flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

SMPS announces Build Business 2012 keynote speakers

SMPS announces Build Business 2012 keynote speakers

National conference set for July 11–13 in San Francisco.


By By BD+C Staff | February 21, 2012

The Society for Marketing Professional Services (SMPS) is pleased to announce the keynote speakers for Build Business: Take Action, the 2012 SMPS National Conference: Greg Bennick, motivational speaker and founder of One Hundred For Haiti, and Greg Bell, author and founder, Water the Bamboo Center for Leadership.

The only business development, marketing, and management conference for the design and building industry, Build Business will bring together leading experts, practitioners, and marketing and business development professionals in San Francisco July 11-13. This action- packed 3-day conference offers attendees 30 powerful learning sessions, 2 dynamic keynote speakers, and unparalleled networking to make and renew priceless business contacts.

Build Business: Take Action is a call to action for professional services marketers, business developers, and their firms: What actions do firms need to take now to position themselves as leaders in their markets? To capitalize on relationships? To win new work? To build the bottom line? Attendees of Build Business 2012 will be challenged by the keynote speakers to “Unleash Your Potential” and “Become the Change” they want to see in their companies and communities.

On Thursday, July 12, Greg Bennick will guide conference attendees, with laughter, through a program that explores perspectives on change. For him, change is something to be played with, embraced, and worked with. To take action most effectively, we first must realize that we are already agents of change.

A change agent himself and the founder of One Hundred For Haiti, Bennick has been to Haiti multiple times since the earthquake to document conditions and work to bring about transformation. Immediately after the January 12 earthquake, he sailed as part of the crew of the Liberty Schooner, an all-volunteer mission that left from Miami bringing 10,000 pounds of medical supplies and food to Haiti’s southern coast.2

On Friday, July 13, Greg Bell will draw on principles in his book Water The Bamboo: Unleashing the Potential of Teams and Individuals, to illustrate how self-responsibility, patience, and persistence can instill meaning in our work, create value for our companies and families, and help us achieve remarkable results.

Founder of the Water the Bamboo Center for Leadership, Bell is a keen observer of highly successful people and teams. He distills his findings into a metaphor for individual and team success: If you water giant timber bamboo, in the first year, nothing happens. In the second year, nothing happens. In the third year, nothing happens. But in the fourth year, that bamboo will rocket up an astonishing 90 feet in only 60 days. Those who understand the principles of the bamboo farmer will see their visions suddenly explode into reality.

For more information about these speakers and the Build Business conference, including the schedule of events, educational program, breakout session descriptions, registration fees, and sponsoring/exhibiting opportunities, go to www.buildbusiness.org. Discounted early-bird registration is available. BD+C

Related Stories

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021