,500
30 Shive-Hattery $7,887,925
31 Bridgers & Paxton Consulting Engineers $7,642,938
32 Wiss, Janney, Elstner Associates $7,573,000
33 SSOE Group $5,961,076
34 TTG $5,857,540
35 Vanderweil Engineers $5,707,000
36 TLC Engineering for Architecture $5,573,256
37 Newcomb & Boyd $5,548,078
38 KCI Technologies $5,500,000
39 Walter P Moore $5,411,370
40 Ross & Baruzzini $5,396,261
41 Heapy Engineering $5,063,419
42 KJWW Engineering Consultants $4,859,400
43 GHT Limited $4,750,000
44 Degenkolb Engineers $4,517,695
45 Bard, Rao + Athanas Consulting Engineers $4,500,000
46 Glumac $4,490,000
47 Sparling $4,464,265
48 Interface Engineering $4,363,221
49 RDK Engineers $4,197,000
50 Aon Fire Protection Engineering $4,100,000
51 Thornton Tomasetti $4,020,020
52 CCRD Partners $4,000,000
53 Spectrum Engineers $3,443,455
54 M/E Engineering $3,403,050
55 GRW $3,385,623
56 H.F. Lenz $3,295,000
57 GRAEF $3,113,082
58 French & Parrello Associates $3,100,000
59 Henderson Engineers $2,266,357
60 Apogee Consulting Group $2,121,000
61 Haynes Whaley Associates $2,041,785
62 Bergmann Associates $2,010,000
63 Davis, Bowen & Friedel $1,833,731
64 Brinjac Engineering $1,707,652
65 M-E Engineers $1,630,000
66 AKF Group $1,236,900
67 Paulus, Sokolowski and Sartor $1,150,000
67 Dunham Associates $1,150,000
69 Buro Happold Consulting Engineers $1,030,000
70 Primera Engineers $925,000
71 Middough $850,000
72 Environmental Systems Design $836,185
73 CTLGroup $800,000
74 ThermalTech Engineering $625,000
75 Peter Basso Associates $500,000
76 Zak Companies $443,642
77 Mazzetti $432,838
78 CJL Engineering $358,000
79 OLA Consulting Engineers $300,000
80 Rist-Frost-Shumway Engineering $250,000
81 KLH Engineers $228,505
82 Wick Fisher White $213,850
83 Wallace Engineering $200,000
84 G&W Engineering $170,000
85 Total Building Commissioning $154,396
86 P2S Engineering $59,268
87 FBA Engineering $50,000
88 Kamm Consulting $27,425
 

Back to Government Giants article

 

Read the full 2013 Giants 300 Report

Related Stories

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

| Apr 22, 2014

Bright and bustling: Grimshaw reveals plans for the Istanbul Grand Airport [slideshow]

In partnership with the Nordic Office of Architecture and Haptic Architects, Grimshaw Architects has revealed its plans for the terminal of what will be one of the world's busiest airports. The terminal is expected to serve 150 million passengers per year.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 4, 2014

$25 million Orion Jet Center designed by SchenkelShultz now open

As the centerpiece of the 45-acre campus, which is its first phase of a planned 215-acre mixed-use development, the 18,000 square foot executive terminal facility offers spacious passenger areas, administrative space, an executive suite, rental car kiosk, catering and a cafe. 

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

| Mar 5, 2014

5 tile design trends for 2014

Beveled, geometric, and high-tech patterns are among the hot ceramic tile trends, say tile design experts.

| Mar 1, 2014

Dramatic fractal roof highlights SOM's new Mumbai airport terminal [slideshow]

The terminal merges new technology and traditional regional architecture, notably in the fractal roof canopy that runs throughout the terminal. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021