flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Secluded sanctuary: Alnoba leadership training center

Building Team Awards

Secluded sanctuary: Alnoba leadership training center

Leadership training center becomes New England’s first Passive House building.


By David Barista, Editorial Director | June 13, 2017

Trent Bell Photography.

This exemplary project reminds us that our buildings can be both sustainable and beautiful, comfortable and efficient,” said Building Team Awards judge Bill Kline, AIA, EDAC, LEED AP, Vice President and Healthcare Studio Leader at SmithGroupJJR.

The 14,000-sf Alnoba leadership training center is the first project in New England to meet the quality and building performance standards prescribed by the Passive House energy model. A highly insulated shell—12 to 14 inches thick, incorporating triple-pane thermally insulated windows from Germany—wraps the entire building to achieve solar heat recovery. Five radiant-floor heating zones within the slabs cover 75% of the public spaces. 

The Building Team went to great lengths to meet the stringent performance standards while realizing the owner’s design vision. This includes timber frames that were built using historic hand tools and traditional methods to ensure authenticity, beauty, and strength.

 

Reclaimed and recreated timber frames and triple-pane thermally insulated windows highlight the groundbreaking Passive House design of the Alnoba leadership development center. Trent Bell Photography.

 

Building Team – Submitting firm, general contractor Callahan Construction Managers Owner Kensington Investment Company Architect GO Logic Structural engineer Becker Structural Engineers Mechanical Petersen Engineering Electrical Engineered Building Systems Plumbing engineer Granite State Plumbing and Heating

General Information – Size 14,000 sf Cost $10.4 million Construction time November 2014 to August 2016 Delivery method GMP

 

Trent Bell Photography.

 

Return to the 2017 Building Team Awards landing page

Related Stories

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Building Team Awards | Apr 5, 2015

UK's leading foot and mouth disease lab turns containment design inside out

A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside.

Building Team Awards | Apr 5, 2015

‘Project first’ philosophy shows team’s commitment to a true IPD on the San Carlos Center

Skanska and NBBJ join forces with Sutter Health on a medical center project where all three parties share the risk.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021