flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

Mixed-Use

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

The 800,000-gsf mixed-use project is located at 10660 NE 8th Street.


By David Malone, Associate Editor | July 22, 2020
The Eight ground level

All renderings courtesy Pickard Chilton

Skanska has recently selected Pickard Chilton to design The Eight, a 25-story tower set to be built in Bellevue, Wash.

The project will feature 540,000-sf of commercial office space with open floor plates and 10-foot ceiling heights, a 7,000-sf public plaza, 12,000-sf of ground floor retail, and a 1,200-sf retail pavilion built with heavy timber. Seven of the floors will feature balconies and a private, 3,000-sf rooftop deck with a retractable roof will also be included. A unique, activated space dubbed the “Living Room” will act as a “third place” public amenity for gathering, working, and socialization directly connected to local retail.

 

The Eight exterior

 

Amenities such as a fitness center, event space, and a landscaped terrace are included on the double-height second floor. An underground parking garage will include parking for 200 cars along with parking for over 200 bicycles. The Eight’s location at 10660 NE 8th Street offers immediate pedestrian access to the new light rail station and Bellevue transit center as well as direct freeway access. The tower’s massing is articulated with exposed structure and balconies that are interwoven with greenery to know the building together.  

A healthy HVAC system and touchless controls are included while the spacious lobby and multiple terraces and outdoor spaces will help to keep the building’s tenants and visitors socially distanced. The Eight is targeting LEED Gold and Fitwel certifications.

 

The Eight upper floors and terrace

Tags

Related Stories

Mixed-Use | Dec 28, 2020

BIG designs new mixed-use development in Harlem

The project, dubbed The Smile, has recently completed construction.

Urban Planning | Dec 6, 2020

Ford lays out plans for mobility innovation district in Detroit

Its centerpiece is an abandoned train depot whose architecture and decay reflect two sides of this city’s past.

Mixed-Use | Oct 19, 2020

Commonwealth Pier revitalization project begins construction in Boston’s Seaport

CBT, in collaboration with Schmidt Hammer Lassen Architects designed the project.

Mixed-Use | Oct 2, 2020

Zaha Hadid Architects unveils 2 Murray Road in Hong Kong

The project reinterprets the structural forms and layering of a Bauhinia bud about to blossom.

Reconstruction & Renovation | Sep 30, 2020

SOM reimagines former Cook County Hospital into mixed-use destination

The project is the first phase of a proposed $1 billion redevelopment plan for the area in Chicago.

Mixed-Use | Sep 23, 2020

SOM-designed waterfront neighborhood will include 1,045-foot-tall tower

The project will focus on harnessing the sea and the sun to create a low-carbon waterfront community.

Mixed-Use | Sep 7, 2020

Google proposes 40-acre redevelopment that includes nearly 2,000 housing units

Lendlease will manage the design and construction, as a partner in a multi-development deal struck last year between the two companies.

Mixed-Use | Sep 3, 2020

10 Design will redevelop the Nanjing Dajiaochang Airport

The old military airport will become a contemporary mixed-use destination.

Mixed-Use | Aug 17, 2020

New Sydney towers will have the world’s first AI-driven facade system

SOM and Fender Katsalidis are designing the project.

boombox1
boombox2
native1

More In Category




MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021