flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The Scott A. McGregor Computer Science Center completes on Harvey Mudd College’s campus

University Buildings

The Scott A. McGregor Computer Science Center completes on Harvey Mudd College’s campus

Steinberg Hart designed the project.


By David Malone, Associate Editor | June 18, 2021
McGregor Computer Science Center exterior
McGregor Computer Science Center exterior

The Scott A. McGregor Computer Science Center has recently completed on the Harvey Mudd College campus in Claremont, Calif.

The three-story, 36,000-sf building brings the entirety of the computer science program under one roof for the first time. The project includes labs, clinic space, student study and collaboration space, and administrative and faculty offices.

 

McGregor Computer Science Center courtyard

 

A expansive lobby on the first floor welcomes students and visitors and provides space to study, gather, and collaborate. Faculty offices, clinic and project studios, teaching and research laboratories, and collaboration spaces all meant to serve the computer science program are housed on the second and third floors.

 

SEE ALSO: Radford University’s new $80.5 million Center for Adaptive Innovation and Creativity

 

The computer science space brings together the previously fragmented elements such as student project areas, clinic program work areas, and computer labs. These floors encircle a central courtyard that brings transparency and natural light to the building’s circulation spaces.

 

McGregor Computer Science Center interior gathering space

 

The building also includes a makerspace for use by the entire campus. The makerspace design is focused on creating one large open workspace for collaboration, networking, and socialization. The space features a zoned layout that includes a collaborative lounge, co-working and idea development areas, rapid prototyping, and light-to-medium fabrication. The makerspace is located adjacent to renovated metal and wood machine shops for heavy fabrication needs.

In addition to Steinberg Hart, the build team also included DPR Construction.

 

McGregor Computer Science Center view from the stairs

 

McGregor Computer Science Center gathering space

Related Stories

University Buildings | Jul 6, 2022

Wenzhou-Kean University opens a campus building that bridges China’s past and future

After pandemic-related stops and starts, Wenzhou-Kean University’s Ge Hekai Hall has finally begun to see full occupancy.

University Buildings | Jun 9, 2022

IDEA Factory at U. of Maryland defies gravity

The E.A. Fernandez IDEA Factory at the University of Maryland’s A. James Clark School of Engineering has a gravity-defying form: The seven-story building’s solid upper floors emerge above the lighter, mostly glass base.

University Buildings | Jun 7, 2022

Newfoundland university STEM building emulates natural elements, local traditions

Memorial University of Newfoundland (MUN) recently opened a new building that will provide interdisciplinary learning and research space for Faculties of Science and Engineering.

Museums | May 31, 2022

University of Texas at Dallas breaks ground on new 12-acre cultural district

The University of Texas at Dallas (UT Dallas) recently broke ground on the Crow Museum of Asian Art, the first phase of a new 12-acre cultural district on campus.

Building Team | May 20, 2022

Caltech breaks ground on a new center to study climate and sustainability

The California Institute of Technology (Caltech) recently broke ground on its Resnick Sustainability Resource Center.

Laboratories | May 20, 2022

Brutalist former Berkeley Art Museum transformed into modern life science lab

After extensive renovation and an addition, the former Berkeley Art Museum and Pacific Film Archive at the University of California, Berkeley campus reopened in May 2022 as a modern life science lab building.

Sports and Recreational Facilities | May 19, 2022

Northern Arizona University opens a new training center for its student athletes

In Flagstaff, Ariz. Northern Arizona University (NAU) has opened its new Student-Athlete High Performance Center. 

University Buildings | May 16, 2022

Yale’s newly renovated Schwarzman Center enriches student campus social life

Robert A.M. Stern Architects (RAMSA) recently unveiled the design of their restoration of the Schwarzman Center at Yale University, which includes dining spaces, a bar, and a food shop.

School Construction | May 11, 2022

New Digital Learning Commons at Rutgers supports doctoral programs in over 16 disciplines

The new Digital Learning Commons at the Rutgers University Archibald S. Alexander Library provides students in over 16 courses of study and four professional schools with spacious collaborative and study space.

Sponsored | BD+C University Course | May 10, 2022

Designing smarter places of learning

This course explains the how structural steel building systems are suited to construction of education facilities.

boombox1 - default
boombox2 -
native1 -

More In Category




Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021