flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Skanska completes primary construction work on Nashville’s largest ever mixed-use project

Mixed-Use

Skanska completes primary construction work on Nashville’s largest ever mixed-use project

Gresham Smith is serving as architect-of-record for the entire project and is part of the design team with Pappageorge Haymes and Gensler.


By David Malone, Associate Editor | February 24, 2021
Fifth + Broadway aerial at night

Images courtesy Gresham Smith

Over the past four years, Nashville’s first convention center has been undergoing a transformation into Fifth + Broadway, a new mixed-use development comprising 2.2 million sf. The development represents the largest single phase mixed-use project in Nashville’s history.

Fifth + Broadway is designed to be a live/work/play district in the heart of downtown Nashville. It includes a 415-foot, 386-unit apartment tower and a 24-story office tower that comprises 372,000 sf of Class A office space and amenities. The residential tower will be the tallest for-rent apartment tower in Tennessee while the office tower will include amenities such as a 19,000 sf indoor/outdoor amenity deck.

 

Fifth + Broadway office corner

 

The project will also feature 239,000 sf of entertainment, retail, and cultural space. This will include The National Museum of African American Music and Assembly Food Hall, a multi-level dining and entertainment destination with over 20 restaurants and a music venue. Additionally, 2,253 parking spots will be spread across three separate structures.

 

Fifth + Broadway metropolis corner

 

On Feb. 24, Skanska announced the completion of the core of its work as general contractor on Fifth + Broadway in advance of its March 4 opening of retail and dining. Below are some of the project’s statistical highlights:

— Approximately 250,000 pounds of explosives were used for excavation during the development phase—approximately the weight in July Fourth fireworks that Americans purchase annually.

— 15,408 tons of concrete and 3,875 tons of steel have been recycled from the demolition of the Convention Center. This total weight is equal to nearly two Eiffel Towers.

— 70,750 tons of material have been recycled from construction debris—approximately the weight of 353 blue whales.

— 98,500 cubic yards of concrete were used for this project—equal to 29 Olympic Swimming Pools.

— During the construction of Fifth + Broadway, Skanska worked through the 2019 NFL draft and CMA Fest, which brought a combined 680,000 fans to Nashville.

— 7,000 workers made this project possible, and they included 105 prime subcontractors and 61 small, minority-owned, women-owned and veteran subcontractors. The project is tracking more than $70 million to be spent on diverse businesses throughout construction.

— Skanska has logged 3.2 million work hours to date.

— If Fifth + Broadway’s three towers were stacked on top of each other, they would measure 894 feet high—equivalent to the Rockefeller Center in New York City.

— There are 1,600 stairs in Fifth + Broadway’s residential tower leading to 386 apartment units for rent.

— Fifth + Broadway’s parking garage can hold 2,145 cars, which, if parked bumper to bumper, would stretch from the Country Music Hall of Fame and Museum to the Nashville Zoo.

 

Fifth + Broadway Aerial

 

Fifth + Broadway residential deck

 

Fifth + Broadway aerial photo

Tags

Related Stories

Mixed-Use | Jul 19, 2019

Lendlease and Google to develop mixed-use neighborhoods in San Francisco Bay

The residential, retail, hospitality, and other civic components have an estimated development value of $15 billion. 

Mixed-Use | Jul 2, 2019

Brooklyn’s Flatbush Caton Market redevelopment will preserve the Caribbean community amidst gentrification

Freeform + Deform designed the building with Magnusson Architecture + Planning as the Architect of Record.

Mixed-Use | Jun 20, 2019

SOM-designed mixed-use tower opens in Sydney

The building is located in Sydney’s Central Business District.

Mixed-Use | Jun 13, 2019

Site of former Motorola headquarters will become a mixed-use district

UrbanStreet Group and Antunovich Associates are developing the master plan for the project.

Mixed-Use | Jun 3, 2019

12-story mixed-use development opens in Washington, D.C.

Cooper Carry designed the project.

Mixed-Use | May 28, 2019

Broward County Convention Center expansion to include Headquarters Hotel

Omni Hotels & Resorts will manage the County-owned hotel.

Mixed-Use | May 23, 2019

237-room hotel will anchor Nashville’s new $540 million mixed-use development

Chartwell Hospitality will operate the hotel.

Mixed-Use | May 15, 2019

Puerto Rican mixed-use, mixed income housing development begins construction

Álvarez-Díaz & Villalón designed the project.

Mixed-Use | May 14, 2019

Mixed-use community breaks ground in Greenville, S.C.

The Beach Company is developing the project.

boombox1 - default
boombox2 -
native1 -

More In Category



MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021